ML19323H996: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter::
{{#Wiki_filter::
  .                                        -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY        R. J. Hickle TELEPHONE h02-536 kh13 MONTH      May, 1980 DAY      AVERAGE DAILY POWER LEVEL                            DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net) 1                      0.0                                  17                    0.0 2                      0.0                                  18                    0.0 3                      0.0                                                          0.0 39 4                      0.0                                                          0.0 20 5                      0.0                                  21      _
AVERAGE DAILY UNIT POWER LEVEL
                                                  .
* DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY        R. J. Hickle TELEPHONE h02-536 kh13
                                                                                                                                .
MONTH      May, 1980 DAY      AVERAGE DAILY POWER LEVEL                            DAY        AVERAGE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net) 1                      0.0                                  17                    0.0 2                      0.0                                  18                    0.0 3                      0.0                                                          0.0 39 4                      0.0                                                          0.0 20 5                      0.0                                  21      _
0.0 6                      0.0                                  22                      0.0 7a                      0.0                                                          0.0 23 8                      0.0                                    .4                    0.0 9                      0.0                                  25                      0.0 10                      0.0                                  26                      0.0 11                      0.0                                  27                      0 . 0-l2                      0.0                                  28                      0.0 13                      0.0                                  29                      0.0 34                      0.0                                                          0.0 30 15                      0.0                                  33                      0.0 16                      0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.
0.0 6                      0.0                                  22                      0.0 7a                      0.0                                                          0.0 23 8                      0.0                                    .4                    0.0 9                      0.0                                  25                      0.0 10                      0.0                                  26                      0.0 11                      0.0                                  27                      0 . 0-l2                      0.0                                  28                      0.0 13                      0.0                                  29                      0.0 34                      0.0                                                          0.0 30 15                      0.0                                  33                      0.0 16                      0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.
1
1
                                                                                                                                   )
                                                                                                                                   )
l (9/77)    {
l (9/77)    {
                                                                                                                              -
                                                                                                                                  !
8006170Y N
8006170Y N
                                                                                                                                  !


                                                ..                                                                _                        _____ _ _ _ _ _ _ _ _ _ _ _
        .
'.*
          .
    .                                              .
                                                                                                              .
                                                                                                           ~
                                                                                                           ~
OPERATING DATA REPORT i
OPERATING DATA REPORT i
DOCKET NO. 50-285
DOCKET NO. 50-285 DATE June o. 1980 COMPLETED BY B            J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1-                                            Notes                                  '
'
DATE June o. 1980 COMPLETED BY B            J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1-                                            Notes                                  '
: 1. Unit Name:
: 1. Unit Name:
+
+
: 2. Reporting Period;        hv . 1080
: 2. Reporting Period;        hv . 1080
'
: 3. Licensed Thermal Power (MWt):          1h20 4            4. Nameplate Rating (Gross MWe):          502
: 3. Licensed Thermal Power (MWt):          1h20 4            4. Nameplate Rating (Gross MWe):          502
'
: 5. Design Electrical Rating (Net MWe):    h57
: 5. Design Electrical Rating (Net MWe):    h57
  ,            6. Maximum Dependable Capacity (Gross MWe):          h81
  ,            6. Maximum Dependable Capacity (Gross MWe):          h81
Line 68: Line 50:
,            18. Net Electrical Energy Generated (MWH)                  0.0                      180.935.1              16,868,454.9
,            18. Net Electrical Energy Generated (MWH)                  0.0                      180.935.1              16,868,454.9
: 19. Unit Service Factor                                    0.0                              11.8                        74.9
: 19. Unit Service Factor                                    0.0                              11.8                        74.9
                                                                                                                                                                                '
: 20. Unit Availability Factor                                0.0                              11.8                        74.9
: 20. Unit Availability Factor                                0.0                              11.8                        74.9
: 21. Unit Capacity Factor (Using MDC Net)
: 21. Unit Capacity Factor (Using MDC Net) 0.0                              10.9                        63.4
                .
0.0                              10.9                        63.4
,          22. Unit Capacity Factor (Using DER Net)                    0.0                              10.9                        63.0
,          22. Unit Capacity Factor (Using DER Net)                    0.0                              10.9                        63.0
: 23. Unit Forced Outage Rate                                0.0                                  0.0                        4.5
: 23. Unit Forced Outage Rate                                0.0                                  0.0                        4.5
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
None
None
                                                                                                                                          -
                                                      .    ,                                                                        -
: 25. If Shut Down At End Of Report Period.Esnmated Date of Startup:                  June 7, 1980
: 25. If Shut Down At End Of Report Period.Esnmated Date of Startup:                  June 7, 1980
: 26. Units in Test Status tPrior to Commerci21 Operation):                              Forecast                Achieved l    -
: 26. Units in Test Status tPrior to Commerci21 Operation):                              Forecast                Achieved l    -
i                                  th: 4AL CRITICALITY                                                                        -'
i                                  th: 4AL CRITICALITY                                                                        -'
!                                  INITIA L ELECTRICITY
!                                  INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)
                                                                                                                                                                              '
COMMERCIAL OPER ATION (4/77)
                                                                                                                                  .                                    . , -
                          -                                  .    ..        . . _ . . - , , ,                - - . _.-                                                        .


