ML17317A657: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 6: | Line 6: | ||
| number = ML17317A659 | | number = ML17317A659 | ||
| issue date = 10/11/1978 | | issue date = 10/11/1978 | ||
| title = | | title = LER 78-070/03L-0:on 780911,air Start Line on Diesel 2AB Found to Be Hot During Load Test.Caused by Loose Piston Bolt Letting Combustion Vapors in Air Starting Line.Check Valve Replaced & Engine Retested Satisfactorily | ||
| author name = Brown M | | author name = Brown M | ||
| author affiliation = INDIANA MICHIGAN POWER CO. | | author affiliation = INDIANA MICHIGAN POWER CO. | ||
Line 21: | Line 21: | ||
| number = ML17317A658 | | number = ML17317A658 | ||
| issue date = 10/11/1978 | | issue date = 10/11/1978 | ||
| title = | | title = LER 78-069/03L-0:on 780913,while Performing Surveillance on Pressurizer Protection Sys,Reactor Trip Bistable Failed to Trip on Simulated High Pressure Signal.Bistable Replaced | ||
| author name = Rischling J | | author name = Rischling J | ||
| author affiliation = INDIANA MICHIGAN POWER CO. | | author affiliation = INDIANA MICHIGAN POWER CO. |
Latest revision as of 10:26, 7 March 2020
Date released: 05/31/2018 | Download: ML17317A657 |
---|---|
ML17317A659 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/11/1978 |
From: | Michael Brown INDIANA MICHIGAN POWER CO. |
To: | |
References | |
Download: ML17317A659 (7) | |
ML17317A658 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/11/1978 |
From: | Rischling J INDIANA MICHIGAN POWER CO. |
To: | |
References | |
Download: ML17317A658 (1) | |
ML17317A656 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/11/1978 |
From: | Shaller D INDIANA MICHIGAN POWER CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML17317A656 (5) | |