ML17317A657

From kanterella
Jump to navigation Jump to search
Forwards LER 78-069/03L-0 & LER 78-070/03L-0
Date released: 05/31/2018 Download: ML17317A657


LER 78-070/03L-0:on 780911,air Start Line on Diesel 2AB Found to Be Hot During Load Test.Caused by Loose Piston Bolt Letting Combustion Vapors in Air Starting Line.Check Valve Replaced & Engine Retested Satisfactorily
ML17317A659
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/11/1978
From: Michael Brown
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17317A659 (7)
LER 78-069/03L-0:on 780913,while Performing Surveillance on Pressurizer Protection Sys,Reactor Trip Bistable Failed to Trip on Simulated High Pressure Signal.Bistable Replaced
ML17317A658
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/11/1978
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17317A658 (1)
Forwards LER 78-069/03L-0 & LER 78-070/03L-0
ML17317A656
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/11/1978
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317A656 (5)