                                                                                                                                                        '
                                                                                                                                                   + ..
                                                                                                                                                   + ..
!
                                                                                                                                                          ,
UNITSilUTDOWNS AND POWER REDUCTIONS                  DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m
UNITSilUTDOWNS AND POWER REDUCTIONS                  DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m
DATE June 9. 1980 4
DATE June 9. 1980 4
REPORT MONTH May. 1980                    COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413
REPORT MONTH May. 1980                    COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 1
                            ,
1
                                                                ".
                                           =        r.      1.5.
                                           =        r.      1.5.
c h          !0    ?jy          CC CC    j%                            Cause & Corrective No.        Date g
c h          !0    ?jy          CC CC    j%                            Cause & Corrective No.        Date g
E.
E.
g .3            63m          : vent    ;,3 un U g}Uo                      Action to oO        E                  Report a                                  Prevent Recurrence y Di g 6
g .3            63m          : vent    ;,3 un U g}Uo                      Action to oO        E                  Report a                                  Prevent Recurrence y Di g 6
                                                                                                                                                  .
    .
80-01    800118        s    3216.5      c        1        n/A                            Reactor shutdown for annual refueling and maintenance outage.
80-01    800118        s    3216.5      c        1        n/A                            Reactor shutdown for annual refueling and maintenance outage.
,
i 1                    2                                                3                              4 F: Forced            Reason:                                          Method:                          Exhibit G. Instructions S: Scheduled        A. Equipment Failure (Explain)                    1 Manual                        for Preparation of Data B. Maintenance of Test                            2 Manual Scram.                  Entry Sheets for Licensee C Refueling                                      3 Automatic Scram.              Event Report (LER) File (NUREG.
i 1                    2                                                3                              4 F: Forced            Reason:                                          Method:                          Exhibit G. Instructions
'
S: Scheduled        A. Equipment Failure (Explain)                    1 Manual                        for Preparation of Data B. Maintenance of Test                            2 Manual Scram.                  Entry Sheets for Licensee C Refueling                                      3 Automatic Scram.              Event Report (LER) File (NUREG.
D Regulatory Restriction                          4 Other (Explain)              0161)
D Regulatory Restriction                          4 Other (Explain)              0161)
E Operator Training & Ucense Examination F-Administrative                                                              5 G-Operational Error (Explain)                                                      Exhibit I- Sime Source
E Operator Training & Ucense Examination F-Administrative                                                              5 G-Operational Error (Explain)                                                      Exhibit I- Sime Source (9/77)                  Il-Other (Explain)
      -
(9/77)                  Il-Other (Explain)
  ,


,_
  .,.
Rcfueling Infonxttion Fort Calhoun - Unit No.1            -
Rcfueling Infonxttion Fort Calhoun - Unit No.1            -
Report for the month ending May 31, 1980        .
Report for the month ending May 31, 1980        .
                                                                                      .
Scheduled date for next refueling shutdown.                          March 15. 1981
Scheduled date for next refueling shutdown.                          March 15. 1981
                                                                    '
: 1.                                                          -
: 1.                                                          -
: 2. Scheduled date for restart folleaing refueling.                    May 15, 1981
: 2. Scheduled date for restart folleaing refueling.                    May 15, 1981
: 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
: 3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
        ,
: a. If ana.cr is yes, what, in general, will these be?
: a. If ana.cr is yes, what, in general, will these be?
                                                .
                                                                .
: b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload.                                No
: b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload.                                No
           .c.      If no such review has taken place, when is it scheduled?                                                February 1, 1981
           .c.      If no such review has taken place, when is it scheduled?                                                February 1, 1981
: 4.      Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
: 4.      Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
: 5.      Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
: 5.      Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
                                                                  .
: 6. The nu:rbor of fuel assemblies: a) in the core                      133          assemblies b) in the spent fuel pool          197 c) spent fuel pool' storage capacity              483 d) planned spent fuel pool storage capacity              483        .
: 6. The nu:rbor of fuel assemblies: a) in the core                      133          assemblies
: 7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity.                                                  1985 Prepared by                    MA                      Date        June 5, 1980 g
                                                                                                          "
v M          4    e                    ,
b) in the spent fuel pool          197 c) spent fuel pool'
                                                                                                          "
storage capacity              483 d) planned spent fuel pool
                                                                      *                                  "
storage capacity              483        .
: 7. - The projected date of the last refueling that can *m
          '
discharged to the spent fucl pool asst:ning the present licensed capacity.                                                  1985 Prepared by                    MA                      Date        June 5, 1980 g
                                    -
v
                            -
  --
M          4    e                    ,
                                                                                          .          - , . . - - .


_.        ._      . - - _
    ,-
.
  .
. "-
CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS  
CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS  


Line 168: Line 101:
: 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a
: 3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a
                 . s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:
                 . s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:
                                                                                      .


