ML20004C084: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:r C - 2.*              Toteno b EDISON May 20, 1981
                                                      -  N                                                    -
                                                                                                                ,    AcHano P. CnouSE
                                                                          .                                          Vd 7 g,,,,33 3,,,
Serial No. 1-205 Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III                                                                                                    ,
Offite of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Gian Ellyn, Illinois 60137
 
==Dear Mr. Keppler:==
 
Enclosed are two copies of the supplement to the March 5, 1981 Startup Report for Davis-Besse Unit 1, Cycle 2, documenting 100% full power physics testing results.
This report, which covers the period from February 12-19, 1981, is being sub-mitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Section C.1.a.
Very truly yours, l
RPC/CLB/ljk Enclosures cc:  Mr. Victor Stello, Jr. , Director Office of Inspection and Enforcement Enc 1: 25 copies I              Mr. Norman Haller, Director Office of Management Program Analysis Enc 1:                    2 copies Mr. Luis Reyes NRC Resident Inspector Encl: 1 copy 8106010 Y95                                          f 300 MAO! SON / VENUE                  TOLEDO, OHIO 43552 THE TOLEOO EDISON COM,PANY                  EOISON PLAZA
                - -- - . ~ , , , . - . ,        ,,                - - .    , , - - _ . . _ ,
                                                                                                                                , _ , .  . - - . , ,}}

Revision as of 19:31, 17 February 2020

Forwards Suppl to 810305 Startup Test Rept,Documenting 100% Full Power Physics Testing Results for 810212-19
ML20004C084
Person / Time
Site: Davis Besse 
Issue date: 05/20/1981
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20004C085 List:
References
1-205, NUDOCS 8106010495
Download: ML20004C084 (1)


Text

r C - 2.* Toteno b EDISON May 20, 1981

- N -

, AcHano P. CnouSE

. Vd 7 g,,,,33 3,,,

Serial No. 1-205 Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III ,

Offite of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Gian Ellyn, Illinois 60137

Dear Mr. Keppler:

Enclosed are two copies of the supplement to the March 5, 1981 Startup Report for Davis-Besse Unit 1, Cycle 2, documenting 100% full power physics testing results.

This report, which covers the period from February 12-19, 1981, is being sub-mitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Section C.1.a.

Very truly yours, l

RPC/CLB/ljk Enclosures cc: Mr. Victor Stello, Jr. , Director Office of Inspection and Enforcement Enc 1: 25 copies I Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 2 copies Mr. Luis Reyes NRC Resident Inspector Encl: 1 copy 8106010 Y95 f 300 MAO! SON / VENUE TOLEDO, OHIO 43552 THE TOLEOO EDISON COM,PANY EOISON PLAZA

- -- - . ~ , , , . - . , ,, - - . , , - - _ . . _ ,

, _ , . . - - . , ,