ML19290B737: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . | {{#Wiki_filter:. . | ||
Ms - | Ms - | ||
MEMPHIS STATE UNIVERSITY | MEMPHIS STATE UNIVERSITY | ||
/g Q r @) MEMPHIS, TENNESSEE 38152 | /g Q r @) MEMPHIS, TENNESSEE 38152 | ||
\ a ' | \ a ' | ||
JM' November 26, 1979 | JM' November 26, 1979 Center for Nuclear Studies Office of the Dsrector (901) 454 2687 .. | ||
Center for Nuclear Studies Office of the Dsrector | |||
(901) 454 2687 .. | |||
Director c U. S. Nuclear Regulatory Commission - | Director c U. S. Nuclear Regulatory Commission - | ||
Region II 2-Office of Inspection and Enforcement C 101 Marietta Street, Suite 3100 Atlanta, GA 30303 | Region II 2-Office of Inspection and Enforcement C 101 Marietta Street, Suite 3100 Atlanta, GA 30303 | ||
| Line 40: | Line 33: | ||
switch was discovered in the Shield Water Level Safety Channel during performance of the Prestartup Checkoff Procedure. Initial notification was made to your office by telephone and confirmed by mailgram on November 16, 1979. | switch was discovered in the Shield Water Level Safety Channel during performance of the Prestartup Checkoff Procedure. Initial notification was made to your office by telephone and confirmed by mailgram on November 16, 1979. | ||
The faulty switch has been replaced and tested, and normal reactor operations were resumed November 16, 1979. | The faulty switch has been replaced and tested, and normal reactor operations were resumed November 16, 1979. | ||
Sincerely 3 | Sincerely 3 s' /q yL D. W. Jones Dire 6 tor RLD/pm | ||
s' /q yL D. W. Jones Dire 6 tor | |||
RLD/pm | |||
==Enclosure:== | ==Enclosure:== | ||
| Line 51: | Line 40: | ||
The Nation's first Regional Center ior Nuclear Manpou:er Development 00 A, , | The Nation's first Regional Center ior Nuclear Manpou:er Development 00 A, , | ||
An Equal Opportunity University .,.O u -- | An Equal Opportunity University .,.O u -- | ||
7912130615'}} | 7912130615'}} | ||
Revision as of 15:25, 1 February 2020
| ML19290B737 | |
| Person / Time | |
|---|---|
| Site: | 05000538 |
| Issue date: | 11/26/1979 |
| From: | David Jones MEMPHIS STATE UNIV., MEMPHIS, TN |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19290B738 | List: |
| References | |
| NUDOCS 7912130615 | |
| Download: ML19290B737 (1) | |
Text
. .
Ms -
MEMPHIS STATE UNIVERSITY
/g Q r @) MEMPHIS, TENNESSEE 38152
\ a '
JM' November 26, 1979 Center for Nuclear Studies Office of the Dsrector (901) 454 2687 ..
Director c U. S. Nuclear Regulatory Commission -
Region II 2-Office of Inspection and Enforcement C 101 Marietta Street, Suite 3100 Atlanta, GA 30303
.~
Dear Sir:
Enclosed is the follow-up report to a reportable occurrence identified at the Memphis State University AGN-201 Reactor Facility on November 16, 1979. The report is submitted in accordance with section 6.9.2 of Appendix A to the Facility Operating License R-127, Docket 50-538.
The reactor was being prepared for startup when a faulty micro- 8%
switch was discovered in the Shield Water Level Safety Channel during performance of the Prestartup Checkoff Procedure. Initial notification was made to your office by telephone and confirmed by mailgram on November 16, 1979.
The faulty switch has been replaced and tested, and normal reactor operations were resumed November 16, 1979.
Sincerely 3 s' /q yL D. W. Jones Dire 6 tor RLD/pm
Enclosure:
Follow-up Report to Reportable Occurrence No. 79-3 cc: Mr. D. K. Baer, CNS/MSU Dr. D. W. Cooke,.MSU Mr. G. W. Cross, CNS/MSU Mr. R. L. Dietz, CNS/MSU Mr. P. J. Kellogg, USNRC, Region II 1555 060 Mr. M. M. Martin, CNS/MSU Mr. L. B. O' Kelly, MSU pd Mr. M. D. Shepherd, CNS/MSu 5, Mr. J. M. Winders, CNS/MSU
///
The Nation's first Regional Center ior Nuclear Manpou:er Development 00 A, ,
An Equal Opportunity University .,.O u --
7912130615'