PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924 b PDR ADOCK 05000368 19 P PDR $ | |||
INSTRUMENTATION , | |||
i INCORE DETECTORS l l' LIMITING CONDITION FOR OPERATION l i | |||
j 3.3.3.2 The incore detection system shall be OPERABLE with: | |||
l | |||
* i a. At least 75% of all incore detectors with at least one incore l l d | |||
detector in each quadrant at each level, and : | |||
4 | |||
: b. At least 75% of all incore detector locations *, and j 4 | |||
t | |||
: c. Sufficient operable incore detectors to perform at least six tilt l | |||
^ | |||
estimates with at least one tilt estimate at each of three j levels. l t | |||
An OPERABLE incore detector location shall consist of a fuel assembly ( | |||
i containing either a fixed detector string with a minimum of three OPERABLE [ | |||
l rhodium detectors or an OPERABLE movable incore detector capable of mapping _; | |||
the location. l | |||
! I A tilt estimate can be made from two sets of symmetric pairs of incore | |||
; detectors. Two sets of symmetric pairs of incore detectors are formed by . | |||
l ' | |||
two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant. ; | |||
AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB , | |||
margin. | |||
l ACTION: ! | |||
With the incore detection system inoperable, do not use the system for the j above applicable monitoring or calibration functions. The provisions of j Specifications 3.0.3 are not applicable. | |||
SURVEILLANCE REQUIREMENTS l 4.3.3.2 The incore detection system shall be demonstrated OPERABLE: j | |||
: a. By performance of a CHANNEL CHECK within 24 hours prior to its , | |||
use and at least once per 7 days thereafter when required for ! | |||
monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin. l | |||
: b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components. The neutron detectors shall i l be calibrated prior to installation in the reactor core. ! | |||
i | |||
* For the remainder of Fuel Cycle 10 the incore detection system may be , | |||
cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full l | |||
~ | |||
1.0% increase in overall uncertainty on the CECOR F y measurement) are applied to the COLSS and CPCs. | |||
ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 63, 434 l i | |||
a- &-m, A = s .-A - dd.En, - #u - .b n p s m l | |||
1 s | |||
i i | |||
f i | |||
? | |||
l t | |||
MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS , | |||
I (FOR INFO ONLY) ! | |||
.I i | |||
-l f | |||
l l | |||
r | |||
) | |||
I l | |||
l l | |||
l | |||
i ! | |||
i | |||
. l INSTRUMENTATION | |||
( ; | |||
t l | |||
INCORE DETECTORS i LIMITING CONDITION FOR OPERATION 3.3.3.2 The incore detection system shall be OPERABLE with: t | |||
: a. At least 75% of oil incore detectors 1 with at least one incore l detector in each quadrant at each level, and { | |||
: b. At least 75% of all incore detector locations 1, and l- | |||
: c. Sufficient operable incore detectors to perform at least six tilt ! | |||
estimates with at least one tilt estimate at each of three ! | |||
levele ; | |||
An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping , | |||
the location. I A tilt estimate can be made f rom two sets of symmetric pairs of incore j detectors. Two sets of symmetric pairs of incore detectors are formed by ; | |||
two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant. | |||
i AEELICAB111)): When the incore detection system is used for monitoring the ! | |||
AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB ; | |||
margin. ; | |||
f ACllfli: l 4 | |||
[ | |||
With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions. The provisions of Specifications 3.0.3 are not applicable. l SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated OPERABLE: | |||
: a. By performance of a CHANNEL CHECK within 24 hours prior to its , | |||
use and at least once per 7 days thereafter when required for i monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin. | |||
: b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall ; | |||
be calibrated prior to installation in the reactor core llor the=nem_aj m nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_ | |||
==ponsi dere dRERAB LEx wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d | |||
_ d e t e ct.o r.._l ora ti on s .prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full | |||
= lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr | |||
_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 53, 434 l | |||
_m.. . . _ ~._ | |||
l l- at an se faulpBB | |||
' SEA E AOWN ECsERI l | |||
Entergy Operations, Inc. | |||
Arkansas Nuclear One - Unit 2 i September 21, 1993 ' | |||
l A-93-026 1 | |||
Mr. F. T. Philpott | |||
* Entergy Operations, Inc. | |||
