AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY R. J. Hickle TELEPHONE h02-536 kh13 MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 0.0 39 4 0.0 0.0 20 5 0.0 21 _ | |||
AVERAGE DAILY UNIT POWER LEVEL | |||
MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 0.0 39 4 0.0 0.0 20 5 0.0 21 _ | |||
0.0 6 0.0 22 0.0 7a 0.0 0.0 23 8 0.0 .4 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0 . 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 0.0 30 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt. | 0.0 6 0.0 22 0.0 7a 0.0 0.0 23 8 0.0 .4 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0 . 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 0.0 30 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
1 | 1 | ||
) | ) | ||
l (9/77) { | l (9/77) { | ||
8006170Y N | 8006170Y N | ||
~ | ~ | ||
OPERATING DATA REPORT i | OPERATING DATA REPORT i | ||
DOCKET NO. 50-285 | DOCKET NO. 50-285 DATE June o. 1980 COMPLETED BY B J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1- Notes ' | ||
DATE June o. 1980 COMPLETED BY B J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1- Notes ' | |||
: 1. Unit Name: | : 1. Unit Name: | ||
+ | + | ||
: 2. Reporting Period; hv . 1080 | : 2. Reporting Period; hv . 1080 | ||
: 3. Licensed Thermal Power (MWt): 1h20 4 4. Nameplate Rating (Gross MWe): 502 | : 3. Licensed Thermal Power (MWt): 1h20 4 4. Nameplate Rating (Gross MWe): 502 | ||
: 5. Design Electrical Rating (Net MWe): h57 | : 5. Design Electrical Rating (Net MWe): h57 | ||
, 6. Maximum Dependable Capacity (Gross MWe): h81 | , 6. Maximum Dependable Capacity (Gross MWe): h81 | ||
| Line 68: | Line 50: | ||
, 18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9 | , 18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9 | ||
: 19. Unit Service Factor 0.0 11.8 74.9 | : 19. Unit Service Factor 0.0 11.8 74.9 | ||
: 20. Unit Availability Factor 0.0 11.8 74.9 | : 20. Unit Availability Factor 0.0 11.8 74.9 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 21. Unit Capacity Factor (Using MDC Net) 0.0 10.9 63.4 | ||
0.0 10.9 63.4 | |||
, 22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0 | , 22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0 | ||
: 23. Unit Forced Outage Rate 0.0 0.0 4.5 | : 23. Unit Forced Outage Rate 0.0 0.0 4.5 | ||
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each): | ||
None | None | ||
: 25. If Shut Down At End Of Report Period.Esnmated Date of Startup: June 7, 1980 | : 25. If Shut Down At End Of Report Period.Esnmated Date of Startup: June 7, 1980 | ||
: 26. Units in Test Status tPrior to Commerci21 Operation): Forecast Achieved l - | : 26. Units in Test Status tPrior to Commerci21 Operation): Forecast Achieved l - | ||
i th: 4AL CRITICALITY -' | i th: 4AL CRITICALITY -' | ||
! INITIA L ELECTRICITY | ! INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77) | ||
COMMERCIAL OPER ATION (4/77) | |||
+ .. | + .. | ||
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m | UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m | ||
DATE June 9. 1980 4 | DATE June 9. 1980 4 | ||
REPORT MONTH May. 1980 COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 | REPORT MONTH May. 1980 COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 1 | ||
1 | |||
= r. 1.5. | = r. 1.5. | ||
c h !0 ?jy CC CC j% Cause & Corrective No. Date g | c h !0 ?jy CC CC j% Cause & Corrective No. Date g | ||
E. | E. | ||
g .3 63m : vent ;,3 un U g}Uo Action to oO E Report a Prevent Recurrence y Di g 6 | g .3 63m : vent ;,3 un U g}Uo Action to oO E Report a Prevent Recurrence y Di g 6 | ||
80-01 800118 s 3216.5 c 1 n/A Reactor shutdown for annual refueling and maintenance outage. | 80-01 800118 s 3216.5 c 1 n/A Reactor shutdown for annual refueling and maintenance outage. | ||
i 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG. | |||
i 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions | |||
S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG. | |||
D Regulatory Restriction 4 Other (Explain) 0161) | D Regulatory Restriction 4 Other (Explain) 0161) | ||
E Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Sime Source | E Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Sime Source (9/77) Il-Other (Explain) | ||
(9/77) Il-Other (Explain) | |||
Rcfueling Infonxttion Fort Calhoun - Unit No.1 - | Rcfueling Infonxttion Fort Calhoun - Unit No.1 - | ||
Report for the month ending May 31, 1980 . | Report for the month ending May 31, 1980 . | ||
Scheduled date for next refueling shutdown. March 15. 1981 | Scheduled date for next refueling shutdown. March 15. 1981 | ||
: 1. - | : 1. - | ||
: 2. Scheduled date for restart folleaing refueling. May 15, 1981 | : 2. Scheduled date for restart folleaing refueling. May 15, 1981 | ||
: 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment? | : 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment? | ||
: a. If ana.cr is yes, what, in general, will these be? | : a. If ana.cr is yes, what, in general, will these be? | ||
: b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload. No | : b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload. No | ||
.c. If no such review has taken place, when is it scheduled? February 1, 1981 | .c. If no such review has taken place, when is it scheduled? February 1, 1981 | ||
: 4. Scheduled date(s) for subm.itting proposed licensing action and support infor: ration. | : 4. Scheduled date(s) for subm.itting proposed licensing action and support infor: ration. | ||
: 5. Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures. | : 5. Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures. | ||
: 6. The nu:rbor of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool' storage capacity 483 d) planned spent fuel pool storage capacity 483 . | |||
: 6. The nu:rbor of fuel assemblies: a) in the core 133 assemblies | : 7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity. 1985 Prepared by MA Date June 5, 1980 g | ||
v M 4 e , | |||
b) in the spent fuel pool 197 c) spent fuel pool' | |||
storage capacity 483 d) planned spent fuel pool | |||
storage capacity 483 . | |||
: 7. - The projected date of the last refueling that can *m | |||
discharged to the spent fucl pool asst:ning the present licensed capacity. 1985 Prepared by MA Date June 5, 1980 g | |||
v | |||
M 4 e , | |||
CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS | CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS | ||
| Line 168: | Line 101: | ||
: 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a | : 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a | ||
. s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert: | . s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert: | ||
Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued) | Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued) | ||
Operations | Operations | ||
_ Incident Deficiency | _ Incident Deficiency OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995. | ||
OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995. | |||
OI-937 (ST-7A h) 7A-6h Flev Rate. | OI-937 (ST-7A h) 7A-6h Flev Rate. | ||
OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1) HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2) Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov . | OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1) HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2) Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov . | ||
| Line 187: | Line 115: | ||
1 Mark 3are Mark L. Gutier ec I John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these - | 1 Mark 3are Mark L. Gutier ec I John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these - | ||
empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de. | empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de. | ||
Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license. | Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license. | ||
H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59 | H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59 | ||
| Line 205: | Line 126: | ||
: 1) Incorporate secondary water ch mistry reqY re=ents into License conditions. | : 1) Incorporate secondary water ch mistry reqY re=ents into License conditions. | ||
1st' | 1st' | ||
'I'dtY\\..\@i Approved 3y - | |||
'I'dtY\\..\@i | ; jfahager-For:'Calhoun Station i} | ||
1 l | |||
e u-- | |||
Approved 3y - | |||
; jfahager-For:'Calhoun Station | |||
i} | |||
1 | |||
l | |||
e | |||
u-- | |||
l 1 | |||
l | Menthly Cperations Repcrt May 1980 | ||
?sge Four | ?sge Four | ||
:"" . MA-.r.s A3CI (Signif10 ant Safety Related) | :"" . MA-.r.s A3CI (Signif10 ant Safety Related) | ||
M. 0 | M. 0 | ||
* a:e t esert :: ten ; ;c=ective A:: :n h7k5 5-5-80 Modify ACS-155/161. Work perfor=ed, restraint: returnec to operating condition. | * a:e t esert :: ten ; ;c=ective A:: :n h7k5 5-5-80 Modify ACS-155/161. Work perfor=ed, restraint: returnec to operating condition. | ||
h388 5-10-80 Packing leak on HCV-3h8. Replace packing and returned to | h388 5-10-80 Packing leak on HCV-3h8. Replace packing and returned to operating condition. | ||
operating condition. | |||
5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints. | 5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints. | ||
Retu=ed to Normal operation. | Retu=ed to Normal operation. | ||
| Line 253: | Line 154: | ||
51k6 5-2-80 Modify Hanger ! ACE-327. Werk perfo med md retun ed to operating condition. | 51k6 5-2-80 Modify Hanger ! ACE-327. Werk perfo med md retun ed to operating condition. | ||
3151 5-11-80 Modify Hanger # SIS ~127A. | 3151 5-11-80 Modify Hanger # SIS ~127A. | ||
'Jork perfc med and retum ed ,0c cperating condition, s | |||
'Jork perfc med and retum ed ,0c | |||
cperating condition, s | |||
_, ,- 7 -- | _, ,- 7 -- | ||
Men:hly Operstiens 2epert May 1980 | Men:hly Operstiens 2epert May 1980 | ||
?._z e ?1 re | ?._z e ?1 re | ||
| Line 282: | Line 178: | ||
l 5h60 5-1-80 Modiff Hanger #C3W-3. *4erk perfc=ed snd retuned to ~ | l 5h60 5-1-80 Modiff Hanger #C3W-3. *4erk perfc=ed snd retuned to ~ | ||
f operating condition. | f operating condition. | ||
Ment h.1-/ Operstions Repar-May 1980 pige SiX | Ment h.1-/ Operstions Repar-May 1980 pige SiX | ||
!!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted) | !!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted) | ||
| Line 297: | Line 191: | ||
5536 5 h-30 Modiff Hanger !CH(C-31). Werk perfc=ed e-d ------e . | 5536 5 h-30 Modiff Hanger !CH(C-31). Werk perfc=ed e-d ------e . | ||
t . | t . | ||
Operating 00ndition. | Operating 00ndition. | ||
I | I | ||
Menthly 0;erati::s Re;cr-May 1980 Page Seven | Menthly 0;erati::s Re;cr-May 1980 Page Seven | ||
~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated) | ~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated) | ||
| Line 322: | Line 211: | ||
5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition. | 5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition. | ||
5589 5-3-30 Mcdify Hanger # SIS-193. Work perfor=ed and returned to Operating condition. | 5589 5-3-30 Mcdify Hanger # SIS-193. Work perfor=ed and returned to Operating condition. | ||
l 5590 5-a-80 Mcdify Hanger ! SIS-192. Werk perfer=ed and returned ,to i Operating Octdition. | l 5590 5-a-80 Mcdify Hanger ! SIS-192. Werk perfer=ed and returned ,to i Operating Octdition. | ||
, - 4- w - ~ w-- | , - 4- w - ~ w-- | ||
Monthly Operati:ts Reper. | Monthly Operati:ts Reper. | ||
May 1980 | May 1980 | ||
| Line 347: | Line 233: | ||
362- 5-9-80 Modify Hanger #RCS-1. 'icrk perf0=ed and ret =ed to operating condition. | 362- 5-9-80 Modify Hanger #RCS-1. 'icrk perf0=ed and ret =ed to operating condition. | ||
3628 5-12-80 Modify Hanger /ACS-127A. *4crk perfor=ed and returned to Operating 20ndition. | 3628 5-12-80 Modify Hanger /ACS-127A. *4crk perfor=ed and returned to Operating 20ndition. | ||
5630 3-1-80 Mcdiff Hsnger #ACH-318. '4crk perfo=ed an d --*"~ ad t o | 5630 3-1-80 Mcdiff Hsnger #ACH-318. '4crk perfo=ed an d --*"~ ad t o cperating condition. | ||
4 | 4 M:::h17 Operations Repcrt May 1980 | ||
M:::h17 Operations Repcrt May 1980 | |||
?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated) | ?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated) | ||
L , e j Ja:e I escri::: n i ;;r ect re A::ict 5631 5-11-80 Mcdiff Hanger #ACS-110A. Work perfor=ed and returned to operating condition. | L , e j Ja:e I escri::: n i ;;r ect re A::ict 5631 5-11-80 Mcdiff Hanger #ACS-110A. Work perfor=ed and returned to operating condition. | ||
| Line 372: | Line 253: | ||
569k 3-7-80 Mcdiff Hanger 15:S-17k/176. Work perf0=ed and retuned to Operating conditien. | 569k 3-7-80 Mcdiff Hanger 15:S-17k/176. Work perf0=ed and retuned to Operating conditien. | ||
5697 5-7-80 Modify Hanger #CAS h6. Work perf0=ed and retu_~ed .to , | 5697 5-7-80 Modify Hanger #CAS h6. Work perf0=ed and retu_~ed .to , | ||
J Operating condition. | J Operating condition. | ||
i | i i | ||
i | |||
4 Menthly Opersti:ns Repor May 1980 | 4 Menthly Opersti:ns Repor May 1980 | ||
?sge Ten | ?sge Ten | ||
| Line 389: | Line 264: | ||
5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition. | 5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition. | ||
5731 5-10-80 Modify Hanger /ACH-309. Work perfomed and retumed to cpersting cendition. | 5731 5-10-80 Modify Hanger /ACH-309. Work perfomed and retumed to cpersting cendition. | ||
