OUES.7!01;.13.9(a)                          (lr..it'ic;J Testinc).
OUES.7!01;.13.9(a)                          (lr..it'ic;J Testinc).
Line 41: Line 39:
           *the test. methods d_esc::ribed in Re.gulato.ry Gui'oe L~l wi.ll*be reguirea_ by_ the staff.
           *the test. methods d_esc::ribed in Re.gulato.ry Gui'oe L~l wi.ll*be reguirea_ by_ the staff.
* ANSWER.* . . *.
* ANSWER.* . . *.
                                                                        .              .  .            . .
The    No.
The    No.
* 2
* 2
* Uni.t
* Uni.t
* ini tia.1                  .preoperationa_l ._test .progr~* is in full.**
* ini tia.1                  .preoperationa_l ._test .progr~* is in full.**
                .      .            .    - .*'
                   ~onforrnance with the* Reg~latory *guide wh1ch: f1inctionally.
                   ~onforrnance with the* Reg~latory *guide wh1ch: f1inctionally.
                                      ..            . .
dernons.trates <the .independence among redundant onsite. power.
dernons.trates <the .independence among redundant onsite. power.
s6u;r-ces***and their' load groups.                            This. is .accomplished b~* the.
s6u;r-ces***and their' load groups.                            This. is .accomplished b~* the.
Line 56: Line 51:
                 . .unde:rv~l tage relay knife. swit'ches*) ... All loads off the No. 2 Unit group buses not required tb*mairita.i.n necessary . and*
                 . .unde:rv~l tage relay knife. swit'ches*) ... All loads off the No. 2 Unit group buses not required tb*mairita.i.n necessary . and*
                 .*independent construction. and testing activities, as well. as badkup power t~ ~o. 1 Unit,~ill b~ de-energized to the maximtirr. extent practical ..
                 .*independent construction. and testing activities, as well. as badkup power t~ ~o. 1 Unit,~ill b~ de-energized to the maximtirr. extent practical ..
                              .                .
                                . " .    .        .,    . . .  .  .
The* functional. testin~ requirerrierits covered . under c. 2. and c.3 of this                    guid~ate            ~erformed  as part of the Integrated Safe~&#xb5;ards                Test.
The* functional. testin~ requirerrierits covered . under c. 2. and c.3 of this                    guid~ate            ~erformed  as part of the Integrated Safe~&#xb5;ards                Test.
P78 l 70 49                                                        013.,(*)
P78 l 70 49                                                        013.,(*)


                    *, .
...        ..
                  .
                     'QUES~I6~.13;~1b).
                     'QUES~I6~.13;~1b).
Ou r .po s i ti on re la ti ~ e to yo i..l r pr c p Os a l . to
Ou r .po s i ti on re la ti ~ e to yo i..l r pr c p Os a l . to
Line 74: Line 64:
in*      a turbi.ne trip event via sensed T-G overspee'd co:ndi tions.
in*      a turbi.ne trip event via sensed T-G overspee'd co:ndi tions.
                         ~-* 't>escribe. the automat*ic transfer functions- .for. the.plants.**
                         ~-* 't>escribe. the automat*ic transfer functions- .for. the.plants.**
                               .electrical dist("ibution system along* with asso~iat.ed *time del~y~~fbr each iriitiatihg *event or .conditi~riJ                                 *
                               .electrical dist("ibution system along* with asso~iat.ed *time del~y~~fbr each iriitiatihg *event or .conditi~riJ
                                              ,,_..    *_,,.
* 4~ .. Desc.rib~* the means by which yo.u plan to initiate t.he genera~or*load rejection test from 10.0.percent power.*
4~ .. Desc.rib~* the means by which yo.u plan to initiate t.he genera~or*load rejection test from 10.0.percent power.*
ANSWER*.***
ANSWER*.***
                     .1.        Table Ql3. 9-1 1nai'i;=ates *the initia_ting ~vents. which cause
                     .1.        Table Ql3. 9-1 1nai'i;=ates *the initia_ting ~vents. which cause
                '    .        *. *.. *  .          . .              - .  -      '    .            .
                     . opening of *the rr,*ain.*genera-tor*. ou~put ~break~ts :a~d thos~ wr.i ch
                     . opening of *the rr,*ain.*genera-tor*. ou~put ~break~ts :a~d thos~ wr.i ch
                       .result .. ir:i*a. turbirie;trip.*                  ;he initiating . events .are gro.Lrped_t.o*
                       .result .. ir:i*a. turbirie;trip.*                  ;he initiating . events .are gro.Lrped_t.o*
                            '.              '
ind i cite. whether th'ey Cl ct to. *cause . ~ di~ ec t' 't u"r bi'he tr f p.                    0 r- a turbine.trip;via_                        a.~om~?.n.tripping.device.**              Refer .to  :Fig~re.
ind i cite. whether th'ey Cl ct to. *cause . ~ di~ ec t' 't u"r bi'he tr f p.                    0 r- a turbine.trip;via_                        a.~om~?.n.tripping.device.**              Refer .to  :Fig~re.
Ql3~*9-l          for information .regarding the *breaker.setup.
Ql3~*9-l          for information .regarding the *breaker.setup.
: 2.    ~s indicated. in T~bl~ Ql3.9-l, all automati~ generator
: 2.    ~s indicated. in T~bl~ Ql3.9-l, all automati~ generator breaker*tri~s                (bdth breakers) wil1            ca~se      a di.rect    turbin~
                                                                                                          -_    ...
breaker*tri~s                (bdth breakers) wil1            ca~se      a di.rect    turbin~
trip.            Only a manual trip of both breakers will not cause a
trip.            Only a manual trip of both breakers will not cause a
                                                                  .          '      .            .
               .
               .
* dire c .t
* dire c .t
Line 96: Line 80:
* 9 ( b )* -1
* 9 ( b )* -1


