ML17209A220: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17266A276
| number = ML17266A276
| issue date = 09/30/1980
| issue date = 09/30/1980
| title = Forwards LER 80-049/03L-0
| title = LER 80-049/03L-0:on 800904,during Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
| author name = Pace P
| author name = Pace P
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 10:47, 8 March 2020

Forwards LER 80-049/03L-0
Date released: 01/25/2018 Download: ML17209A220


LER 80-049/03L-0:on 800904,during Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
ML17266A276
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A276 (3)
Forwards LER 80-049/03L-0
ML17209A219
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A219 (2)