PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924                    b PDR                  ADOCK 05000368 19 P                              PDR  $
 
INSTRUMENTATION                                                                            ,
i    INCORE DETECTORS                                                                          l l'    LIMITING CONDITION FOR OPERATION                                                            l i
j    3.3.3.2  The incore detection system shall be OPERABLE with:
l
* i          a. At least 75% of all incore detectors with at least one incore              l  l d
detector in each quadrant at each level, and                                  :
4
: b. At least 75% of all incore detector locations *, and                        j 4
t
:          c. Sufficient operable incore detectors to perform at least six tilt              l
^
estimates with at least one tilt estimate at each of three                    j levels.                                                                        l t
An OPERABLE incore detector location shall consist of a fuel assembly                    (
i containing either a fixed detector string with a minimum of three OPERABLE                [
l    rhodium detectors or an OPERABLE movable incore detector capable of mapping              _;
the location.                                                                            l
  !                                                                                            I A tilt estimate can be made from two sets of symmetric pairs of incore
;    detectors. Two sets of symmetric pairs of incore detectors are formed by              .
l                                                                                            '
two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant.                                                                    ;
AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB                ,
margin.
l ACTION:                                                                                  !
With the incore detection system inoperable, do not use the system for the                j above applicable monitoring or calibration functions.        The provisions of          j Specifications 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS                                                                l 4.3.3.2    The incore detection system shall be demonstrated OPERABLE:                    j
: a. By performance of a CHANNEL CHECK within 24 hours prior to its                ,
use and at least once per 7 days thereafter when required for                  !
monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.                                            l
: b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components. The neutron detectors shall                i l              be calibrated prior to installation in the reactor core.                      !
i
* For the remainder of Fuel Cycle 10 the incore detection system may be                  ,
cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full                  l
                                                                                                ~
1.0% increase in overall uncertainty on the CECOR F y measurement) are applied to the COLSS and CPCs.
ARKANSAS - UNIT 2                    3/4 3-28  Amendment No. 63, 434                  l i
 
a-              &-m, A  =    s  .-A - dd.En, - #u - .b    n p s m l
1 s
i i
f i
                                                                                ?
l t
MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS                    ,
I (FOR INFO ONLY)                                      !
                                                                                .I i
                                                                                -l f
l l
r
                                                                                )
I l
l l
l
 
i                                                                                                                              !
i
      .                                                                                                                      l INSTRUMENTATION
(                                                                                                                              ;
t l
INCORE DETECTORS                                                                                                    i LIMITING CONDITION FOR OPERATION 3.3.3.2      The incore detection system shall be OPERABLE with:                                                  t
: a. At least 75% of oil incore detectors 1 with at least one incore                                  l detector in each quadrant at each level, and                                                        {
: b.      At least 75% of all incore detector locations 1, and                                            l-
: c.      Sufficient operable incore detectors to perform at least six tilt                                  !
estimates with at least one tilt estimate at each of three                                          !
levele                                                                                            ;
An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping                                        ,
the location.                                                                                                      I A tilt estimate can be made f rom two sets of symmetric pairs of incore                                            j detectors.          Two sets of symmetric pairs of incore detectors are formed by                                  ;
two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.
i AEELICAB111)): When the incore detection system is used for monitoring the                                          !
AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB                                          ;
margin.                                                                                                            ;
f          ACllfli:                                                                                                            l 4
[
With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions.                        The provisions of Specifications 3.0.3 are not applicable.                                                                          l SURVEILLANCE REQUIREMENTS 4.3.3.2          The incore detection system shall be demonstrated OPERABLE:
: a.      By performance of a CHANNEL CHECK within 24 hours prior to its                                    ,
use and at least once per 7 days thereafter when required for                                    i monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.
: b.      At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components.              The neutron detectors          shall            ;
be calibrated prior to installation in the reactor core llor the=nem_aj m              nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_
            ==ponsi dere dRERAB LEx wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d
_ d e t e ct.o r.._l ora ti on s .prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full
          = lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr
_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2                          3/4 3-28        Amendment No. 53, 434                              l
 
