ML17263B037
| ML17263B037 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/24/1995 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17263B038 | List: |
| References | |
| NUDOCS 9505050108 | |
| Download: ML17263B037 (2) | |
Text
P RIORITY 1
ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9505050108 DOC.DATE: 95/04/24 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-1 (PD1-1)
(Post 941001)
SUBJECT:
Forwards plant 1995 SG eddy current exam summary rept re number of repairs required resulting from insps performed during 1995 outage.
DISTRIBUTION CODE:
A001D COPIES RECEIVED LTR ENCL SIZE TITLE: OR Submittal:
General Distribution DOCKET 05000244 P
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 R
RECIPIENT ID CODE/NAME PD1-1 LA JOHNSON,A INTE FILE CEN 1
N~
EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-1 PD NMSS/DWM/LLDP NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
0 1
1 D
u N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlii!INATE YOUR NAii!EFROil DISTRIBUTIONLISTS FOR DOC! 'MEN'I'S YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
AND
. ~
ROCHESTER GASANDEIECTRIC CORPORATION + 89 EASTAVENUE, ROCHESTER, N. Y ldbf9-mI AREA CODE7IS 546-2700 ROBERT C. MECREDY Vice President Nvcteor Operotions April 24, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-1 Washington, D.C.
20555
Subject:
Summary Examination Report for the 1995 Steam Generator Eddy Current Inspection (15 Day Summary Report)
R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
In accordance with Appendix B, Section 11, Paragraph 2.8.2 of the Ginna Station Quality Assurance
- Manual, we are submitting the 1995 Steam Generator Eddy Current Examination Summary Report for R.E.
Ginna Nuclear Power Plant.
This report summarizes the number of repairs required resulting from inspections performed during the 1995 outage and identifies the location and extent of each repairable indication and the number of tubes which have been plugged or sleeved.
Very ruly yours, Attachment GAH5377 Robert C.
Mec edy xc:
Mr. Allen R. Johnson (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 US NRC Ginna Senior Resident Inspector 6"6646 q605050108 9~500024R.
PDP
+DOCK pgp
.9