ML20004C085

From kanterella
Jump to navigation Jump to search
Forwards Suppl to 810305 Startup Test Rept,Documenting 100% Full Power Physics Testing Results for 810212-19
Date released: 01/18/2020 Download: ML20004C085


Suppl to Post-Refueling Physics Testing,Davis-Besse Unit 1, Cycle 2 Power Escalation Testing.
ML20004C087
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/20/1981
From:
TOLEDO EDISON CO.
To:
References
Download: ML20004C087 (4)
Forwards Suppl to 810305 Startup Test Rept,Documenting 100% Full Power Physics Testing Results for 810212-19
ML20004C084
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/20/1981
From: Crouse R
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20004C084 (1)