1 57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition. | |||
1 | |||
57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition. | |||
57k3 5-10-80 Modiff Hanger /ACS-351. Work perfomed and retu =ed to opersting condition. | 57k3 5-10-80 Modiff Hanger /ACS-351. Work perfomed and retu =ed to opersting condition. | ||
57bh 5-15-80 Modiff Hanger #SE-5 ~4crk perfe=ed and returned to operating condition. | 57bh 5-15-80 Modiff Hanger #SE-5 ~4crk perfe=ed and returned to operating condition. | ||
| Line 403: | Line 275: | ||
l 5778 5-lh.-80 Modiff Hanger 153-152. Work peric=ed and retu=ed to i | l 5778 5-lh.-80 Modiff Hanger 153-152. Work peric=ed and retu=ed to i | ||
. Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92 ~4crk perfc=ed and returned to opersting condition. ; | . Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92 ~4crk perfc=ed and returned to opersting condition. ; | ||
5813 5-15-80 Modify Hanger #ACS-97. Work perfc=cd and returned 'to Operating condition. | |||
. | |||
Men hl-/ ^,peraticos Reper. | Men hl-/ ^,peraticos Reper. | ||
May 1930 | May 1930 | ||
| Line 416: | Line 285: | ||
5931 6-5-80 PC-3A Motor renoved. Replace RC-3A and returned to operating condition. | 5931 6-5-80 PC-3A Motor renoved. Replace RC-3A and returned to operating condition. | ||
5933 6-5-80 ac-3C notor re=oved. Replace RC-3C and returned to operating condition. | 5933 6-5-80 ac-3C notor re=oved. Replace RC-3C and returned to operating condition. | ||
iI l | iI l | ||
.. . . .}} | .. . . .}} | ||
Revision as of 01:25, 1 February 2020
| ML19323H996 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/09/1980 |
| From: | Hickle B OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML19323H995 | List: |
| References | |
| NUDOCS 8006170443 | |
| Download: ML19323H996 (15) | |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY R. J. Hickle TELEPHONE h02-536 kh13 MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 0.0 39 4 0.0 0.0 20 5 0.0 21 _
0.0 6 0.0 22 0.0 7a 0.0 0.0 23 8 0.0 .4 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0 . 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 0.0 30 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.
1
)
l (9/77) {
8006170Y N
~
OPERATING DATA REPORT i
DOCKET NO. 50-285 DATE June o. 1980 COMPLETED BY B J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1- Notes '
- 1. Unit Name:
+
- 2. Reporting Period; hv . 1080
- 3. Licensed Thermal Power (MWt): 1h20 4 4. Nameplate Rating (Gross MWe): 502
- 5. Design Electrical Rating (Net MWe): h57
, 6. Maximum Dependable Capacity (Gross MWe): h81
! 7. Maximum Dependabie Capacity (Net MWe): h57
, 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
n/A j N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any: N/A 2
This Month Yr. to-Date Cumulative
- 11. Hour 4 in Reporting Period 744.0 3,547.0 58,584.0 0.0 44,o34 5
- 12. Number Of Hours Reactor Was Critical 432 9 _
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 ,
1,309.5
- 14. Haurs Generator On.Line 0.0 430.5 43,881.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 'O.0
- 16. Gross Thermal Energy Generated (MWH) 0.0 57h.710.0 53.809.760.2 '.
- 17. Gross Electrical Energy Generated (MWH) 0.0 ,_, 190.604.0 17.850.833.6
, 18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9
- 19. Unit Service Factor 0.0 11.8 74.9
- 20. Unit Availability Factor 0.0 11.8 74.9
- 21. Unit Capacity Factor (Using MDC Net) 0.0 10.9 63.4
, 22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0
- 23. Unit Forced Outage Rate 0.0 0.0 4.5
- 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period.Esnmated Date of Startup: June 7, 1980
- 26. Units in Test Status tPrior to Commerci21 Operation): Forecast Achieved l -
i th: 4AL CRITICALITY -'
! INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)
+ ..
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m
DATE June 9. 1980 4
REPORT MONTH May. 1980 COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 1
= r. 1.5.
c h !0 ?jy CC CC j% Cause & Corrective No. Date g
E.
g .3 63m : vent ;,3 un U g}Uo Action to oO E Report a Prevent Recurrence y Di g 6
80-01 800118 s 3216.5 c 1 n/A Reactor shutdown for annual refueling and maintenance outage.
i 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Sime Source (9/77) Il-Other (Explain)
Rcfueling Infonxttion Fort Calhoun - Unit No.1 -
Report for the month ending May 31, 1980 .