  .
.
Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)
Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)
Operations
Operations
_ Incident                Deficiency
_ Incident                Deficiency OI-973      (ST-FIL-2)    7A-66 Freen Re=cval Efficiency Less than 995.
      -
OI-973      (ST-FIL-2)    7A-66 Freen Re=cval Efficiency Less than 995.
OI-937      (ST-7A h)      7A-6h Flev Rate.
OI-937      (ST-7A h)      7A-6h Flev Rate.
OI-938      (ST-7A k)      7A-66 Flov Rate OI-976      (ST-PL-1)      HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977      (ST-DG-2)      Alar:s found cut  of tolerance; crank case pressure alar =,  fuel oil transfer pu=p #1 lov .
OI-938      (ST-7A k)      7A-66 Flov Rate OI-976      (ST-PL-1)      HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977      (ST-DG-2)      Alar:s found cut  of tolerance; crank case pressure alar =,  fuel oil transfer pu=p #1 lov .
Line 187: Line 115:
1 Mark 3are                    Mark L. Gutier ec                        I John C. 3 ranch              Michael I. K e an Dr. Ronald J. 3runo          Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these        -
1 Mark 3are                    Mark L. Gutier ec                        I John C. 3 ranch              Michael I. K e an Dr. Ronald J. 3runo          Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these        -
empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.
empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.
                                                                                      --
                                    ._.
                                                                    .


_ _
      .
..
    .
Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.
Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.
H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59
H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59
Line 205: Line 126:
: 1) Incorporate secondary water ch mistry reqY re=ents into License conditions.
: 1) Incorporate secondary water ch mistry reqY re=ents into License conditions.
1st'
1st'
                                                                                      ,
                                                                           'I'dtY\\..\@i Approved 3y                    -
                                                                           'I'dtY\\..\@i
;                                                                    jfahager-For:'Calhoun Station i}
                                                                                          '
1 l
,
e u--
Approved 3y                    -
;                                                                    jfahager-For:'Calhoun Station
!
i}
                                                                      '
1
:
!
!
!
l
,
e
                              -
                          .%
u--


__
l 1
l
Menthly Cperations Repcrt May 1980
        -
1 Menthly Cperations Repcrt May 1980
           ?sge Four
           ?sge Four
:"" . MA-.r.s A3CI (Signif10 ant Safety Related)
:"" . MA-.r.s A3CI (Signif10 ant Safety Related)
M. 0
M. 0
* a:e    t                esert :: ten          ;        ;c=ective A:: :n h7k5    5-5-80        Modify ACS-155/161.                    Work perfor=ed, restraint: returnec to operating condition.
* a:e    t                esert :: ten          ;        ;c=ective A:: :n h7k5    5-5-80        Modify ACS-155/161.                    Work perfor=ed, restraint: returnec to operating condition.
h388    5-10-80      Packing leak on HCV-3h8.              Replace packing and returned to
h388    5-10-80      Packing leak on HCV-3h8.              Replace packing and returned to operating condition.
                                                                                                  -
operating condition.
5713    5-12-80      Remote control and indications        Wiring corrected en TB k and failed on HCV-239                    viring changed to reflect prints.
5713    5-12-80      Remote control and indications        Wiring corrected en TB k and failed on HCV-239                    viring changed to reflect prints.
Retu=ed to Normal operation.
Retu=ed to Normal operation.
Line 253: Line 154:
51k6    5-2-80        Modify Hanger ! ACE-327.              Werk perfo med md retun ed to operating condition.
51k6    5-2-80        Modify Hanger ! ACE-327.              Werk perfo med md retun ed to operating condition.
3151    5-11-80      Modify Hanger # SIS ~127A.
3151    5-11-80      Modify Hanger # SIS ~127A.
                                            -
                                                               'Jork perfc med and retum ed ,0c cperating condition, s
                                                               'Jork perfc med and retum ed ,0c
'
cperating condition, s
                        .-            .-          .
_, ,-    7  --
_, ,-    7  --


.
Men:hly Operstiens 2epert May 1980
Men:hly Operstiens 2epert May 1980
               ?._z e ?1 re
               ?._z e ?1 re
Line 282: Line 178:
l 5h60      5-1-80      Modiff Hanger #C3W-3.                *4erk perfc=ed snd retuned to ~
l 5h60      5-1-80      Modiff Hanger #C3W-3.                *4erk perfc=ed snd retuned to ~
f                                                            operating condition.
f                                                            operating condition.
_            __


.
Ment h.1-/ Operstions Repar-May 1980 pige SiX
Ment h.1-/ Operstions Repar-May 1980 pige SiX
               !!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)
               !!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)
Line 297: Line 191:
5536        5 h-30        Modiff Hanger !CH(C-31).            Werk perfc=ed  e-d  ------e  .
5536        5 h-30        Modiff Hanger !CH(C-31).            Werk perfc=ed  e-d  ------e  .
t  .
t  .
                                                                                                    '
Operating 00ndition.
Operating 00ndition.
I
I
            .                _            .__      .
                                                                                          -__ ,