..
E:r:c:e  th'e  .g_er:e~e.to~ st:.lJ. he..-~    o~-:.;:::    tc -:~.e el~c:.r:.cc..2. C""".*':" .... ~-
E:r:c:e  th'e  .g_er:e~e.to~ st:.lJ. he..-~    o~-:.;:::    tc -:~.e el~c:.r:.cc..2. C""".*':" .... ~-
                                                                                           ~  .J ....  - - -
                                                                                           ~  .J ....  - - -
Line 125: Line 108:
r7G 170 52                                                          Ql3.9(b)-~
r7G 170 52                                                          Ql3.9(b)-~


                  . '  - .' .
         .TABLE Ql3. 9.-.l
         .TABLE Ql3. 9.-.l
                                ..
                                    ...          -
                                                                                                      .      .
.,.*      !~!TI~TiNb              EVENT                                                    GEN. .c?.EAKE?. *... *. 'GEN *. BREJ..KEr. *. .* T.u":rtE*!NE *.. *
.,.*      !~!TI~TiNb              EVENT                                                    GEN. .c?.EAKE?. *... *. 'GEN *. BREJ..KEr. *. .* T.u":rtE*!NE *.. *
                                                                                             . t 1 ~9 . TR IP          t 9-10 TP.! P          .* TR:P:
                                                                                             . t 1 ~9 . TR IP          t 9-10 TP.! P          .* TR:P:
Line 138: Line 117:
Negative Phas~*~equence Turbin~ Trip*                        .              . .
Negative Phas~*~equence Turbin~ Trip*                        .              . .
Generator .. Differential-.
Generator .. Differential-.
Gene~aior N~utr~l Gro~nd- (Regular)                                                      Yes                    Yes                    Yes
Gene~aior N~utr~l Gro~nd- (Regular)                                                      Yes                    Yes                    Yes Overall Di ffer.entia.i. (Redular). .
      '
Overall Di ffer.entia.i. (Redular). .
                 <    *                .*  *              *  *  *  ..,,    T  ;
                 <    *                .*  *              *  *  *  ..,,    T  ;
                                                                                      *
                                                                                                          ..
Generator Neu.tr-al* Gr6unc (Ba*c::kup*l                                                  Yes ..                  Yes                  Yes.
Generator Neu.tr-al* Gr6unc (Ba*c::kup*l                                                  Yes ..                  Yes                  Yes.
Overa'll Differential (Backup~ .*
Overa'll Differential (Backup~ .*
Line 155: Line 130:
     .. Group      Bus~            Breaker 2EFGD                                                  Yes                    Yes                    Yes Group Bus. Breaker. 2AEGD                                                                Yes.                    Yes*.*.                Yes*
     .. Group      Bus~            Breaker 2EFGD                                                  Yes                    Yes                    Yes Group Bus. Breaker. 2AEGD                                                                Yes.                    Yes*.*.                Yes*
Group Bus. Breaker 2AHGD                                                                *Yes
Group Bus. Breaker 2AHGD                                                                *Yes
* Yes                    Yes t2 Station Power Transf6rmer Dffferential .** Yes                                                                No                    No
* Yes                    Yes t2 Station Power Transf6rmer Dffferential .** Yes                                                                No                    No 13 kV    B~s~            Section                Breaker*Fail~re                          Yes                    No                    No Table Ql3.9(b)-l
                                '      .  .      '                      : .  .
13 kV    B~s~            Section                Breaker*Fail~re                          Yes                    No                    No Table Ql3.9(b)-l


