ML16134A263: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:


==SUMMARY==
==SUMMARY==
,
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F


Line 43: Line 42:


==SUMMARY==
==SUMMARY==
,
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F



Revision as of 02:27, 5 February 2020

OI Synopsis Release
ML16134A263
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/13/2016
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Glover R
Duke Energy Corp
References
Download: ML16134A263 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - INVESTIGATIVE

SUMMARY

OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F

Dear Mr. Glover:

The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.

Robinson Steam Electric Plant.

The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED

ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - INVESTIGATIVE

SUMMARY

OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F

Dear Mr. Glover:

The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.

Robinson Steam Electric Plant.

The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED

ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO