ML17263B038: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 6: Line 6:
| number = ML17263B039
| number = ML17263B039
| issue date = 04/18/1995
| issue date = 04/18/1995
| title = Forwards Plant 1995 SG Eddy Current Exam Summary Rept Re Number of Repairs Required Resulting from Insps Performed During 1995 Outage
| title = Summary Exam Rept for 1995 SG Eddy Current Insp,Rev 0.
| author name = Davison M, Saporito M
| author name = Davison M, Saporito M
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.

Latest revision as of 23:22, 7 March 2020

Forwards Plant 1995 SG Eddy Current Exam Summary Rept Re Number of Repairs Required Resulting from Insps Performed During 1995 Outage
Date released: 04/30/2018 Download: ML17263B038


Summary Exam Rept for 1995 SG Eddy Current Insp,Rev 0.
ML17263B039
Person / Time
Site: Ginna 
Issue date: 04/18/1995
From: Davison M, Saporito M
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17263B039 (4)
Forwards Plant 1995 SG Eddy Current Exam Summary Rept Re Number of Repairs Required Resulting from Insps Performed During 1995 Outage
ML17263B037
Person / Time
Site: Ginna 
Issue date: 04/24/1995
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
Download: ML17263B037 (2)