Line 21: |
Line 21: |
|
| |
|
| ENCLOSURE 2 AFW Suction Pressure Trip Setpoint Determination reset 6.29 psig 6.132 psig ALT = +I-0.061 psi (ID) | | ENCLOSURE 2 AFW Suction Pressure Trip Setpoint Determination reset 6.29 psig 6.132 psig ALT = +I-0.061 psi (ID) |
| -
| |
| APS = 6.04 psig | | APS = 6.04 psig |
| -, __
| |
| \ AFL = +I-0.092 psi | | \ AFL = +I-0.092 psi |
| __ _ ___
| |
| .--
| |
| ---
| |
| --b _- __ | | --b _- __ |
| / 5.948 psig Margin = 0.035 psi NTSP = PL + TLE AUPL 1 TLE = 0.1 13 psi 5.913 psig 5.8 psig AL = Analytical Limit PL = Process Limit TLE = Total Loop Error (Measured + Unmeasured uncertancies) | | / 5.948 psig Margin = 0.035 psi NTSP = PL + TLE AUPL 1 TLE = 0.1 13 psi 5.913 psig 5.8 psig AL = Analytical Limit PL = Process Limit TLE = Total Loop Error (Measured + Unmeasured uncertancies) |
Line 46: |
Line 41: |
|
| |
|
| ENCLOSURE 4 AFW Discharge Pressure Trip Setpoint Determination | | ENCLOSURE 4 AFW Discharge Pressure Trip Setpoint Determination |
| .............................. 900 psi | | .............................. 900 psi ALT = +I- 10 psi (ID) APS = 886 psig AFL (AV) = +I- 14 psi 872 psi Margin = 1 psi NTSP = PL + TLE 871 psi |
| ....................................
| |
| ALT = +I- 10 psi (ID) APS = 886 psig AFL (AV) = +I- 14 psi 872 psi Margin = 1 psi NTSP = PL + TLE 871 psi | |
| ----T--TLE = 18 psi AUPL 853 psi AL = Analytical Limit PL = Process Limit TLE =Total Loop Error (Measured + Unmeasured uncertancies) | | ----T--TLE = 18 psi AUPL 853 psi AL = Analytical Limit PL = Process Limit TLE =Total Loop Error (Measured + Unmeasured uncertancies) |
| APS = Actual Plant Setpoint AFL = As Found Limit (APS +I- Measured Uncertancies) | | APS = Actual Plant Setpoint AFL = As Found Limit (APS +I- Measured Uncertancies) |
Latest revision as of 20:26, 14 March 2020
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23222A1532023-08-29029 August 2023 Solutions Restore Enclosure RAI 1 - Final ML22032A3252022-02-0202 February 2022 Enclosure - Request for Additional Information ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21257A0692021-09-30030 September 2021 Enclosure - Request for Additional Information - Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendment ML20050E1012020-02-21021 February 2020 Letter-RAI 1 - MAGNASTOR-Kewaunee Exemption with Enclosure ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A1562016-02-10010 February 2016 Request for Additional Information for Kewaunee Power Station License Amendment Request for Emergency Plan Changes ML14115A0412014-08-14014 August 2014 Request for Additional Information, License Amendment Request to Revise Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action ML12118A4652012-04-26026 April 2012 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - ML12115A0752012-04-23023 April 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Replacement Draft Items ML12093A4812012-04-0202 April 2012 RAI - Kewaunee Relief Requests Under TAC ME7378 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12066A0082012-03-0202 March 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request- Chi-over-Q - Aadb Request for Additional ML12023A0572012-01-13013 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) - Firm RAI Items ML12023A0472012-01-0909 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) ML11339A0012011-12-0101 December 2011 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Eicb Request for Additional Information (RAI) ML1106303592011-03-0707 March 2011 Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan ML1036305892011-01-0606 January 2011 Request for Additional Information, Kewaunee Power Station Relief Request No. RR-2-2, Steam Generator Large-Bore Snubber Inspection and Testing for Fourth 10-Year Interval ML1028102572010-10-0505 October 2010 Attachment: ME4011 Request for Additional Information (RAI) ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1025003572010-09-10010 