  *,.* .*
              *.,- .-
                                                        *  .
                                                              ..
                                                              ..___
                                                                  - ..
T 1.. :  :.:r Q l j . 9 -:-1 .
T 1.. :  :.:r Q l j . 9 -:-1 .
                                          .....
           . lN!TIATING .EVEN':'                                                      GEN. BR&#xa3;J..!:&#xa3;R*  GEN. BREAKE::.:  . T:.JR.E !NE
           . lN!TIATING .EVEN':'                                                      GEN. BR&#xa3;J..!:&#xa3;R*  GEN. BREAKE::.:  . T:.JR.E !NE
                                                                                       ~l-9 TF\IP.        J9-10 T~Z:?        T::.: F so*o      kV  *Bus**. B.rea*ke r f 1-5 Failure .                              Yes                No              No
                                                                                       ~l-9 TF\IP.        J9-10 T~Z:?        T::.: F so*o      kV  *Bus**. B.rea*ke r f 1-5 Failure .                              Yes                No              No
Line 172: Line 138:
SOO"kV Bus. Breaker t 9-10 Failure*                                          *Yes                  No              Yes
SOO"kV Bus. Breaker t 9-10 Failure*                                          *Yes                  No              Yes
           '500 kV Bus. Breaker. 11.;.5 CT Modu.f.e Ground
           '500 kV Bus. Breaker. 11.;.5 CT Modu.f.e Ground
                                                                                         ..                      No Yes                                  No
                                                                                         ..                      No Yes                                  No 5'00 kV.          B.us_~    Breaker            11~8    CT. Mo du.le. Grounc      Yes.                No              No*
                                                                                                              '
5'00 kV.          B.us_~    Breaker            11~8    CT. Mo du.le. Grounc      Yes.                No              No*
5 00      kV* Bus. Breaker . t 1-9 CT Module Ground                          Yes                No              No..
5 00      kV* Bus. Breaker . t 1-9 CT Module Ground                          Yes                No              No..
                                                                                                                              '*'
                                                ..
f 3      T~. Breaker Failure*                                                Yes                No              No Soo*kv. K*eeney Line Re.lay (Reaula                        ~  .
f 3      T~. Breaker Failure*                                                Yes                No              No Soo*kv. K*eeney Line Re.lay (Reaula                        ~  .
r .J          No*                Ye.s            No
r .J          No*                Ye.s            No 5 0.0 *kV *Keeney Line Relay (Ba ck up)                                      .No                  Yes              No 5 00 kV        Bu.s .* Br.eake r J 1-9 Failure ..                            No                  Yes              Yes-*
                                                  .. .  .              ' .
5 0.0 *kV *Keeney Line Relay (Ba ck up)                                      .No                  Yes              No 5 00 kV        Bu.s .* Br.eake r J 1-9 Failure ..                            No                  Yes              Yes-*
           .500 kV Bus.;. *Breaker 12"".'10 Failure,                                        No:                Yes.              No    !
           .500 kV Bus.;. *Breaker 12"".'10 Failure,                                        No:                Yes.              No    !
500 kV'Bus. Breaker*t9~10 CT~Mo~Ol~ Graurid. N6                                                    Ye*s              No.
500 kV'Bus. Breaker*t9~10 CT~Mo~Ol~ Graurid. N6                                                    Ye*s              No.
Line 193: Line 153:
1- :.**.:
1- :.**.:
I  .*
I  .*
                           ..t'
                           ..t' I    ..
                -. *. .....:-_  __ --
                                  *.
                                                      -    *.  - ...    *' - -
I    ..
            ..
                                                                                     '  . ~*. ~
                                                                                     '  . ~*. ~
                                                                                                *.:. ,,*
                                                                                                          *.**.  *. ,_ ..
         "*."c*** ,**: . . .
         "*."c*** ,**: . . .
        .*  '*.      *__      __  ,* -
   . :*(
   . :*(
N02-GE~0
N02-GE~0
Line 220: Line 172:
                                                                                                                                     . 25 KV. l&:lO. MVA 0.9 .~t
                                                                                                                                     . 25 KV. l&:lO. MVA 0.9 .~t
                                           -Note:
                                           -Note:
{*). The.Keeney
{*). The.Keeney Lin~'
                                                        .
Lin~'
will be
will be
                                                                                                  .    -
:av~ilabie when Unit _.2 is in operati~n ..
:av~ilabie
                                                                                                                '
when Unit _.2 is in
                                                                                                                          .. .
operati~n ..
                                                                                                                                                      .


