ML19309G777: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 36: Line 36:
lll
lll


                                                                                                              ;
80ESG-3900                                                                              '
80ESG-3900                                                                              '
April 30, 1980 i                    Page 2 i
April 30, 1980 i                    Page 2 i
Line 49: Line 48:
Radiation Survey Report of FCEL Facility
Radiation Survey Report of FCEL Facility
{                    cc w/ enclosure:
{                    cc w/ enclosure:
R. H. Engelken, Director, Region V Office, NRC
R. H. Engelken, Director, Region V Office, NRC t
;
r 1
t r
1
                                                                                                         .}}
                                                                                                         .}}

Latest revision as of 21:06, 21 February 2020

Forwards Rept of Radiation Survey in Support of Request to Terminate License CX-17 & to Release Facility for Unrestricted Use.
ML19309G777
Person / Time
Site: 05000147
Issue date: 04/30/1980
From: Remley M
ROCKWELL INTERNATIONAL CORP.
To: Gammill W
Office of Nuclear Reactor Regulation
Shared Package
ML19309G778 List:
References
80ESG-3900, NUDOCS 8005070554
Download: ML19309G777 (2)


Text

  • 5

- 800^070 BM Ensegy Systems Group 8900 De Soto Awue Canoga Park, CA 91304 Telephone: (213) 341.'

TWX: 910-494-1237 Rockwell Telex:1aio17 International April 30,1980 In reply refer to 80ESG-3900 Mr. William Gammil1 Acting Assistant Director for Operating Reactor Projects Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555

References:

(1) Rockwell International Letter 74AT-4512 dated July 16,1974, L. W. Wheeler to Dcr.ald J. Ncholt,

" Application for Amendment of Facility License CX-17 to Authorize the Dismantling of -he Facility ,

Disposal of its Compontot Parts, and '!aluntary Surrender of the Facility License, Cocker. 3G-147" (2) U.S. AEC letter, George Lear to L. 4. Wheeler, November 1,1974, transmitting the order authorizing the dismantlement of the Fast Critical Experimental Laboratory reactor

Dear Mr. Gammill:

Subject:

Radiation Survey Report of the FCEL Reactor Facility Following Dismantlement and Decontamination of the Facility The Fast Critical Experimental Laboratory (FCEL) reactor covered by Facility License CX-17 has been dismantled in accordance with the dismantling plan submitted with the application transmitted with our letter of July 16,1974 (Reference 1 above) and the dismantling order transmitted with your letter of November 1,1974 (Reference 2 above).

The facility has also been decontaminated as described in the disman-tling plan transmitted with the July 16, 1974 letter. Enclosed with this letter is a report on the radiation survey of the facility showing that the radiation levels in the facility area do indeed meet the require-ments described in the Jismantling plan. Je are now requesting that the facility be inspected by representatives of the Commission, termination of License CX-17 be authorized, and the facility be released for unre-stricted use.

Cio s

/

lll

80ESG-3900 '

April 30, 1980 i Page 2 i

l We would appreciate your early attention to inspection of the facility and its release for unres;ricted use, as we have an urgent requirement

, for use of the facility for other activities. If you have questions or desire further information, please call me at (213) 341-1000, Extension 2238.

" ?'(

Q. k Lc-9. ' '

M. E. Remley, Direct $r Health, Safety, & Radiation Services Energy Systems Group sjs:4/1-2 i

l

Enclosure:

Radiation Survey Report of FCEL Facility

{ cc w/ enclosure:

R. H. Engelken, Director, Region V Office, NRC t

r 1

.