| {{#Wiki_filter:Vc res Engincenng and constNct:en Deholt Edison EEEF">>e October 28, 1982 EF2 - 60,310 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555 | | {{#Wiki_filter:}} |
| | |
| ==Dear Mr. Kintner:==
| |
| | |
| ==Reference:==
| |
| Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341
| |
| | |
| ==Subject:==
| |
| Radiological Emergency-Response Plan Section B Onsite Emergency Organization Table B.1 Staffing for Fermi 2 Emergency Response Organization _
| |
| The augmentation times of 30/90 listed in the last two columns of Table B.1 under Alert or Above and Site Area or General Emergency will be changed to 30/60(a) with a change in Footnote (a) to read:
| |
| (a) The 30/60 augmentation criteria is a goal for staffing the ERFs on a timely basis as stated in Subsection B.1.2 on Page B-2 and as iden-tified in Supplement 1 to NUREG-0737 This change will be reflected in Revision 2 to the Plan.
| |
| Sincerely, f/
| |