                                                          *
                       ~*
                       ~*
   . . . .;;
   . . . .;;
                                                          .*  .-**,
                                                                      .  .                                                          .  '
                                                                                            . ..                      : ..
: '"'
                                                                                                          .. ''
                   . The. st'a'f !            con_ci uded tJie ~eg*u'latory Gu1de l .108 I* *periodic .
                   . The. st'a'f !            con_ci uded tJie ~eg*u'latory Gu1de l .108 I* *periodic .
                       'resting of DicselG~nr:rator Uni.ts as;On~ite. Electric Power Sy.stems>*
                       'resting of DicselG~nr:rator Uni.ts as;On~ite. Electric Power Sy.stems>*
Line 248: Line 186:
* con!ora* with" this gu{de of how the;* *
* con!ora* with" this gu{de of how the;* *
                 *.will provide_ for eq&#xb5;iv.a.lent pr:e-6,Perational testing.
                 *.will provide_ for eq&#xb5;iv.a.lent pr:e-6,Perational testing.
                                                        .          .
The  -No.            2 Unit inl.tial pre-ope;-ational test pr~*9~am _is in con~
The  -No.            2 Unit inl.tial pre-ope;-ational test pr~*9~am _is in con~
fo~-ce with the ~gulat.ocy Guid'e *1*108 vith the following ex~
fo~-ce with the ~gulat.ocy Guid'e *1*108 vith the following ex~
                          ,. .      '
ceptions:.
ceptions:.
                        .      .*                                                                                **
* Paragraph c2 ~a ( 4) -~ We_ comply .with the s_ection by tripping the "iese1          .-output: bre_~k:er at* 21~0 J<W              c2()00 hour_ ratin 9 > veri!y_i~q that.the volta9e.reg-U1atiori.is*rn.aintairied                            . within    the acceptable l
* Paragraph c2 ~a ( 4) -~ We_ comply .with the s_ection by tripping the "iese1          .-output: bre_~k:er at* 21~0 J<W              c2()00 hour_ ratin 9 > veri!y_i~q that.the volta9e.reg-U1atiori.is*rn.aintairied                            . within    the acceptable l
                                                '*          ,.                .  '      .        - .
*.            . .-
*.            . .-
* 1intits. ~d- the              ailowabie-        bverspeed d~s. i:'o:t 'trip out the diesel.
* 1intits. ~d- the              ailowabie-        bverspeed d~s. i:'o:t 'trip out the diesel.
                                                                                        .          '  -  .
                                                                                                                                      *,
                                                                                                                                    - _*,
                 *.We f~e_l ~-h~s transient                          is more severe:        than the ioad *shedding
                 *.We f~e_l ~-h~s transient                          is more severe:        than the ioad *shedding
            .  *.            .    .    .  -
               - . requirements ident.!-fied in the regulatocy guide.
               - . requirements ident.!-fied in the regulatocy guide.
                                                                                                                          ..
Paragraph c. 2a (5) _* ..we will                        perfo~    the test described in this .
* Paragraph c. 2a (5) _* ..we will                        perfo~    the test described in this .
                 . section, but. due to the sequence cf testing $. t may not be innnedietel:r after >t.he test described .in C: *. 2. a (3).,                              . The generator sy_~tems            will, *however; be at full_ load tempeI:"ature$.
                                                                .    -          .  .                    '
                 . section, but. due to the sequence cf testing $. t may not be innnedietel:r after >t.he test described .in C: *. 2. a (3).,                              . The generator
                                              .  .        . .
sy_~tems            will, *however; be at full_ load tempeI:"ature$.
                     *Paragraph, c .. 2.a(6) - Our plant is net designed to perform the
                     *Paragraph, c .. 2.a(6) - Our plant is net designed to perform the
                     .test des"cribed in this* s'ection~-
                     .test des"cribed in this* s'ection~-
Line 275: Line 201:


Paraqraph c.2.a(9) - To accomplish this reliability demonstration, we -..,ill increase the frequency- of surveillance testing to acquire the 23 consecutive 6uccessfull valid st.arts per diesel prior to      . t proceeding beyond the Zero Power Physics '!'est Program.      -ro accomplish this,.wc intend to take credit for those diesel atarts accomplished to date or scheduled during Integrated Safe-guards Testing, as -long as the    die~els    are loaded to a minimum of approximately 25\ and the run durations- are approximately 30 minutes or more. All additional starts will comply with the regulatory guide criteria for valid tests.
Paraqraph c.2.a(9) - To accomplish this reliability demonstration, we -..,ill increase the frequency- of surveillance testing to acquire the 23 consecutive 6uccessfull valid st.arts per diesel prior to      . t proceeding beyond the Zero Power Physics '!'est Program.      -ro accomplish this,.wc intend to take credit for those diesel atarts accomplished to date or scheduled during Integrated Safe-guards Testing, as -long as the    die~els    are loaded to a minimum of approximately 25\ and the run durations- are approximately 30 minutes or more. All additional starts will comply with the regulatory guide criteria for valid tests.
                                                        *
t?/3. '1 {c/- z_
* t?/3. '1 {c/- z_
_


             ,i.;. ' - ~
             ,i.;. ' - ~
                             .* .  ';.
                             .* .  ';.
l.-. .
l.-. .
                                                '*,
The staff* has :con cl oded the. :Reg. Guide. 1. 6 B.'2 .~ Initial *start-
The staff* has :con cl oded the. :Reg. Guide. 1. 6 B.'2 .~ Initial *start-
             . up T.~s.t Pr:osrdr.i to Dcmon.?trate Rcr::ote *Shutdown Capability 'for * .
             . up T.~s.t Pr:osrdr.i to Dcmon.?trate Rcr::ote *Shutdown Capability 'for * .
Line 292: Line 215:
                   *rntent tO..coipl~* with our:-requireroent. :
                   *rntent tO..coipl~* with our:-requireroent. :
* ANSWER*..
* ANSWER*..
: The Salein plant. was. designed for remote hot shutdown. froo outside
: The Salein plant. was. designed for remote hot shutdown. froo outside the control.room.                              This.. was .. described in Section 7. 7 of the -FSAR,;;
                                                                                              '      -      '
the control.room.                              This.. was .. described in Section 7. 7 of the -FSAR,;;
                                .            '          .*  .
Our capability to 90 to a                                    cola    shutdown condition *through the use
Our capability to 90 to a                                    cola    shutdown condition *through the use
             - of'-'procedurcs'. and tenporacy modi'ticatioris was' descri'.bed ~n the
             - of'-'procedurcs'. and tenporacy modi'ticatioris was' descri'.bed ~n the Resporis~                  t6-Question*Q9.CS~.
                                                                    .      .
                                                                      .        ..
Resporis~                  t6-Question*Q9.CS~.
General Design* Criterion 19. -of lb CFR SO Appendix A requ;res a*
General Design* Criterion 19. -of lb CFR SO Appendix A requ;res a*
design ca pa bi li ty for' remqte he>~:-s,hutdo..;m with 0 potential: '
design ca pa bi li ty for' remqte he>~:-s,hutdo..;m with 0 potential: '
            .
_cap:ab{1:i ty.
            .
_cap:ab{1:i
                  .
                      *.-
                          -. .
                                      '
ty.
                                            . ..
                                                 *for.
                                                 *for.
:
                                                      .
                                                        .
                                                            '          . .    .
sub$~quent *cold shutdown
sub$~quent *cold shutdown
                                                                                      '    .
                                                                                                 . thro~gh
                                                                                                 . thro~gh
                                                                                                        . ..
                                                                                                                   ~ui table procedures
                                                                                                                   ~ui table procedures
                                                                                                                            - ..      .  ,.
_*A detail procedure wili i,e* vtitten .exp'iain.in9 the actions to be-taken              'to      brin'g the pl.ant. from a.* hot. &hut-down                      to  a  cold  shut-down C<"'"1dition from outside the control room.* This procedure Yill be completed b~; February 19, .1979 ~
                                                                                                                                            *.
_*A detail procedure wili i,e* vtitten .exp'iain.in9 the actions to be-taken              'to      brin'g the pl.ant. from a.* hot. &hut-down                      to  a  cold  shut-down
* C<"'"1dition from outside the control room.* This procedure Yill be
                      .                    -
completed b~; February 19, .1979 ~
* A t_rial-                    run, not an              actual* test ho"Wever, will be performed          ..
* A t_rial-                    run, not an              actual* test ho"Wever, will be performed          ..
* to
* to
* demOnst.rate -the comm*unication, *coordination .and capabilities of the proc:-cdure con di ti_ons.*:' This trial. run sha.11 be .performed prior to fuel *load.                      A fll1lctiof)al          outline      will be submitted to* the staff *
* demOnst.rate -the comm*unication, *coordination .and capabilities of the proc:-cdure con di ti_ons.*:' This trial. run sha.11 be .performed prior to fuel *load.                      A fll1lctiof)al          outline      will be submitted to* the staff *
                                                                                                    '                .            '
             . which_ will pres~nt t.h'e highlights- of the. detail procedure. ind.icatin9 how cold. shutdown wi'il. achieved* : 'l'his will be transmitted for thc'staffsrcview                              by    Fcbi;-uary 5, 1979.
             . which_ will pres~nt t.h'e highlights- of the. detail procedure. ind.icatin9 how cold. shutdown wi'il. achieved* : 'l'his will be transmitted for thc'staffsrcview                              by    Fcbi;-uary 5, 1979.
                                                                                   -**  Al..2\
                                                                                   -**  Al..2\
                                                                                                                             ..}}
                                                                                                                             ..}}

Revision as of 09:32, 3 February 2020

Forwards Responses to Request for Addl Info Re NRC Question 13.9 (Preoperation Testing) Parts a Thru D.Encl Info Will Be Incorporated in FSAR as Amend
ML18078A826
Person / Time
Site: Salem 
Issue date: 02/05/1979
From: Mittl R
Public Service Enterprise Group
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7902080164
Download: ML18078A826 (11)


Text

e PS~G Public Service Electric and Gas Company 80 Park Place Newark. f\l.J. 07101 Phone 201 430-7000 February 5, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washin~ton, D*. C. 20555 Attention: Mr. Olan D. Parr, Chief Light Water Reactors Branch 3 Di~ision qf Project Management Gentlemen:

RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION NO. 2 UNIT SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-311 Public Service Electric and Gas Company hereby transmits 60 copies of. its responses to certain of your requests for additional information to NRC Question 13.9 (Preoperation Testing) parts a thru d. The information contained herein will be incorporated into the Salem FSAR in ari amendment to our application.

Should you have any questions, please do not hesitate to contact us.

R. L. Mittl General Manager -

Licensing and Environment Engineering and Construction Enclosure 79020801Co~

The Energy People

  • e

. ~* -

OUES.7!01;.13.9(a) (lr..it'ic;J Testinc).

  • .The test*rr.etbods and plant.'s electrical syst.err.*s status.nee::'to be defined fer **test~ that will be c::o0c-.:ctec to. satisfy
  • reg~1~tory pcsitions~in R~culatorv;GGi~e 1.,li -~Pr~6per~ticn~l
  • . * *
  • T*esting of Redundant- bnsit; Elect~i'cai Power Syster.-:s. to * .* * * .
  • Verify Proper .Loa:* Group. J..ssignmel"Jts.** if e.xceptions t.o this*

9u.ide ere .. faken*, they should. be *explaine~ in _sufficient det'ail

~6 sho~ that. th~ plant*s~jtu~ an~ te~t m~tho6s-will provjd~

.. equival'er.t. assurance of proper load _c;tcui:. assigrir.1ents and

  • i n de:=-: n den ce bet we.er. t e d u n cfa ri t AC and DC sou t c es of on s i t e

.po\.ier and independence' fr-orr. ofrsite *power *sources.