        .
.
Menthly 0;erati::s Re;cr-May 1980 Page Seven
Menthly 0;erati::s Re;cr-May 1980 Page Seven
                   ~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)
                   ~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)
Line 322: Line 211:
5587      5-10-30    Mcdify Hanger #ACH-355                Werk perfor:ed and returned to opersting 00ndition.
5587      5-10-30    Mcdify Hanger #ACH-355                Werk perfor:ed and returned to opersting 00ndition.
5589      5-3-30      Mcdify Hanger # SIS-193.              Work perfor=ed and returned to Operating condition.
5589      5-3-30      Mcdify Hanger # SIS-193.              Work perfor=ed and returned to Operating condition.
  '
l 5590      5-a-80      Mcdify Hanger ! SIS-192.              Werk perfer=ed and returned ,to    i Operating Octdition.
l 5590      5-a-80      Mcdify Hanger ! SIS-192.              Werk perfer=ed and returned ,to    i Operating Octdition.
_    . _ _ _  __
                                                               ,                  -  4-          w - ~ w--
                                                               ,                  -  4-          w - ~ w--


  .
Monthly Operati:ts Reper.
Monthly Operati:ts Reper.
May 1980
May 1980
Line 347: Line 233:
362-      5-9-80      Modify Hanger #RCS-1.              'icrk perf0=ed and ret =ed to operating condition.
362-      5-9-80      Modify Hanger #RCS-1.              'icrk perf0=ed and ret =ed to operating condition.
3628      5-12-80    Modify Hanger /ACS-127A.          *4crk perfor=ed and returned to Operating 20ndition.
3628      5-12-80    Modify Hanger /ACS-127A.          *4crk perfor=ed and returned to Operating 20ndition.
5630      3-1-80      Mcdiff Hsnger #ACH-318.            '4crk perfo=ed an d --*"~ ad t o
5630      3-1-80      Mcdiff Hsnger #ACH-318.            '4crk perfo=ed an d --*"~ ad t o cperating condition.
* cperating condition.
                            -            . - . -


4
4 M:::h17 Operations Repcrt May 1980
.
        .
M:::h17 Operations Repcrt May 1980
               ?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated)
               ?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated)
L    ,  e j  Ja:e    I                escri::: n              i      ;;r ect re A::ict 5631      5-11-80    Mcdiff Hanger #ACS-110A.                Work perfor=ed and returned to operating condition.
L    ,  e j  Ja:e    I                escri::: n              i      ;;r ect re A::ict 5631      5-11-80    Mcdiff Hanger #ACS-110A.                Work perfor=ed and returned to operating condition.
Line 372: Line 253:
569k      3-7-80      Mcdiff Hanger 15:S-17k/176.            Work perf0=ed and retuned to Operating conditien.
569k      3-7-80      Mcdiff Hanger 15:S-17k/176.            Work perf0=ed and retuned to Operating conditien.
5697      5-7-80      Modify Hanger #CAS h6.                  Work perf0=ed and retu_~ed .to  ,
5697      5-7-80      Modify Hanger #CAS h6.                  Work perf0=ed and retu_~ed .to  ,
                                                                                                  '
J                                                    Operating condition.
J                                                    Operating condition.
i
i i
                                                                                                  .
_            _ . . . _
i


            .
    .
4 Menthly Opersti:ns Repor May 1980
4 Menthly Opersti:ns Repor May 1980
                   ?sge Ten
                   ?sge Ten
Line 389: Line 264:
5723      5-9-80    Modify Hanger /RCS-59              Work perfor=ed and retur.:ed to opersting condition.
5723      5-9-80    Modify Hanger /RCS-59              Work perfor=ed and retur.:ed to opersting condition.
5731      5-10-80    Modify Hanger /ACH-309.            Work perfomed and retumed to cpersting cendition.
5731      5-10-80    Modify Hanger /ACH-309.            Work perfomed and retumed to cpersting cendition.
                                                                                                  ,
1 57h2      5-11-80    Modiff Hanger /ACH-363/ SIS-177    Werk perfor=ed and ret'trned to operating condition.
1
                                                                                                  '
57h2      5-11-80    Modiff Hanger /ACH-363/ SIS-177    Werk perfor=ed and ret'trned to operating condition.
57k3      5-10-80    Modiff Hanger /ACS-351.            Work perfomed and retu =ed to opersting condition.
57k3      5-10-80    Modiff Hanger /ACS-351.            Work perfomed and retu =ed to opersting condition.
57bh      5-15-80    Modiff Hanger #SE-5                ~4crk perfe=ed and returned to operating condition.
57bh      5-15-80    Modiff Hanger #SE-5                ~4crk perfe=ed and returned to operating condition.
Line 403: Line 275:
l 5778      5-lh.-80  Modiff Hanger 153-152.              Work peric=ed and retu=ed to    i
l 5778      5-lh.-80  Modiff Hanger 153-152.              Work peric=ed and retu=ed to    i
                                                                 . Operating condition, 5802      5-lh-80    Modiff Esnger /ACH-270/ACS-92      ~4crk perfc=ed and returned to opersting condition.            ;
                                                                 . Operating condition, 5802      5-lh-80    Modiff Esnger /ACH-270/ACS-92      ~4crk perfc=ed and returned to opersting condition.            ;
* 5813      5-15-80    Modify Hanger #ACS-97.              Work perfc=cd and returned 'to Operating condition.
5813      5-15-80    Modify Hanger #ACS-97.              Work perfc=cd and returned 'to Operating condition.
                                            ...-
.