_m.. .            .          _  ~._
l l-                                            at an se faulpBB
                                            ' SEA E AOWN ECsERI l
Entergy Operations, Inc.
Arkansas Nuclear One - Unit 2              i September 21, 1993                        '
l A-93-026 1
Mr. F. T. Philpott
* Entergy Operations, Inc.
Arkansas Nuclear One P. O. Box 608                                                                                          ,
Russellville AR 72801
 
==Subject:==
ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced                        i Number of Operable incore Detectors
 
==Dear Mr. Philpott:==
 
This letter provides revised COLSS and CPCS addressable constants and COLSS                            :
database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a                                l reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information                          i provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures.                                                i The revised COLSS and CPCS constants are provided in Enclosure 1.                        Enclosure 1  i also contains a Software Media Transfer Form to be signed and returned to M.                          ;
A. Book at ABB Windsor. Enclosure 2 contains supporting information,                                  j including an administrative procedure change, for the proposed Technical                                ,
Specification change and a marked up copy of the proposed new Technical                                i Specification.                                                                                        '
The information provided in this letter supercedes that provided, based on                              i engineering judgement, in Reference 1. As expected, the information provided in Reference I has been shown to have excess conservatism.
If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.
Sincerely, COMBUSTION ENGINEERING, INC.
f      hA'E DIWs D. R. Earles
                                                                            /
Project Manager, Nuclear fuel                                '
l ABB Combustion Engineering Nuclear Power c~en on-enc.        g gs g n=                          ggmeg,g81911 Windso' Connectcat C6095-0500      Te'er 99297 COf/ BEN WSOR
 
1 F. T. Philpott                Page 2                            A-93-026  l
 
==Enclosures:==
: 1. COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors
: 2. Proposed Changes to Incore Detector Technical          '
Specification
 
==Reference:==
: 1. D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.
xc:                                                                      .
M. A. Book        5318-GC28    (CE)
J. A. Brown      5318-GC28    (CE)
S. P. Emery      9341-0425    (CE)
S. Etemadi        5318-GC28    (CE)
C. B. Franklin    Entergy/ECH        (w/o encl.)
S. F. Grill      5318-GC28    (CE)
J. G. llead      Entergy/AN0 K. L. Heitman    5318-GC28    (CE)
R. B. Lang        Entergy/ECH K. H. Marquis    5318-GC28    (CE)
M. R. McKinney    Entergy/ANO
: 0. C. Mims        Entergy/AN0 W. E. Russell    5318-GC28    (CE)
P. Rensen        5318-GC28    (CE)
R. C. Sykes      ABB-CE/AN0 E. L. Trapp      5304-GC27    (CE)  (w/o encl .)
C. H. Turk        Entergy/AND R. M. Wilkins    Entergy/ECH        (w/o encl.)                          '
R. S. Wirges      Entergy/ANO J. D. Young      5304-GC27    (CE)
K. T. Zelnick    Entergy/AND ANO-DCC          Entergy/ANO i
i I}}

Revision as of 23:02, 14 March 2020

Proposed Tech Spec 3.3.3.2,revising LCO Re Incore Detection Sys
ML20057D068
Person / Time
Site: Arkansas Nuclear 
Issue date: 09/24/1993
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20046D604 List:
References
NUDOCS 9310010056
Download: ML20057D068 (6)


Text

________________

PROPOSED TECHNICAL SPECIFICATIONS CHANGES 9310010056 930924 b PDR ADOCK 05000368 19 P PDR $

INSTRUMENTATION ,

i INCORE DETECTORS l l' LIMITING CONDITION FOR OPERATION l i

j 3.3.3.2 The incore detection system shall be OPERABLE with:

l

  • i a. At least 75% of all incore detectors with at least one incore l l d

detector in each quadrant at each level, and  :