  • Other"Wise,
  • the test. methods d_esc::ribed in Re.gulato.ry Gui'oe L~l wi.ll*be reguirea_ by_ the staff.
  • ANSWER.* . . *.

The No.

  • 2
  • Uni.t
  • ini tia.1 .preoperationa_l ._test .progr~* is in full.**

~onforrnance with the* Reg~latory *guide wh1ch: f1inctionally.

dernons.trates <the .independence among redundant onsite. power.

s6u;r-ces***and their' load groups. This. is .accomplished b~* the.

  • . performance 'of* the In.tegra tee Safeguards Test. **.As stipulated in part, c~ 1 ".of. the guide, isolation from the off site trans-.

mission netwo~k ~ill.be accompl,ish:ed,;by'.the.direct actuatiC:in'

. .unde:rv~l tage relay knife. swit'ches*) ... All loads off the No. 2 Unit group buses not required tb*mairita.i.n necessary . and*

.*independent construction. and testing activities, as well. as badkup power t~ ~o. 1 Unit,~ill b~ de-energized to the maximtirr. extent practical ..

The* functional. testin~ requirerrierits covered . under c. 2. and c.3 of this guid~ate ~erformed as part of the Integrated Safe~µards Test.

P78 l 70 49 013.,(*)

'QUES~I6~.13;~1b).

Ou r .po s i ti on re la ti ~ e to yo i..l r pr c p Os a l . to

  • e n rd na t. e . the < ** .

turb'ine tiip test frorr, )00 percer.t power is that it is .n.ot ac-ceptable.~ . PSE&G* shoulcf b~ modified 'to* include. tr.is test or

- ~ ...

      • .tti:e**follo .... ing _a'C(:iti:6nal inf~rir.ation *sr;ouid be provided:
1. -'Provide* a-~list1ng *of* all in:itiating event:s or con_ditioris' that*- r*esult. in opening o.f. main generat,or output breaker.
2. Describe w!:dth trips*lis.ted. in . iteml will result in a direct turbi'ne trip -event and which trips .~iii result.. . .

in* a turbi.ne trip event via sensed T-G overspee'd co:ndi tions.

~-* 't>escribe. the automat*ic transfer functions- .for. the.plants.**

.electrical dist("ibution system along* with asso~iat.ed *time del~y~~fbr each iriitiatihg *event or .conditi~riJ

  • 4~ .. Desc.rib~* the means by which yo.u plan to initiate t.he genera~or*load rejection test from 10.0.percent power.*

ANSWER*.***

.1. Table Ql3. 9-1 1nai'i;=ates *the initia_ting ~vents. which cause

. opening of *the rr,*ain.*genera-tor*. ou~put ~break~ts :a~d thos~ wr.i ch

.result .. ir:i*a. turbirie;trip.* ;he initiating . events .are gro.Lrped_t.o*

ind i cite. whether th'ey Cl ct to. *cause . ~ di~ ec t' 't u"r bi'he tr f p. 0 r- a turbine.trip;via_ a.~om~?.n.tripping.device.** Refer .to :Fig~re.

Ql3~*9-l for information .regarding the *breaker.setup.

2. ~s indicated. in T~bl~ Ql3.9-l, all automati~ generator breaker*tri~s (bdth breakers) wil1 ca~se a di.rect turbin~

trip. Only a manual trip of both breakers will not cause a

.

  • dire c .t
  • turbine - tr i ~;. This wil.1 not cause. a turbine overspee::

trip but r.esult in. a. reac-tor tr:ip through primary system pa~amete~s ~n~ a*sLlbs~quent* tuibine trip~ An individual output-breaker trip wili. not.tause a t~rbine tri~~r overspeed P78 110 50 Q1 3

  • 9 ( b )* -1

E:r:c:e th'e .g_er:e~e.to~ st:.lJ. he..-~ o~-:.;::: tc -:~.e el~c:.r:.cc..2. C""".*':" .... ~-

~ .J .... - - -

via the re=ai~inf o~t~~~ treaker.

Cperatior. of the ucit ~itt cnly one genera~or breaker i~ service operatin£ coLditioc used durinf peri6ds of mainte~a~ce ~tict re~uire the condition. ~ny trip signal which nor~ally opens tot~ generator breaker~ and causes a direct turbine trip is unaffected ty having one treaker open prior to the trip signal. The trip signals listed in Tatle Q 13.9(t) wtich nor=ally open only one generator breaker and do not produce a direct. turbine t~ip would perfor= in the same reanner if a generator breaker were o~en prior to th~ trip signal.

In this case, the unit would respond as if a manual trip of both generator breakers had occurred .

the transfer of ...".. *re L v*. \T e:-,..c.,.,..,

.- '-' .!:-' tusses fro:::. tre a*..:.xiliar::

transf~r is acco:::.plished i~ less* than one second.

wben all of :~e follo~ing con~itions exist:

a. 3cth 500 k~ genera~or breakers are open.