  .
Men hl-/ ^,peraticos Reper.
Men hl-/ ^,peraticos Reper.
May 1930
May 1930
Line 416: Line 285:
5931    6-5-80        PC-3A Motor renoved.                    Replace RC-3A and returned to operating condition.
5931    6-5-80        PC-3A Motor renoved.                    Replace RC-3A and returned to operating condition.
5933    6-5-80        ac-3C notor re=oved.                    Replace RC-3C and returned to operating condition.
5933    6-5-80        ac-3C notor re=oved.                    Replace RC-3C and returned to operating condition.
,
                                                                                                      '
iI l
iI l
                             ..                . . .}}
                             ..                . . .}}

Revision as of 01:25, 1 February 2020

Monthly Operating Rept for May 1980
ML19323H996
Person / Time
Site: Fort Calhoun 
Issue date: 06/09/1980
From: Hickle B
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML19323H995 List:
References
NUDOCS 8006170443
Download: ML19323H996 (15)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fot-t Calheim #1 DATE Jtme 9,1980 COMPLETED BY R. J. Hickle TELEPHONE h02-536 kh13 MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 0.0 39 4 0.0 0.0 20 5 0.0 21 _

0.0 6 0.0 22 0.0 7a 0.0 0.0 23 8 0.0 .4 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0 . 0-l2 0.0 28 0.0 13 0.0 29 0.0 34 0.0 0.0 30 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power levelin M%'e Net for each day in the reporting month. Compute to the nearest whole megawatt.

1

)

l (9/77) {

8006170Y N

~

OPERATING DATA REPORT i

DOCKET NO. 50-285 DATE June o. 1980 COMPLETED BY B J. Hickle TELEPHONE .hD2 'i2d::3413 OPERATING STA TUS Fort Calhoun #1- Notes '

1. Unit Name:

+

2. Reporting Period; hv . 1080
3. Licensed Thermal Power (MWt): 1h20 4 4. Nameplate Rating (Gross MWe): 502
5. Design Electrical Rating (Net MWe): h57

, 6. Maximum Dependable Capacity (Gross MWe): h81

! 7. Maximum Dependabie Capacity (Net MWe): h57

, 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

n/A j N/A

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions.lf Any: N/A 2

This Month Yr. to-Date Cumulative

11. Hour 4 in Reporting Period 744.0 3,547.0 58,584.0 0.0 44,o34 5
12. Number Of Hours Reactor Was Critical 432 9 _
13. Reactor Reserve Shutdown Hours 0.0 0.0 ,

1,309.5

14. Haurs Generator On.Line 0.0 430.5 43,881.6
15. Unit Reserve Shutdown Hours 0.0 0.0 'O.0
16. Gross Thermal Energy Generated (MWH) 0.0 57h.710.0 53.809.760.2 '.
17. Gross Electrical Energy Generated (MWH) 0.0 ,_, 190.604.0 17.850.833.6

, 18. Net Electrical Energy Generated (MWH) 0.0 180.935.1 16,868,454.9

19. Unit Service Factor 0.0 11.8 74.9
20. Unit Availability Factor 0.0 11.8 74.9
21. Unit Capacity Factor (Using MDC Net) 0.0 10.9 63.4

, 22. Unit Capacity Factor (Using DER Net) 0.0 10.9 63.0

23. Unit Forced Outage Rate 0.0 0.0 4.5
24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period.Esnmated Date of Startup: June 7, 1980
26. Units in Test Status tPrior to Commerci21 Operation): Forecast Achieved l -

i th: 4AL CRITICALITY -'

! INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)

+ ..

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNITNAME Fort Calhoun #1 m

DATE June 9. 1980 4

REPORT MONTH May. 1980 COMPLETED BY B. J. Hickle TELEPSIONE 402-536-4413 1

= r. 1.5.

c h !0 ?jy CC CC j% Cause & Corrective No. Date g

E.

g .3 63m  : vent  ;,3 un U g}Uo Action to oO E Report a Prevent Recurrence y Di g 6

80-01 800118 s 3216.5 c 1 n/A Reactor shutdown for annual refueling and maintenance outage.

i 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Sime Source (9/77) Il-Other (Explain)

Rcfueling Infonxttion Fort Calhoun - Unit No.1 -

Report for the month ending May 31, 1980 .

Scheduled date for next refueling shutdown. March 15. 1981

1. -
2. Scheduled date for restart folleaing refueling. May 15, 1981
3. Will refus'ing or resumption of operation thereafter require a technical' specification change or other No lice.se amendment?
a. If ana.cr is yes, what, in general, will these be?
b. If answer is no, has the reload fuel design and core configuration been revicaed by your Plant Safety Review Comittee to deter-mine whether any unrevieaed safety questions are associated with the core reload. No

.c. If no such review has taken place, when is it scheduled? February 1, 1981

4. Scheduled date(s) for subm.itting proposed licensing action and support infor: ration.
5. Inportant licensing considerations associated with refueling, e.g. ; nea or different fuel design or supplier, unrovicwed design or performance analysis nothods, significant changes -in fuel design, nea operating procedures.
6. The nu:rbor of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool' storage capacity 483 d) planned spent fuel pool storage capacity 483 .
7. - The projected date of the last refueling that can *m discharged to the spent fucl pool asst:ning the present licensed capacity. 1985 Prepared by MA Date June 5, 1980 g

v M 4 e ,

CMAHA FU3LIC PCWER DIS"'RICT Fort Calhoun Statien Unit No. 1 May 1980 Monthly Operations Report I. OPEPJ.TICUS

SUMMARY

Ford, Calhoun remained in a cold shutdown condition during the scnth of May..

