ML19317E993: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.                                                                . . . . -
{{#Wiki_filter:.                                                                . . . . -
    ' '
                      .
n                                  ~
n                                  ~
              ..
        -  " '*
                                          -
Duka Powar Company                    '
Duka Powar Company                    '
                    .
Oconta Unit 3 Report No: UE-287/74-2                                                              .
Oconta Unit 3 Report No: UE-287/74-2                                                              .
* Report Date: October 22, 1974                      ,
Report Date: October 22, 1974                      ,
Event Date: September 10, 1974 Facility: Oconee Nuclear Station, Unit 3 Identificatien of Event: Modification ~of 4 Kv Switchgear.without proper authorization Conditions Prior to Event:      Startup testing below 15% power            -
Event Date: September 10, 1974 Facility: Oconee Nuclear Station, Unit 3 Identificatien of Event: Modification ~of 4 Kv Switchgear.without proper authorization Conditions Prior to Event:      Startup testing below 15% power            -
                                                                                            .
  .
                                                                                        -
Description of Event:
Description of Event:
on May 1, 1974 the Design Engineering Department of Duke Power Coepany originated
on May 1, 1974 the Design Engineering Department of Duke Power Coepany originated l
'
Station Kodification Report (SMR) 0-225-D, which involved several =f ar altera-tions t; the 7 Kv and 4 Kv Switchgear transfer circuits. When the MR was sent to the statica on July 25, 1974 only the 7 Kv portion of the 512 had been cleared for acct =plish=cnt. This was due to the fact that the 4 Kv Switchgear was safety-related and a safety analysis had not been performed at that time.
l Station Kodification Report (SMR) 0-225-D, which involved several =f ar altera-tions t; the 7 Kv and 4 Kv Switchgear transfer circuits. When the MR was sent to the statica on July 25, 1974 only the 7 Kv portion of the 512 had been cleared for acct =plish=cnt. This was due to the fact that the 4 Kv Switchgear was safety-related and a safety analysis had not been performed at that time.
On August 5, 1974, approval was obtained to coc=ence work on the 7 Kv Switchgear and a work request was originated. On August 23, 1974, work was co=pleted by a Construction Departnent electrician on both the 7 Kv and the 4 Kv Switchgear under the supervision of Oconee Operations personnel. The fact that unauthorized work had been perforced on the 4 Kv Switchgear was determined on Septe=ber 10, 1974.
On August 5, 1974, approval was obtained to coc=ence work on the 7 Kv Switchgear and a work request was originated. On August 23, 1974, work was co=pleted by a Construction Departnent electrician on both the 7 Kv and the 4 Kv Switchgear under the supervision of Oconee Operations personnel. The fact that unauthorized work had been perforced on the 4 Kv Switchgear was determined on Septe=ber 10, 1974.
Designation of Apparent Cause of Event:
Designation of Apparent Cause of Event:
'              The electrician in charge of the work recognized the fact that the 4 Kv portion
'              The electrician in charge of the work recognized the fact that the 4 Kv portion of the Sla was =inor, since it only involved connecting cables to the switchgear for co=puter indication. However, the required safety analysis had not been completed. This event occurred as a result of personnel not following established work procedures..
,
of the Sla was =inor, since it only involved connecting cables to the switchgear for co=puter indication. However, the required safety analysis had not been completed. This event occurred as a result of personnel not following established work procedures..
1 Analysis of Event:
1 Analysis of Event:
                                    '
The modification to the 4 Kv Switchgear transfer circuits added indication of the type of transfer (rapid or delayed). The ti=e delay in the transfer s-br=es had already been included in the 4 Kv circuits, and were not af fected by the =cdification. Therefore, this incident did not affect the safe operation of the Switchgear'or the health and safety of the public.
The modification to the 4 Kv Switchgear transfer circuits added indication of the type of transfer (rapid or delayed). The ti=e delay in the transfer s-br=es had already been included in the 4 Kv circuits, and were not af fected by the =cdification. Therefore, this incident did not affect the safe operation of the Switchgear'or the health and safety of the public.
Corrective Action,:
Corrective Action,:
The Safety Analysis of the 4 Kv portion of the SMR was co=pleted prior to dis-covering the unauthori:'d codification, therefore i==ediate corrective action was not necessary. The Mcident has been reviewed with personnel involved and thelimportance of co=plyira with established procedures has been reiterated.
The Safety Analysis of the 4 Kv portion of the SMR was co=pleted prior to dis-covering the unauthori:'d codification, therefore i==ediate corrective action was not necessary. The Mcident has been reviewed with personnel involved and thelimportance of co=plyira with established procedures has been reiterated.
l t oo /076 79.L . -}}
l t oo /076 79.L . -}}

Revision as of 07:05, 1 February 2020

Unusual Event 287/74-02:on 740910,mod of 4 Kv Switchgear Completed on 740828 Was Determined Unauthorized.Cause Not Stated.Importance of Complying W/Established Procedures Reiterated
ML19317E993
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/22/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E923 List:
References
RO-287-74-02, RO-287-74-2, NUDOCS 8001070791
Download: ML19317E993 (1)


Text

. . . . . -

n ~

Duka Powar Company '

Oconta Unit 3 Report No: UE-287/74-2 .

Report Date: October 22, 1974 ,

Event Date: September 10, 1974 Facility: Oconee Nuclear Station, Unit 3 Identificatien of Event: Modification ~of 4 Kv Switchgear.without proper authorization Conditions Prior to Event: Startup testing below 15% power -

Description of Event:

on May 1, 1974 the Design Engineering Department of Duke Power Coepany originated l

Station Kodification Report (SMR) 0-225-D, which involved several =f ar altera-tions t; the 7 Kv and 4 Kv Switchgear transfer circuits. When the MR was sent to the statica on July 25, 1974 only the 7 Kv portion of the 512 had been cleared for acct =plish=cnt. This was due to the fact that the 4 Kv Switchgear was safety-related and a safety analysis had not been performed at that time.

On August 5, 1974, approval was obtained to coc=ence work on the 7 Kv Switchgear and a work request was originated. On August 23, 1974, work was co=pleted by a Construction Departnent electrician on both the 7 Kv and the 4 Kv Switchgear under the supervision of Oconee Operations personnel. The fact that unauthorized work had been perforced on the 4 Kv Switchgear was determined on Septe=ber 10, 1974.

Designation of Apparent Cause of Event:

' The electrician in charge of the work recognized the fact that the 4 Kv portion of the Sla was =inor, since it only involved connecting cables to the switchgear for co=puter indication. However, the required safety analysis had not been completed. This event occurred as a result of personnel not following established work procedures..

1 Analysis of Event:

The modification to the 4 Kv Switchgear transfer circuits added indication of the type of transfer (rapid or delayed). The ti=e delay in the transfer s-br=es had already been included in the 4 Kv circuits, and were not af fected by the =cdification. Therefore, this incident did not affect the safe operation of the Switchgear'or the health and safety of the public.

Corrective Action,:

The Safety Analysis of the 4 Kv portion of the SMR was co=pleted prior to dis-covering the unauthori:'d codification, therefore i==ediate corrective action was not necessary. The Mcident has been reviewed with personnel involved and thelimportance of co=plyira with established procedures has been reiterated.

l t oo /076 79.L . -