Arkansas Nuclear One P. O. Box 608 , | |||
Russellville AR 72801 | |||
==Subject:== | |||
ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced i Number of Operable incore Detectors | |||
==Dear Mr. Philpott:== | |||
This letter provides revised COLSS and CPCS addressable constants and COLSS : | |||
database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a l reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information i provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures. i The revised COLSS and CPCS constants are provided in Enclosure 1. Enclosure 1 i also contains a Software Media Transfer Form to be signed and returned to M. ; | |||
A. Book at ABB Windsor. Enclosure 2 contains supporting information, j including an administrative procedure change, for the proposed Technical , | |||
Specification change and a marked up copy of the proposed new Technical i Specification. ' | |||
The information provided in this letter supercedes that provided, based on i engineering judgement, in Reference 1. As expected, the information provided in Reference I has been shown to have excess conservatism. | |||
If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647. | |||
Sincerely, COMBUSTION ENGINEERING, INC. | |||
f hA'E DIWs D. R. Earles | |||
/ | |||
Project Manager, Nuclear fuel ' | |||
l ABB Combustion Engineering Nuclear Power c~en on-enc. g gs g n= ggmeg,g81911 Windso' Connectcat C6095-0500 Te'er 99297 COf/ BEN WSOR | |||
1 F. T. Philpott Page 2 A-93-026 l | |||
==Enclosures:== | |||
: 1. COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors | |||
: 2. Proposed Changes to Incore Detector Technical ' | |||
Specification | |||
==Reference:== | |||
: 1. D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993. | |||
xc: . | |||
M. A. Book 5318-GC28 (CE) | |||
J. A. Brown 5318-GC28 (CE) | |||
S. P. Emery 9341-0425 (CE) | |||
S. Etemadi 5318-GC28 (CE) | |||
C. B. Franklin Entergy/ECH (w/o encl.) | |||
S. F. Grill 5318-GC28 (CE) | |||
J. G. llead Entergy/AN0 K. L. Heitman 5318-GC28 (CE) | |||
R. B. Lang Entergy/ECH K. H. Marquis 5318-GC28 (CE) | |||
M. R. McKinney Entergy/ANO | |||
: 0. C. Mims Entergy/AN0 W. E. Russell 5318-GC28 (CE) | |||
P. Rensen 5318-GC28 (CE) | |||
R. C. Sykes ABB-CE/AN0 E. L. Trapp 5304-GC27 (CE) (w/o encl .) | |||
C. H. Turk Entergy/AND R. M. Wilkins Entergy/ECH (w/o encl.) ' | |||
R. S. Wirges Entergy/ANO J. D. Young 5304-GC27 (CE) | |||
K. T. Zelnick Entergy/AND ANO-DCC Entergy/ANO i | |||
i I}} | |||
Revision as of 23:02, 14 March 2020
| ML20057D068 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/24/1993 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20046D604 | List: |
| References | |
| NUDOCS 9310010056 | |
| Download: ML20057D068 (6) | |
Text
________________
PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924 b PDR ADOCK 05000368 19 P PDR $
INSTRUMENTATION ,
i INCORE DETECTORS l l' LIMITING CONDITION FOR OPERATION l i
j 3.3.3.2 The incore detection system shall be OPERABLE with:
l
- i a. At least 75% of all incore detectors with at least one incore l l d
detector in each quadrant at each level, and :
4
- b. At least 75% of all incore detector locations *, and j 4
t
- c. Sufficient operable incore detectors to perform at least six tilt l
^
estimates with at least one tilt estimate at each of three j levels. l t
An OPERABLE incore detector location shall consist of a fuel assembly (
i containing either a fixed detector string with a minimum of three OPERABLE [
l rhodium detectors or an OPERABLE movable incore detector capable of mapping _;
the location. l
! I A tilt estimate can be made from two sets of symmetric pairs of incore
- detectors. Two sets of symmetric pairs of incore detectors are formed by .
l '
two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant. ;
AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB ,
margin.
l ACTION: !
With the incore detection system inoperable, do not use the system for the j above applicable monitoring or calibration functions. The provisions of j Specifications 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS l 4.3.3.2 The incore detection system shall be demonstrated OPERABLE: j
- a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its ,
use and at least once per 7 days thereafter when required for !
monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin. l
- b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components. The neutron detectors shall i l be calibrated prior to installation in the reactor core. !
i
- For the remainder of Fuel Cycle 10 the incore detection system may be ,
cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full l
~
1.0% increase in overall uncertainty on the CECOR F y measurement) are applied to the COLSS and CPCs.
ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 63, 434 l i
a- &-m, A = s .-A - dd.En, - #u - .b n p s m l
1 s
i i
f i
?
l t
MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS ,
I (FOR INFO ONLY) !
.I i
-l f
l l
r
)
I l
l l
l
i !
i
. l INSTRUMENTATION
( ;
t l
INCORE DETECTORS i LIMITING CONDITION FOR OPERATION 3.3.3.2 The incore detection system shall be OPERABLE with: t
- a. At least 75% of oil incore detectors 1 with at least one incore l detector in each quadrant at each level, and {
- b. At least 75% of all incore detector locations 1, and l-
- c. Sufficient operable incore detectors to perform at least six tilt !
estimates with at least one tilt estimate at each of three !
levele ;
An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping ,
the location. I A tilt estimate can be made f rom two sets of symmetric pairs of incore j detectors. Two sets of symmetric pairs of incore detectors are formed by ;
two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.
i AEELICAB111)): When the incore detection system is used for monitoring the !
AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB ;
margin. ;
f ACllfli: l 4
[
With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions. The provisions of Specifications 3.0.3 are not applicable. l SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated OPERABLE:
- a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its ,
use and at least once per 7 days thereafter when required for i monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
- b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall ;
be calibrated prior to installation in the reactor core llor the=nem_aj m nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_
==ponsi dere dRERAB LEx wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d
_ d e t e ct.o r.._l ora ti on s .prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full
= lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr
_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 53, 434 l
_m.. . . _ ~._
l l- at an se faulpBB
' SEA E AOWN ECsERI l
Entergy Operations, Inc.
Arkansas Nuclear One - Unit 2 i September 21, 1993 '
l A-93-026 1
Mr. F. T. Philpott
- Entergy Operations, Inc.
Arkansas Nuclear One P. O. Box 608 ,
Russellville AR 72801
Subject:
ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced i Number of Operable incore Detectors
Dear Mr. Philpott:
This letter provides revised COLSS and CPCS addressable constants and COLSS :
database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a l reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information i provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures. i The revised COLSS and CPCS constants are provided in Enclosure 1. Enclosure 1 i also contains a Software Media Transfer Form to be signed and returned to M. ;
A. Book at ABB Windsor. Enclosure 2 contains supporting information, j including an administrative procedure change, for the proposed Technical ,
Specification change and a marked up copy of the proposed new Technical i Specification. '
The information provided in this letter supercedes that provided, based on i engineering judgement, in Reference 1. As expected, the information provided in Reference I has been shown to have excess conservatism.
If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.
Sincerely, COMBUSTION ENGINEERING, INC.
f hA'E DIWs D. R. Earles
/
Project Manager, Nuclear fuel '
l ABB Combustion Engineering Nuclear Power c~en on-enc. g gs g n= ggmeg,g81911 Windso' Connectcat C6095-0500 Te'er 99297 COf/ BEN WSOR
1 F. T. Philpott Page 2 A-93-026 l
Enclosures:
- 2. Proposed Changes to Incore Detector Technical '
Specification
Reference:
- 1. D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.
xc: .
M. A. Book 5318-GC28 (CE)
J. A. Brown 5318-GC28 (CE)
S. P. Emery 9341-0425 (CE)
S. Etemadi 5318-GC28 (CE)
C. B. Franklin Entergy/ECH (w/o encl.)
S. F. Grill 5318-GC28 (CE)
J. G. llead Entergy/AN0 K. L. Heitman 5318-GC28 (CE)
R. B. Lang Entergy/ECH K. H. Marquis 5318-GC28 (CE)
M. R. McKinney Entergy/ANO
- 0. C. Mims Entergy/AN0 W. E. Russell 5318-GC28 (CE)
P. Rensen 5318-GC28 (CE)
R. C. Sykes ABB-CE/AN0 E. L. Trapp 5304-GC27 (CE) (w/o encl .)
C. H. Turk Entergy/AND R. M. Wilkins Entergy/ECH (w/o encl.) '
R. S. Wirges Entergy/ANO J. D. Young 5304-GC27 (CE)
K. T. Zelnick Entergy/AND ANO-DCC Entergy/ANO i