Preparations and required prerequisites for plant startup were cenpleted during May. -

Reactor coolant pump case coter gasket leaks vere disco'rered to be leak-ing during the cold hydro test and the plant was plc.ced in a ccnfigurstion to work en the reacter coolant pump.

The Operations Department attended Combustien Engineering Si=ulater Training during the =cnth of May. All shifts have ecmpleted the requeli-fication training at the simulator as prescribed in the Fort Calheen Training Progrsm.

Required surreillance tests and operational tests vere completed during May.

A. PERFORM.GCE CHARACTERISTICS lER Number Deficienev 80-007 As directed by "E Bulletin 79-013 the penetration es'le o splices for the containment ventilation fans VA-3A, VA-33, VA-TC and VA-7D lack documentation on LOCA qualificatien. The splices are being reported even though an investigation of =aterial properties of Irrsthene SFT tapa, Irrasil tape, and silicone R""I indicate the splice vould with-stand a LOCA.

3. CHANGES U GPERATING ME""dODS None C. RESULTS OF EURVIILLANCE "ESTS AND USPECTIONS Surveillance tests are required by the Technical Specificatiens Section 3.0 and Appendix 3, vere perfer=ed in accordance with the annual surveillance test se Mdule. Se folleving is a

. s"-='y of the surveillsnee tests which results in Operations Incidents and e,re not reported elsewhere in the repert:

Menthly Operations Report May 1980 Page Two C. RESULTS OF SUR7EII.I.ANCE TESTS AND E! SPEC"ICNS (Continued)

Operations

_ Incident Deficiency OI-973 (ST-FIL-2) 7A-66 Freen Re=cval Efficiency Less than 995.

OI-937 (ST-7A h) 7A-6h Flev Rate.

OI-938 (ST-7A k) 7A-66 Flov Rate OI-976 (ST-PL-1) HIC-101, LT-101?, LRC-101X, LRC-101? Out of Tolerance OI-977 (ST-DG-2) Alar:s found cut of tolerance; crank case pressure alar =, fuel oil transfer pu=p #1 lov .

pressure alar =, fuel oil transfer pu.p high pressure alar =, Jacket water te=perature cold, i==ersion heater te=perature centrol switch.

D. CHANG 3, TESTS AND uu124EN"S CARRIED CUT EnCUT COMMISSION AFFROVAL F oceduce Descrittien CI-968 (ST-NDWC-1) TIC-7333 Out of Tolerance.

OI-967 (ST-C:~1) TR-196, FR-1395, 73-1398 Cut of Tolerance l l

DCR 77-108 Dual Volts /HZ, ST7 Relay /Cc=pleted as designed.

l E. RESULTS CF LEAK' RATE TESTS l Local leak rates continued to be performed in May whil the plant was shut devn for the 1980 Refueling Cutage. A cc=plete report vill be forthec=ing at the end of the outage. No abnormal leaks were detected in May. j l

F. C"-1ANGES ET PLANT CPERAT2TG STAFF I The folleving individuals vere added to the plant staff:

1 Mark 3are Mark L. Gutier ec I John C. 3 ranch Michael I. K e an Dr. Ronald J. 3runo Jeffrey A. Spilker John A. Orahota Tnese persennel vill be attached to the Fer Calhcun Station Technical Grcup as Shift Technical Adviscrs per the recuire=ents of NURIG-0573. Prior to being placed en a shift rotation these -

empicyees vill enter'a cc=prehensive training prog s= vnich is tailcred to accc=plish the necessary training vithin the tine frs=e expressed in the regulator / rd de.

Monthly Operations Report May 19S0 Page Three G. TRAI'i!'IG Training for the = cath of May included =cre radiation protection training for additional personnel required to supper: plant maintenance. Operations continued to attend the simulator course at Ccmbitstion Ergineering fcr requalification of their :TRC R0/SRO license.

H. CHAliGIS, TESTS AND EXPERIME:CS REQUIRING .TJC'2.AR . REGULATCRY COE!!SSION AUTHORITATION ?URSUA:IT TO 1CCFR50.59

1. Changes to Facility Operating License DPR-ho Amendment Nc,. h6, dated May 27, 1980. The amendment revises the License as follows:

a) Modifies Appendix A Technical Specifications to:

l

1) Add two shock suppressors to listing of those l required to be tested.
2) Permit limited testing of shock suppressors during power operation.

b) Modifies Appendix B Technical Specifications to:

1) Incorporate secondary water ch mistry reqY re=ents into License conditions.

1st'

'I'dtY\\..\@i Approved 3y -

jfahager-For
'Calhoun Station i}

1 l

e u--

l 1

Menthly Cperations Repcrt May 1980

?sge Four

"" . MA-.r.s A3CI (Signif10 ant Safety Related)

M. 0

  • a:e t esert :: ten  ; ;c=ective A:: :n h7k5 5-5-80 Modify ACS-155/161. Work perfor=ed, restraint: returnec to operating condition.

h388 5-10-80 Packing leak on HCV-3h8. Replace packing and returned to operating condition.