4

b. At least 75% of all incore detector locations *, and j 4

t

c. Sufficient operable incore detectors to perform at least six tilt l

^

estimates with at least one tilt estimate at each of three j levels. l t

An OPERABLE incore detector location shall consist of a fuel assembly (

i containing either a fixed detector string with a minimum of three OPERABLE [

l rhodium detectors or an OPERABLE movable incore detector capable of mapping _;

the location. l

! I A tilt estimate can be made from two sets of symmetric pairs of incore

detectors. Two sets of symmetric pairs of incore detectors are formed by .

l '

two pairs of diagonally opposite symmetric incore detectors, one incore detector per quadrant.  ;

AE'ELICABILUY : When the incore detection system is used for monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB ,

margin.

l ACTION:  !

With the incore detection system inoperable, do not use the system for the j above applicable monitoring or calibration functions. The provisions of j Specifications 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS l 4.3.3.2 The incore detection system shall be demonstrated OPERABLE: j

a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its ,

use and at least once per 7 days thereafter when required for  !

monitoring the AZIMUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin. l

b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but-includes all electronic components. The neutron detectors shall i l be calibrated prior to installation in the reactor core.  !

i

  • For the remainder of Fuel Cycle 10 the incore detection system may be ,

cor.sidered OPERABLE with <75% and 250% of all incore detectors and detector locations provided the appropriate penalties (based on a full l

~

1.0% increase in overall uncertainty on the CECOR F y measurement) are applied to the COLSS and CPCs.

ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 63, 434 l i

a- &-m, A = s .-A - dd.En, - #u - .b n p s m l

1 s

i i

f i

?

l t

MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS ,

I (FOR INFO ONLY)  !

.I i

-l f

l l

r

)

I l

l l

l

i  !

i

. l INSTRUMENTATION

(  ;

t l

INCORE DETECTORS i LIMITING CONDITION FOR OPERATION 3.3.3.2 The incore detection system shall be OPERABLE with: t

a. At least 75% of oil incore detectors 1 with at least one incore l detector in each quadrant at each level, and {
b. At least 75% of all incore detector locations 1, and l-
c. Sufficient operable incore detectors to perform at least six tilt  !

estimates with at least one tilt estimate at each of three  !

levele  ;

An OPERABLE incore detector location shall consist of a fuel assembly containing either a fixed detector string with a minimum of three OPERABLE rhodium detectors or an OPERABLE movable incore detector capable of mapping ,

the location. I A tilt estimate can be made f rom two sets of symmetric pairs of incore j detectors. Two sets of symmetric pairs of incore detectors are formed by  ;

two pairs of diagonally opposite symmetric incore detectors. one incore detector per quadrant.

i AEELICAB111)): When the incore detection system is used for monitoring the  !

AZlMUTHAL POWER TILT, radial peaking f actors, local power density or DNB  ;

margin.  ;

f ACllfli: l 4

[

With the incore detection system inoperable, do not use the system for the above applicable monitoring or calibration f unctions. The provisions of Specifications 3.0.3 are not applicable. l SURVEILLANCE REQUIREMENTS 4.3.3.2 The incore detection system shall be demonstrated OPERABLE:

a. By performance of a CHANNEL CHECK within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to its ,

use and at least once per 7 days thereafter when required for i monitoring the AZ'MUTHAL POWER TILT, radial peaking f actors, local power density or DNB margin.

b. At least once per 18 months by performance of a CHANNEL CALIBRATION operation which exempts the neutron detectors but includes all electronic components. The neutron detectors shall  ;

be calibrated prior to installation in the reactor core llor the=nem_aj m nder_oflueLCyrle_l0._the=Jacpr.e=_detectiondyJ1em_may_b_e_

==ponsi dere dRERAB LEx wi t h315La n d._250Lof_ a llint ore _d e t eg tor _s_an d