Scheduled date for next refueling shutdown. March 15. 1981
- 1. -
- 2. Scheduled date for restart folleaing refueling. May 15, 1981
- 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
- a. If ana.cr is yes, what, in general, will these be?
- b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload. No
.c. If no such review has taken place, when is it scheduled? February 1, 1981
- 4. Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
- 5. Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
- 6. The nu:rbor of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool' storage capacity 483 d) planned spent fuel pool storage capacity 483 .
- 7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity. 1985 Prepared by MA Date June 5, 1980 g
v M 4 e ,
CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS
SUMMARY
Ford, Calhoun remained in a cold shutdown condition during the scnth of May..
Preparations and required prerequisites for plant startup were cenpleted during May. -
Reactor coolant pump case coter gasket leaks vere disco'rered to be leak-ing during the cold hydro test and the plant was plc.ced in a ccnfigurstion to work en the reacter coolant pump.
The Operations Department attended Combustien Engineering Si=ulater Training during the =cnth of May. All shifts have ecmpleted the requeli-fication training at the simulator as prescribed in the Fort Calheen Training Progrsm.
Required surreillance tests and operational tests vere completed during May.
A. PERFORM.GCE CHARACTERISTICS lER Number Deficienev 80-007 As directed by "E Bulletin 79-013 the penetration es'le o splices for the containment ventilation fans VA-3A, VA-33, VA-TC and VA-7D lack documentation on LOCA qualificatien. The splices are being reported even though an investigation of =aterial properties of Irrsthene SFT tapa, Irrasil tape, and silicone R""I indicate the splice vould with-stand a LOCA.
- 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a
. s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:
Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)
Operations
_ Incident Deficiency OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995.
OI-937 (ST-7A h) 7A-6h Flev Rate.
OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1) HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2) Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov .
pressure alar =, fuel oil transfer pu.p high pressure alar =, Jacket water te=perature cold, i==ersion heater te=perature centrol switch.
D. CHANG 3, TESTS AND uu124EN"S CARRIED CUT EnCUT COMMISSION AFFROVAL F oceduce Descrittien CI-968 (ST-NDWC-1) TIC-7333 Out of Tolerance.
OI-967 (ST-C:~1) TR-196, FR-1395, 73-1398 Cut of Tolerance l l
DCR 77-108 Dual Volts /HZ, ST7 Relay /Cc=pleted as designed.
l E. RESULTS CF LEAK' RATE TESTS l Local leak rates continued to be performed in May whil the plant was shut devn for the 1980 Refueling Cutage. A cc=plete report vill be forthec=ing at the end of the outage. No abnormal leaks were detected in May. j l
F. C"-1ANGES ET PLANT CPERAT2TG STAFF I The folleving individuals vere added to the plant staff:
1 Mark 3are Mark L. Gutier ec I John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these -
empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.
Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.
H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59
- 1. Changes to Facility Operating License DPR-ho Amendment Nc,. h6, dated May 27, 1980. The amendment revises the License as follows:
a) Modifies Appendix A Technical Specifications to:
l
- 1) Add two shock suppressors to listing of those l required to be tested.
- 2) Permit limited testing of shock suppressors during power operation.
b) Modifies Appendix B Technical Specifications to:
- 1) Incorporate secondary water ch mistry reqY re=ents into License conditions.
1st'
'I'dtY\\..\@i Approved 3y -
- jfahager-For
- 'Calhoun Station i}
1 l
e u--
l 1
Menthly Cperations Repcrt May 1980
?sge Four
- "" . MA-.r.s A3CI (Signif10 ant Safety Related)
M. 0
- a:e t esert :: ten ; ;c=ective A:: :n h7k5 5-5-80 Modify ACS-155/161. Work perfor=ed, restraint: returnec to operating condition.
h388 5-10-80 Packing leak on HCV-3h8. Replace packing and returned to operating condition.
5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints.
Retu=ed to Normal operation.
581h 5-15-80 AB-1 (K-1) Relay failed - RPS Removed, repaired, and cleaned A3 Matrix. Belay contacts. Returned to operating condition.
5911 5-27-80 ?" one square foot section of P" as required - Satisfactory. 4 A & B RC pumps.
5913 5-23-80 Repair to =eet ASME XI requirements Repaired as require?, - satisfacto:y.
