ML17244A488: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 6: | Line 6: | ||
| number = ML17261A114 | | number = ML17261A114 | ||
| issue date = 04/30/1979 | | issue date = 04/30/1979 | ||
| title = | | title = LER 79-007/03L-0 on 790402:surveillance Requirement for Nuclear Intermediate Range Channel Test within Seven Days Was Not Performed for Two Training Criticalities.Caused by Unclear Training Procedures | ||
| author name = Peck C | | author name = Peck C | ||
| author affiliation = ROCHESTER GAS & ELECTRIC CORP. | | author affiliation = ROCHESTER GAS & ELECTRIC CORP. | ||
Latest revision as of 04:31, 8 March 2020
| Date released: 04/30/2018 | Download: ML17244A488 |
|---|---|
| ML17261A114 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/30/1979 |
| From: | Peck C ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML17261A114 (2) | |
| ML17244A487 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/30/1979 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML17244A487 (2) | |