D. Fcten~ial exists on the Station Fower Transformer.

c. None of the pro:e~tive trips have occ~rred (i.e., b~s differential, bus overload, and failure of a~xiliary power transformer side infeei breaker).
4. The Generator Trip Test will be performed at lC'.:'~ cf ra"':ed ther:::al po,,..er. It is expected that a reactor trip and a tur~ine trip, as well as a~y t~rbine overspeed, ~ill be noted an~

recorded. The tes~ is performed by manually op~ning both ou"':p~~

breakers.

P78 170 51 Ql3.9(b)-2

\ * ;. r ,.. _ ~ ':..: -._: r_

.; i 11 a l '* .* 2 y
: c all :=. e: a t *.; r ; ::.. TJ <:: t r i p *

+ -.,. . r

~dditional turbine trip would be in:icnifican~ly differe~t r

L.. ..... ..:.--

that [Ener~ted d~rin~ a reactor tri? a~d th~t tbe generato~ tri~

as described abcYe.is the more severe transie~t, the co::t[

associated with a turtine trip tect ~o not ~ppear tb justify the benefits to he deriYed fro:: the te[t.

t~rtine triF) test vill te perfcr=ed.

r7G 170 52 Ql3.9(b)-~

.TABLE Ql3. 9.-.l

.,.*  !~!TI~TiNb EVENT GEN. .c?.EAKE?. *... *. 'GEN *. BREJ..KEr. *. .* T.u":rtE*!NE *.. *

. t 1 ~9 . TR IP t 9-10 TP.! P .* TR:P:

Generator.. Over load.* . *.Yes Yes -Yes Gerierator Out of .st~~

  • Turbine Trip*
  • Lo s s o f . Fi e l d . (BC! ck up ) .* *

. *Loss of Field . (Regula.r) *. Yes. Yes. Yes Field For.c::ing * * * .

Negative Phas~*~equence Turbin~ Trip* . . .

Generator .. Differential-.

Gene~aior N~utr~l Gro~nd- (Regular) Yes Yes Yes Overall Di ffer.entia.i. (Redular). .

< * .* * * * * ..,, T  ;

Generator Neu.tr-al* Gr6unc (Ba*c::kup*l Yes .. Yes Yes.

Overa'll Differential (Backup~ .*

Auxiliary Power -Tr.ansformer Differential. Yes Ye.s Ye.s (Regular) * . * * * *. * * * *.* * * * * **

Aux *. Power. Tr ar.sfo rm.er. Gr.6und* (*Regula.r).

'~: ..

Aux. Power. Tr ansiotme r Over load (Ba tkup )_ Yes - Yes Yes.

. *Aux *. Powe-r . 'rr:*an~ ~ o ~*~.e .t*:: G.r..o* . Urid . (.Ba_~*~"up*)_ . .

Group* Bus *. Break~r. 2BGGD Yes ...

  • Yes Yes

.. Group Bus~ Breaker 2EFGD Yes Yes Yes Group Bus. Breaker. 2AEGD Yes. Yes*.*. Yes*

Group Bus. Breaker 2AHGD *Yes

  • Yes Yes t2 Station Power Transf6rmer Dffferential .** Yes No No 13 kV B~s~ Section Breaker*Fail~re Yes No No Table Ql3.9(b)-l

T 1.. :  :.:r Q l j . 9 -:-1 .

. lN!TIATING .EVEN':' GEN. BR£J..!:£R* GEN. BREAKE::.: . T:.JR.E !NE

~l-9 TF\IP. J9-10 T~Z:? T::.: F so*o kV *Bus**. B.rea*ke r f 1-5 Failure . Yes No No

.- 500 kV B.us ~ *Breaker *11..;.a .Fa i1 ur;-e Yes **No No .

SOO"kV Bus. Breaker t 9-10 Failure* *Yes No Yes

'500 kV Bus. Breaker. 11.;.5 CT Modu.f.e Ground

.. No Yes No 5'00 kV. B.us_~ Breaker 11~8 CT. Mo du.le. Grounc Yes. No No*

5 00 kV* Bus. Breaker . t 1-9 CT Module Ground Yes No No..

f 3 T~. Breaker Failure* Yes No No Soo*kv. K*eeney Line Re.lay (Reaula ~ .

r .J No* Ye.s No 5 0.0 *kV *Keeney Line Relay (Ba ck up) .No Yes No 5 00 kV Bu.s .* Br.eake r J 1-9 Failure .. No Yes Yes-*

.500 kV Bus.;. *Breaker 12"".'10 Failure, No: Yes. No  !

500 kV'Bus. Breaker*t9~10 CT~Mo~Ol~ Graurid. N6 Ye*s No.

. .Manual Trip *Yes No No

.M an ~a 1 T.r i p No. Yes No.

  • Turbine trip acts.to trip g~h*rator outp~t breakers thiough a .30 se=on~ time de.lay.:
RWS
gs P78 170 SS/56.

Table Ql3.9(b)-2

I , .

1- :.**.:

I .*

..t' I ..

' . ~*. ~

"*."c*** ,**: . . .

. :*(

N02-GE~0

  • tl\*~1N .. . .\ .*.

--A~ ,c..-c~~ A""

11"(  :>,; .... t'.'

o""'

l"";rw1::: .* ~ .. *.;

3*1 ¢ ..

2SS-.7/ 24 ii:: v .