- cover-to-casing studs for RC pt=ps.
5932 5-30-80 RC-3B Motor Removed. Replace RC-3B :otor - returned to operating condition.
kTL5 5-5-80 Modify Hanger #ACS-155/161. Work perfor=ed and retu=ed,to operating ccndition.
5062 5-6-80 Modify Hanger # SIS-188. Werk performed and raturned to operating ecndition.
5112 5-8-80 Modify Hanger #T4H-166. Work perfor=ed and returned to operating condition.
5116 5-6-80 Modify Hanger /SISL119 ,
Werk perfomed and returned to operating ccndition.
5118 5-7-80 Modify Hanger /ACH hh7. Work perfc=ed and returned to operating conditicn.
51h3 5-1-80 Mcdify Hanger VRCH-19 Work perfer:ed and retu ned te operating conditicn.
51k6 5-2-80 Modify Hanger ! ACE-327. Werk perfo med md retun ed to operating condition.
3151 5-11-80 Modify Hanger # SIS ~127A.
'Jork perfc med and retum ed ,0c cperating condition, s
_, ,- 7 --
Men:hly Operstiens 2epert May 1980
?._z e ?1 re
~~. MA L .;_;riCI (31gnifi: ant safety Related)
- t. 2. e Cate i :escri cien i :c- ee:1. e Ac:::=
5152 5-2-80 Modiff Hanger #S*H-199 Work perfc =ed and retuned to operating ccndition.
5162 5-5-80 Medief Hanger #RCS-53. Werk perfo =ed and returned to operating condition.
5225 5-1-80 Modiff Hanger #ACH h13/275 'Jork perfor=ed and retun ed to operating conditicn.
5228 5-2-80 Modiff Hanger #RCS-30A. Work perfc med and returned to operating ccndition.
5237 5-(40 Modify Hanger #RCH-53 Werk perfor=ed and returned to operating ccndition.
5258 5-3-80 Modif/ Hanger #ACH-335 Work perfer ed and retu ned to operating cen:iiticn.
53h5 5-2-80 Modify Hanger #SIH-lh1. Work perfor:ed and returned to operating ccnditicn.
53b6 5-6-80 Modif7 Hanger #SIH-210. '4crk perfor=ed and retuned to opersting ccndition.
53h? 5-8-80 Medief Hanger #SIH-212/271. ' Jerk perfersed and retu ned to operating condition.
5388 5 h-80 Medit/ Hanser #ACH-291/ACS-108. Work perfomed d - +urned to Operating cendition.
5h21 5-9-80 Modif7 Hanger #MSH-72. Work perfo med and retuned to operating cendition.
5h22 5-9-80 Medief Hanger #MSH-75 Werk perfc = ed and returned to operating cendition.
Sh23 5-9-80 Modiff Hanger #MSH-73 Work perfc =ed and returned to Operating cer.dition.
5hh0 5-7-80 Modif/ Hanger #MSH-71. Work perfor=ed and returned to operating conditicn.
5k5i 3-2-80 Medie/ Hanger # SIS-132. Work perfc=ed -e --- ned to operating ccnditicn.
l 5h60 5-1-80 Modiff Hanger #C3W-3. *4erk perfc=ed snd retuned to ~
f operating condition.
Ment h.1-/ Operstions Repar-May 1980 pige SiX
!!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)
- 4. 2.
- I : ate 1 :esertp: ten i ;:rree:1re A::::n e Sh66 5-3-80 Modify Hanger #ACH h06/ACS-291, Work performed and returned to opersting condition, SkS9 5-3-80 Modify Hanger /WD(A-1k). Work perfo=ed and returned to opersting condition.
5h99 5-10-80 Medity Hanger #MSH-76, verk perfor=ed and returned to opersting condition.
5507 5-10-30 Modiff Hanger #ACS-350. Work perfor=ed and returned to opersting condition, 5508 5-1-80 Modify Hanger # SIS-119 Work perfor=ed and returned to operating condition, 5509 5-11-30 Modi?/ Hanger #SIH-205, 'Jork perfer=ed and retumed to opersting conditien, 5511 5-5-30 ModiP/ Hanger #ACS-31hA. Work perf =ed and retuned to opersting ecndition.
5515 5-3-30 Modify Hanger #SIH-209 Work perfomed and retu=ed to operating condition, 5513 5-7-30 Modiff Hanger #SIH-208. Werk perfc=ed snd retu ned to opersting condition, 5527 5-1-30 Modify Hanger #ACH-309 Work perf =ed and retu=ed to opersting conditi:n, 5530 5-3-30 Modiff Hanger # SIS-lho. Werk perfomed snd retuned to Operating condition.