September 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1014103222010-05-27027 May 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1009503792010-04-14014 April 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1006903992010-03-11011 March 2010 Request for Additional Information for the Review of the Kewaunee Power Station, License Renewal Application ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion ML0935003062010-01-0404 January 2010 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0933104432009-12-16016 December 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0932400952009-12-0303 December 2009 Request for Additional Information for the Review of the Kewaunee License Renewal Application - Aging Management Review/Aging Management Program ML0918908362009-11-20020 November 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 ML0923900632009-10-13013 October 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0921205462009-08-28028 August 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) ML0920902962009-07-27027 July 2009 Response to Request for Additional Information for Inservice Inspection Program Fourth Ten-year Interval Proposed Alternative No. RR-1-11 ML0920802542009-07-27027 July 2009 E-mail 7/27/09 Re Kewaunee Request for Information ML0918805552009-07-16016 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Structures Scoping/Fire Protection ML0918109582009-07-13013 July 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Programs ML0918900172009-07-10010 July 2009 RAI Regarding the Environmental Review of the License Renewal Application for Kewaunee Power Station ML0911903892009-07-0707 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Leak-Before-Break ML0918311242009-07-0202 July 2009 Request a Conference Call to Discuss an Open Issue in the Draft Safety Evaluation Regarding Fire Protection for Extended Power Uprate ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps ML0911201992009-04-30030 April 2009 RAI, Review of the License Renewal Application - Scoping & Screening Methodology ML0907607862009-04-0303 April 2009 License Renewal Application Review, Request for Additional Information - Balance of Plant Scoping and Screening 2023-09-21
[Table view] |
Text
ENCLOSURE 2 AFW SUCTION PRESSURE TRIP SETPOINT DETERMINATION 1 Page Follows
ENCLOSURE 2 AFW Suction Pressure Trip Setpoint Determination reset 6.29 psig 6.132 psig ALT = +I-0.061 psi (ID)
APS = 6.04 psig
\ AFL = +I-0.092 psi
--b _- __
/ 5.948 psig Margin = 0.035 psi NTSP = PL + TLE AUPL 1 TLE = 0.1 13 psi 5.913 psig 5.8 psig AL = Analytical Limit PL = Process Limit TLE = Total Loop Error (Measured + Unmeasured uncertancies)
APS = Actual Plant Setpoint AFL = As Found Limit (APS +I- Measured Uncertancies)
ALT = As Left Tolerance (APS +I- Instrument Accuracy)
ID = Instrument Drift (Measured Uncertancies)
Page 1 of 1
ENCLOSURE 3 ILLUSTRATIVE SCHEMATIC OF THE AFW SUCTION AND DISCHARGE PRESSURE TRIP CIRCUITS 1 Page Follows
ENCLOSURE 3 Illustrative Schematic of the AFW Suction and Discharge Pressure Trip Circuits NWJLsi
- 1. R
- REUDTE CONTROL IN COHTROL R O W L = LOCAL CONTROL AT DEDICATED WUTWWN PANEL
- 2. W V CONTACT OPEN WHEN SW W R Y VALVE OPEN.
FOR INFORMATION ONLY SIMPLIFIED 'A' AFW PUMP SUCTION PRESSURE (SPI AND DISCHARGE PRESSURE (DP) T R I P CIRCUITS Page 1 of 1
ENCLOSURE 4 AFW DISCHARGE PRESSURE TRIP SETPOINT DETERMINATION 1 Page Follows
ENCLOSURE 4 AFW Discharge Pressure Trip Setpoint Determination
.............................. 900 psi ALT = +I- 10 psi (ID) APS = 886 psig AFL (AV) = +I- 14 psi 872 psi Margin = 1 psi NTSP = PL + TLE 871 psi
T--TLE = 18 psi AUPL 853 psi AL = Analytical Limit PL = Process Limit TLE =Total Loop Error (Measured + Unmeasured uncertancies)
APS = Actual Plant Setpoint AFL = As Found Limit (APS +I- Measured Uncertancies)
ALT = As Left Tolerance (APS +I- lnstrument Accuracy)
ID = Instrument Drift (Measured Uncertancies)
INWC = inches water column Page 1 of 1