_ d e t e ct.o r.._l ora ti on s .prnylde d =1h e_ app r opria t e= pen alt i es J b a s ei on_ a_ full

= lALJ E cLe ale =i a-91eLallJ D C ert ai nly=a n=4 h e=C EC OLfg.measurementLa rr

_..a ppJlig d_t o_t h e_CO LS S_an d_Q C L ARKANSAS - UNIT 2 3/4 3-28 Amendment No. 53, 434 l

_m.. . . _ ~._

l l- at an se faulpBB

' SEA E AOWN ECsERI l

Entergy Operations, Inc.

Arkansas Nuclear One - Unit 2 i September 21, 1993 '

l A-93-026 1

Mr. F. T. Philpott

  • Entergy Operations, Inc.

Arkansas Nuclear One P. O. Box 608 ,

Russellville AR 72801

Subject:

ANO-2 Cycle 10 COLSS and CPCS Addressable Constants for a Reduced i Number of Operable incore Detectors

Dear Mr. Philpott:

This letter provides revised COLSS and CPCS addressable constants and COLSS  :

database constant K09 for ANO-2 Cycle 10 based on an analysis assuming a l reduction in the Technical Specification 3.3.3.2 minimum percent operable incore detector locations from 75% to a value as low as 50%. The information i provided in this letter has been verified in accordance with ABB-Combustion Engineering Nuclear Fuel Quality Assurance procedures. i The revised COLSS and CPCS constants are provided in Enclosure 1. Enclosure 1 i also contains a Software Media Transfer Form to be signed and returned to M.  ;

A. Book at ABB Windsor. Enclosure 2 contains supporting information, j including an administrative procedure change, for the proposed Technical ,

Specification change and a marked up copy of the proposed new Technical i Specification. '

The information provided in this letter supercedes that provided, based on i engineering judgement, in Reference 1. As expected, the information provided in Reference I has been shown to have excess conservatism.

If you have any questions on the contents of this lettcr, please contact me or Mr. Sasan Etemadi at (203) 285-3647.

Sincerely, COMBUSTION ENGINEERING, INC.

f hA'E DIWs D. R. Earles

/

Project Manager, Nuclear fuel '

l ABB Combustion Engineering Nuclear Power c~en on-enc. g gs g n= ggmeg,g81911 Windso' Connectcat C6095-0500 Te'er 99297 COf/ BEN WSOR

1 F. T. Philpott Page 2 A-93-026 l

Enclosures:

1. COLSS and CPCS Addressable Constants for Reduction of Operable Incore Detectors
2. Proposed Changes to Incore Detector Technical '

Specification

Reference:

1. D. R. Earles to F. T. Philpott, " Reduction of the Number of Operable Incore Detectors for ANO-2 Cycle 10," A-93-027, September 16, 1993.

xc: .

M. A. Book 5318-GC28 (CE)

J. A. Brown 5318-GC28 (CE)

S. P. Emery 9341-0425 (CE)

S. Etemadi 5318-GC28 (CE)

C. B. Franklin Entergy/ECH (w/o encl.)

S. F. Grill 5318-GC28 (CE)

J. G. llead Entergy/AN0 K. L. Heitman 5318-GC28 (CE)

R. B. Lang Entergy/ECH K. H. Marquis 5318-GC28 (CE)

M. R. McKinney Entergy/ANO

0. C. Mims Entergy/AN0 W. E. Russell 5318-GC28 (CE)

P. Rensen 5318-GC28 (CE)

R. C. Sykes ABB-CE/AN0 E. L. Trapp 5304-GC27 (CE) (w/o encl .)

C. H. Turk Entergy/AND R. M. Wilkins Entergy/ECH (w/o encl.) '

R. S. Wirges Entergy/ANO J. D. Young 5304-GC27 (CE)

K. T. Zelnick Entergy/AND ANO-DCC Entergy/ANO i

i I