5531 5-1-30 Modify Hanger # MSS-10. Work perfor:ed and retuned to opersting condition.
5533 5-2-30 Modiff Hanger 1AC(A-13E). '4crk perf:rmed a-d --+umed to opersting condition, 553h 5 h-80 Modiff Hanger !CH(I-12), Werk perfor=ed sad retu n ed to opersting condition.
5533 5-1-30 Mcdify Hanger #SI(0-5). Work perf =ed and returned to opersning ocndition.
5536 5 h-30 Modiff Hanger !CH(C-31). Werk perfc=ed e-d ------e .
t .
Operating 00ndition.
I
Menthly 0;erati::s Re;cr-May 1980 Page Seven
~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)
M. : . I ; ate i Jescri;;;:n a : rree :ve A::::n i 5537 5-3-80 Modify Hanger #SI(E h). Work perfor=ed ani returned to operating condition.
5538 5-2-30 Modify Hanger #CH(E-3h). Work perfor=ed and returned to opersting condition.
55ho 5-10-80 Modify Hanger #ACH-356. Work perfer=ed and returned to opersting ccndition.
55h1 5-6-80 Modify Hanger # MSS-9A. Work perferned and returned to opersting condition.
55L2 5-1-30 Mcdify Hanger # MSS-13. Work performed and returned to operating 00ndition.
55h5 5-7-80 Mcdify Hanger #SIH-211. Work perforned and returned to operating condition.
55k6 5-9-80 Modify Hanger #MSH-Th. Werk perferned and returned to operating condition.
5558 5-3-30 Modify Hanger VAC(A-26). Work perfer=ed and returned to operating condition.
5559 5-3-30 Modify Hanger # MSS-9 Work perfer=ed and returned to operating ccndition.
5561 5-1k-80 Modify Hanger #SIH-131. Wert performed and returned to Operating 00ndition.
5563 5-6-30 Moddfy Hanger #ECS-58. Work perfor=ed and returned to operating 00ndition.
556b 5 h-80 Modify Hanger #AC(D-56). Work perferned and returned to opersting condiJ10n.
55S2 5-10-30 Mcdify Hanger #ACS-353 Work perfor=ed and returned to operating condition.
5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition.
5589 5-3-30 Mcdify Hanger # SIS-193. Work perfor=ed and returned to Operating condition.
l 5590 5-a-80 Mcdify Hanger ! SIS-192. Werk perfer=ed and returned ,to i Operating Octdition.
, - 4- w - ~ w--
Monthly Operati:ts Reper.
May 1980
?sge Hight
!!. MAR. s/CICE (Signifi:an: Safety Related' V t.
- I ate f Jesert::1:n 1 : r ee rre A::.:n 5591 5-5-80 Modify Hanger # SIS-lh9 Work perfc =ed and returned to operating condition.
5592' 5-1-80 Modify Hanger #ACS-3h8 Work perfom ed and returned to operating condition.
5597 5-6-80 Modify Hanger #ACH-301. Work perfc =ed and returned a operating condition.
5598 5-10-80 Modify Hanger #RCS-6 & 10. ~4crk perfc=ed and returned to operating condition.
5599 5-lk-80 Modify Hanger #ACS-113A/125 Work perfer=ed and returned to operating condition.
5601 5 h-80 Modiff Hanger #F4H-56. 'Jork perfomed and returned to Operating condition.
5602 5-3-80 Modiff Hanger #T43-53 *4crk perf0=ed and returned to operating condition.
5603 5-1-80 Mcdify Hanger #NG(D-15). 'Jork perfor=ed snd returned to operating condition.
5609 5-lh-80 Modify Hanger #ACS-299 Jerk perfor=ed and returned to operating condition.
5610 5-12-80 Modify Hanger #ACH h08/ACS-299A. Work perf0=ed and returned to operating condition.
5611 5-lh-80 Modiff Hanger #ACH kC8A. *4crk perfo med and returned to operating 00ndition.
3615 5-6-80 Modify Hanger #ACH-269/ACS-91. Work perfor=ed and --~ ~ ad to operating condition.
5626 5-5-80 Modif/ Hanger # ACE h10. Werk perf0=ed and returned to operating condition.
362- 5-9-80 Modify Hanger #RCS-1. 'icrk perf0=ed and ret =ed to operating condition.
3628 5-12-80 Modify Hanger /ACS-127A. *4crk perfor=ed and returned to Operating 20ndition.
5630 3-1-80 Mcdiff Hsnger #ACH-318. '4crk perfo=ed an d --*"~ ad t o cperating condition.
4 M:::h17 Operations Repcrt May 1980
?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated)
L , e j Ja:e I escri::: n i ;;r ect re A::ict 5631 5-11-80 Mcdiff Hanger #ACS-110A. Work perfor=ed and returned to operating condition.
5650 5-10-80 Modify Hanger # SIS-160. Werk perfo med and returned to operating condition.
5651 5-lk-80 Modiff Hanger #SIH-162. 'Jork perfc =ed and retu~ed to operating condition.
5652 5-7-80 Modif/ Hanger FACH kh0. '4crk perfo med and retuned to operating condition.
5653 5-3-80 Modiff Hanger #ACS-363 *4ork perfc=ed and retuned to operating condition.
3656 5-6-80 Modify Hanger #CH(DW-1). ' Jerk perfo med and retu~ed to operating condition.
5660 5 h-80 Modify Hanger #ACS-10h. Work perfor=ed and retuned .o operating condition.
5667 5-12-80 Modiff Hanger #ACS-97 ' Jerk perfc=ed and retuned to operating condition.
5669 5-7-30 Mcdify Hanger #ACS-300. Work perfor=ed and retu=ed to operating condition. .
5670 5-6-80 Modif/ Hanger #ACS-1103. Work perfomed and retuned to Operating 20ndition.
567h 5-16-80 Modif/ Hanger # SIS-88. Work perfo med and retuned to operating condition.
5675 5-7-80 Mcdify Hanger #ACS-365 Werk pert 0=ed and retuned to operating condition.
5685 5-5-80 Mcdif/ Hanger #CAS h7. Werk perfe=ed and returned to operating condition.
5689 5-15-80 Modify Hanger #S H-172. Werk perfc=ed an:1 returned to Operating condition.
569k 3-7-80 Mcdiff Hanger 15:S-17k/176. Work perf0=ed and retuned to Operating conditien.
5697 5-7-80 Modify Hanger #CAS h6. Work perf0=ed and retu_~ed .to ,
J Operating condition.
i i
4 Menthly Opersti:ns Repor May 1980
?sge Ten
~~. MACC2~iArI (Significan Safe / Related)
A. 2. = late 1 J esert ::::n t ;crrect:cre A:: :n 5T10 5-16-80 Modiff Hanger /S!H-192. ~4crk performed and returned to operating condition.
571h 5-7-80 Modify Hanger #T4H-53 Work perfor=ed and retu=ed to operating condition.
5715 5-7-80 Modify Hanger #F4H-56. '4ork perfomed and returned to opersting condition.
5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition.
5731 5-10-80 Modify Hanger /ACH-309. Work perfomed and retumed to cpersting cendition.
1 57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition.
57k3 5-10-80 Modiff Hanger /ACS-351. Work perfomed and retu =ed to opersting condition.
57bh 5-15-80 Modiff Hanger #SE-5 ~4crk perfe=ed and returned to operating condition.
5751 5-10-80 Modif-f Hanger # MSS-SC. Werk perfer=ed sud retu =ed to operating condition.
5752 5-12-80 Modify Hanger #SH-208. Work perfor=ed and returned to cperating condition.
5765 5-12-80 Modify Hanger #74H-163/?43 h8. '4erk perferned and returned to Operating condition.
5768 5-lh-80 Varicus hangers had replacenent Work perfor=ed and returned to non-class =aterial -ith class operating cendition.
=aterial.
5771 5-15-80 Mcdify Hanger #SE-lhh. Werk perfc=ed sud retuned to operating condition.
l 5778 5-lh.-80 Modiff Hanger 153-152. Work peric=ed and retu=ed to i
. Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92 ~4crk perfc=ed and returned to opersting condition. ;
5813 5-15-80 Modify Hanger #ACS-97. Work perfc=cd and returned 'to Operating condition.
Men hl-/ ^,peraticos Reper.
May 1930
?tge Eleven
- . MA ..z 4/CICE (Signift:an: 3 ate:7 2elste'il
- f. 2. = I : ate I :escri;; ten ! ;Orrective A:::::
5E17 5-16-80 Modify Hanger #ACS-350. Work perfor ed and returned to operating condition.
5931 6-5-80 PC-3A Motor renoved. Replace RC-3A and returned to operating condition.
5933 6-5-80 ac-3C notor re=oved. Replace RC-3C and returned to operating condition.
iI l
.. . . .