ML17340A156: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 6: | Line 6: | ||
| number = ML17340A157 | | number = ML17340A157 | ||
| issue date = 09/02/1980 | | issue date = 09/02/1980 | ||
| title = | | title = LER 80-015/03L-0:on 800802,during Power Operation & in Preparation to Increase Vol in Accumulators,Safety Injection Pump 3A Failed to Start Following Manual Initiation.Caused by Broken Support for Driving Pawl | ||
| author name = Pace P | | author name = Pace P | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
Latest revision as of 23:09, 6 March 2020
| Date released: 07/31/2018 | Download: ML17340A156 |
|---|---|
| ML17340A157 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/02/1980 |
| From: | Pace P FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML17340A157 (4) | |
| ML17340A155 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/02/1980 |
| From: | Schmidt A FLORIDA POWER & LIGHT CO. |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML17340A155 (2) | |