. :3'0/4 03 MVA

~0.2 GE~E~TO~

~J. I G~~=.<ATOR .

  • 25 KV
  • 1~00 MVA 0.9 P-f .

. 25 KV. l&:lO. MVA 0.9 .~t

-Note:

{*). The.Keeney Lin~'

will be

av~ilabie when Unit _.2 is in operati~n ..

~*

. . . .;;

. The. st'a'f ! con_ci uded tJie ~eg*u'latory Gu1de l .108 I* *periodic .

'resting of DicselG~nr:rator Uni.ts as;On~ite. Electric Power Sy.stems>*

et ~uclear'.Po.'lor'.er F*li!nts* is applicable -for the-Sa.lem 2 facility;:**

Since*_ this 9*uide add_rcsses bot.h pre~operatiorial. a*nd pe.riodi~. . .*

testing, *PSELG .needs t*o be ._modified-to d,escribe how )'Our planned.

pr~-ope:ratiof!al tests. wi.ll

  • con!ora* with" this gu{de of how the;* *
  • .will provide_ for eqµiv.a.lent pr:e-6,Perational testing.

The -No. 2 Unit inl.tial pre-ope;-ational test pr~*9~am _is in con~

fo~-ce with the ~gulat.ocy Guid'e *1*108 vith the following ex~

ceptions:.

  • Paragraph c2 ~a ( 4) -~ We_ comply .with the s_ection by tripping the "iese1 .-output: bre_~k:er at* 21~0 J<W c2()00 hour_ ratin 9 > veri!y_i~q that.the volta9e.reg-U1atiori.is*rn.aintairied . within the acceptable l
  • . . .-
  • 1intits. ~d- the ailowabie- bverspeed d~s. i:'o:t 'trip out the diesel.
  • .We f~e_l ~-h~s transient is more severe: than the ioad *shedding

- . requirements ident.!-fied in the regulatocy guide.

Paragraph c. 2a (5) _* ..we will perfo~ the test described in this .

. section, but. due to the sequence cf testing $. t may not be innnedietel:r after >t.he test described .in C: *. 2. a (3)., . The generator sy_~tems will, *however; be at full_ load tempeI:"ature$.

  • Paragraph, c .. 2.a(6) - Our plant is net designed to perform the

.test des"cribed in this* s'ection~-

Ci' /3. 9(c) -/

Paraqraph c.2.a(9) - To accomplish this reliability demonstration, we -..,ill increase the frequency- of surveillance testing to acquire the 23 consecutive 6uccessfull valid st.arts per diesel prior to . t proceeding beyond the Zero Power Physics '!'est Program. -ro accomplish this,.wc intend to take credit for those diesel atarts accomplished to date or scheduled during Integrated Safe-guards Testing, as -long as the die~els are loaded to a minimum of approximately 25\ and the run durations- are approximately 30 minutes or more. All additional starts will comply with the regulatory guide criteria for valid tests.

t?/3. '1 {c/- z_

,i.;. ' - ~

.* . ';.

l.-. .

The staff* has :con cl oded the. :Reg. Guide. 1. 6 B.'2 .~ Initial *start-

. up T.~s.t Pr:osrdr.i to Dcmon.?trate Rcr::ote *Shutdown Capability 'for * .

' ~- ,. .-

. \\ater.-C:opfed J~utlcar.Power Plants". is applfcable !or. the Salem 2 .

facility .. : .J\l~C requi.res* that your: ap?li¢ation be correc~ecl and .. *.

  • iDodi fied to describu*: the test's planned to con.form w_i th the guide

'or £h0\..' that 'cqui va lent testing ~ill be conducted.' :state your

  • rntent tO..coipl~* with our:-requireroent. :
  • ANSWER*..
The Salein plant. was. designed for remote hot shutdown. froo outside the control.room. This.. was .. described in Section 7. 7 of the -FSAR,;;

Our capability to 90 to a cola shutdown condition *through the use

- of'-'procedurcs'. and tenporacy modi'ticatioris was' descri'.bed ~n the Resporis~ t6-Question*Q9.CS~.

General Design* Criterion 19. -of lb CFR SO Appendix A requ;res a*

design ca pa bi li ty for' remqte he>~:-s,hutdo..;m with 0 potential: '

_cap:ab{1:i ty.

  • for.

sub$~quent *cold shutdown

. thro~gh

~ui table procedures

_*A detail procedure wili i,e* vtitten .exp'iain.in9 the actions to be-taken 'to brin'g the pl.ant. from a.* hot. &hut-down to a cold shut-down C<"'"1dition from outside the control room.* This procedure Yill be completed b~; February 19, .1979 ~

  • A t_rial- run, not an actual* test ho"Wever, will be performed ..
  • to
  • demOnst.rate -the comm*unication, *coordination .and capabilities of the proc:-cdure con di ti_ons.*:' This trial. run sha.11 be .performed prior to fuel *load. A fll1lctiof)al outline will be submitted to* the staff *

. which_ will pres~nt t.h'e highlights- of the. detail procedure. ind.icatin9 how cold. shutdown wi'il. achieved* : 'l'his will be transmitted for thc'staffsrcview by Fcbi;-uary 5, 1979.