5713 5-12-80 Remote control and indications Wiring corrected en TB k and failed on HCV-239 viring changed to reflect prints.

Retu=ed to Normal operation.

581h 5-15-80 AB-1 (K-1) Relay failed - RPS Removed, repaired, and cleaned A3 Matrix. Belay contacts. Returned to operating condition.

5911 5-27-80  ?" one square foot section of P" as required - Satisfactory. 4 A & B RC pumps.

5913 5-23-80 Repair to =eet ASME XI requirements Repaired as require?, - satisfacto:y.

- cover-to-casing studs for RC pt=ps.

5932 5-30-80 RC-3B Motor Removed. Replace RC-3B :otor - returned to operating condition.

kTL5 5-5-80 Modify Hanger #ACS-155/161. Work perfor=ed and retu=ed,to operating ccndition.

5062 5-6-80 Modify Hanger # SIS-188. Werk performed and raturned to operating ecndition.

5112 5-8-80 Modify Hanger #T4H-166. Work perfor=ed and returned to operating condition.

5116 5-6-80 Modify Hanger /SISL119 ,

Werk perfomed and returned to operating ccndition.

5118 5-7-80 Modify Hanger /ACH hh7. Work perfc=ed and returned to operating conditicn.

51h3 5-1-80 Mcdify Hanger VRCH-19 Work perfer:ed and retu ned te operating conditicn.

51k6 5-2-80 Modify Hanger ! ACE-327. Werk perfo med md retun ed to operating condition.

3151 5-11-80 Modify Hanger # SIS ~127A.

'Jork perfc med and retum ed ,0c cperating condition, s

_, ,- 7 --

Men:hly Operstiens 2epert May 1980

?._z e ?1 re

~~. MA L .;_;riCI (31gnifi: ant safety Related)

t. 2. e Cate i :escri cien i :c- ee:1. e Ac:::=

5152 5-2-80 Modiff Hanger #S*H-199 Work perfc =ed and retuned to operating ccndition.

5162 5-5-80 Medief Hanger #RCS-53. Werk perfo =ed and returned to operating condition.

5225 5-1-80 Modiff Hanger #ACH h13/275 'Jork perfor=ed and retun ed to operating conditicn.

5228 5-2-80 Modiff Hanger #RCS-30A. Work perfc med and returned to operating ccndition.

5237 5-(40 Modify Hanger #RCH-53 Werk perfor=ed and returned to operating ccndition.

5258 5-3-80 Modif/ Hanger #ACH-335 Work perfer ed and retu ned to operating cen:iiticn.

53h5 5-2-80 Modify Hanger #SIH-lh1. Work perfor:ed and returned to operating ccnditicn.

53b6 5-6-80 Modif7 Hanger #SIH-210. '4crk perfor=ed and retuned to opersting ccndition.

53h? 5-8-80 Medief Hanger #SIH-212/271. ' Jerk perfersed and retu ned to operating condition.

5388 5 h-80 Medit/ Hanser #ACH-291/ACS-108. Work perfomed d - +urned to Operating cendition.

5h21 5-9-80 Modif7 Hanger #MSH-72. Work perfo med and retuned to operating cendition.

5h22 5-9-80 Medief Hanger #MSH-75 Werk perfc = ed and returned to operating cendition.

Sh23 5-9-80 Modiff Hanger #MSH-73 Work perfc =ed and returned to Operating cer.dition.

5hh0 5-7-80 Modif/ Hanger #MSH-71. Work perfor=ed and returned to operating conditicn.

5k5i 3-2-80 Medie/ Hanger # SIS-132. Work perfc=ed -e --- ned to operating ccnditicn.

l 5h60 5-1-80 Modiff Hanger #C3W-3. *4erk perfc=ed snd retuned to ~

f operating condition.

Ment h.1-/ Operstions Repar-May 1980 pige SiX

!!. mal"'!I'IA:iC2 (Signift:snt Saf ety Reisted)

4. 2.
  • I  : ate 1 :esertp: ten i  ;:rree:1re A::::n e Sh66 5-3-80 Modify Hanger #ACH h06/ACS-291, Work performed and returned to opersting condition, SkS9 5-3-80 Modify Hanger /WD(A-1k). Work perfo=ed and returned to opersting condition.

5h99 5-10-80 Medity Hanger #MSH-76, verk perfor=ed and returned to opersting condition.

5507 5-10-30 Modiff Hanger #ACS-350. Work perfor=ed and returned to opersting condition, 5508 5-1-80 Modify Hanger # SIS-119 Work perfor=ed and returned to operating condition, 5509 5-11-30 Modi?/ Hanger #SIH-205, 'Jork perfer=ed and retumed to opersting conditien, 5511 5-5-30 ModiP/ Hanger #ACS-31hA. Work perf =ed and retuned to opersting ecndition.

5515 5-3-30 Modify Hanger #SIH-209 Work perfomed and retu=ed to operating condition, 5513 5-7-30 Modiff Hanger #SIH-208. Werk perfc=ed snd retu ned to opersting condition, 5527 5-1-30 Modify Hanger #ACH-309 Work perf =ed and retu=ed to opersting conditi:n, 5530 5-3-30 Modiff Hanger # SIS-lho. Werk perfomed snd retuned to Operating condition.

