ML19323H610: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 26: | Line 26: | ||
All important aspects of the plan have been written as required and are, in general, in effect at this date. The figures and details of related procedures required by this plan are in the process of being completed. | All important aspects of the plan have been written as required and are, in general, in effect at this date. The figures and details of related procedures required by this plan are in the process of being completed. | ||
Sincerely yours, | Sincerely yours, | ||
~. | ~. | ||
Samuel H. Levine Director, Breazeale Nuclear Reactor l Professor, Nuclear Engineering l SHL:m l | Samuel H. Levine Director, Breazeale Nuclear Reactor l Professor, Nuclear Engineering l SHL:m l | ||
cc: R. Carter, Project Manager W. F. Witzig I. B. McMaster Soo4 s | cc: R. Carter, Project Manager W. F. Witzig I. B. McMaster Soo4 s | ||
//o 8006180 2 N}} | //o 8006180 2 N}} |
Latest revision as of 02:31, 1 February 2020
ML19323H610 | |
Person / Time | |
---|---|
Site: | Pennsylvania State University |
Issue date: | 06/06/1980 |
From: | Levine S PENNSYLVANIA STATE UNIV., UNIVERSITY PARK, PA |
To: | John Miller Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8006130278 | |
Download: ML19323H610 (1) | |
Text
TH E P ENNSYLVANI A S T ATE U NIVERSITY UNIVERSITY PARK. PENNSYl VANIA 16802 College of Engineering Area code si4 Breazcale Nuclear Rexkr 365-635I 6 June 1980 Mr. James R. Miller, Chief Standardization and Special Projects Branch Division of Licensing Nuclear Regulatory Commission Washington, D.C. 20555 Docket No.: 50--5 NRC License: F.- 2
Subject:
Physical Security Plan
Dear Mr. Miller:
The new physical security plan for the physical protection of SNM of low stratagic significance at the Penn State Breazeale Reactor will be submitted to_the NRC by August 1, 1980 as required by 10 CFR 73.67.
All important aspects of the plan have been written as required and are, in general, in effect at this date. The figures and details of related procedures required by this plan are in the process of being completed.
Sincerely yours,
~.
Samuel H. Levine Director, Breazeale Nuclear Reactor l Professor, Nuclear Engineering l SHL:m l
cc: R. Carter, Project Manager W. F. Witzig I. B. McMaster Soo4 s