5531 5-1-30 Modify Hanger # MSS-10. Work perfor:ed and retuned to opersting condition.

5533 5-2-30 Modiff Hanger 1AC(A-13E). '4crk perf:rmed a-d --+umed to opersting condition, 553h 5 h-80 Modiff Hanger !CH(I-12), Werk perfor=ed sad retu n ed to opersting condition.

5533 5-1-30 Mcdify Hanger #SI(0-5). Work perf =ed and returned to opersning ocndition.

5536 5 h-30 Modiff Hanger !CH(C-31). Werk perfc=ed e-d ------e .

t .

Operating 00ndition.

I

Menthly 0;erati::s Re;cr-May 1980 Page Seven

~. MAL.i._Gl!CI (31gnifi: ant 3afe / 2 elated)

M.  : . I  ; ate i Jescri;;;:n a  : rree :ve A::::n i 5537 5-3-80 Modify Hanger #SI(E h). Work perfor=ed ani returned to operating condition.

5538 5-2-30 Modify Hanger #CH(E-3h). Work perfor=ed and returned to opersting condition.

55ho 5-10-80 Modify Hanger #ACH-356. Work perfer=ed and returned to opersting ccndition.

55h1 5-6-80 Modify Hanger # MSS-9A. Work perferned and returned to opersting condition.

55L2 5-1-30 Mcdify Hanger # MSS-13. Work performed and returned to operating 00ndition.

55h5 5-7-80 Mcdify Hanger #SIH-211. Work perforned and returned to operating condition.

55k6 5-9-80 Modify Hanger #MSH-Th. Werk perferned and returned to operating condition.

5558 5-3-30 Modify Hanger VAC(A-26). Work perfer=ed and returned to operating condition.

5559 5-3-30 Modify Hanger # MSS-9 Work perfer=ed and returned to operating ccndition.

5561 5-1k-80 Modify Hanger #SIH-131. Wert performed and returned to Operating 00ndition.

5563 5-6-30 Moddfy Hanger #ECS-58. Work perfor=ed and returned to operating 00ndition.

556b 5 h-80 Modify Hanger #AC(D-56). Work perferned and returned to opersting condiJ10n.

55S2 5-10-30 Mcdify Hanger #ACS-353 Work perfor=ed and returned to operating condition.

5587 5-10-30 Mcdify Hanger #ACH-355 Werk perfor:ed and returned to opersting 00ndition.

5589 5-3-30 Mcdify Hanger # SIS-193. Work perfor=ed and returned to Operating condition.

l 5590 5-a-80 Mcdify Hanger ! SIS-192. Werk perfer=ed and returned ,to i Operating Octdition.

, - 4- w - ~ w--

Monthly Operati:ts Reper.

May 1980

?sge Hight

!!. MAR. s/CICE (Signifi:an: Safety Related' V t.

  • I ate f Jesert::1:n 1  : r ee rre A::.:n 5591 5-5-80 Modify Hanger # SIS-lh9 Work perfc =ed and returned to operating condition.

5592' 5-1-80 Modify Hanger #ACS-3h8 Work perfom ed and returned to operating condition.

5597 5-6-80 Modify Hanger #ACH-301. Work perfc =ed and returned a operating condition.

5598 5-10-80 Modify Hanger #RCS-6 & 10. ~4crk perfc=ed and returned to operating condition.

5599 5-lk-80 Modify Hanger #ACS-113A/125 Work perfer=ed and returned to operating condition.

5601 5 h-80 Modiff Hanger #F4H-56. 'Jork perfomed and returned to Operating condition.

5602 5-3-80 Modiff Hanger #T43-53 *4crk perf0=ed and returned to operating condition.

5603 5-1-80 Mcdify Hanger #NG(D-15). 'Jork perfor=ed snd returned to operating condition.

5609 5-lh-80 Modify Hanger #ACS-299 Jerk perfor=ed and returned to operating condition.

5610 5-12-80 Modify Hanger #ACH h08/ACS-299A. Work perf0=ed and returned to operating condition.

5611 5-lh-80 Modiff Hanger #ACH kC8A. *4crk perfo med and returned to operating 00ndition.

3615 5-6-80 Modify Hanger #ACH-269/ACS-91. Work perfor=ed and --~ ~ ad to operating condition.

5626 5-5-80 Modif/ Hanger # ACE h10. Werk perf0=ed and returned to operating condition.

362- 5-9-80 Modify Hanger #RCS-1. 'icrk perf0=ed and ret =ed to operating condition.

3628 5-12-80 Modify Hanger /ACS-127A. *4crk perfor=ed and returned to Operating 20ndition.

5630 3-1-80 Mcdiff Hsnger #ACH-318. '4crk perfo=ed an d --*"~ ad t o cperating condition.

4 M:::h17 Operations Repcrt May 1980

?ege 31ne II. MA-...w A3C2 (Signift: ant Safe:/ 2 elated)

L , e j Ja:e I escri::: n i  ;;r ect re A::ict 5631 5-11-80 Mcdiff Hanger #ACS-110A. Work perfor=ed and returned to operating condition.

5650 5-10-80 Modify Hanger # SIS-160. Werk perfo med and returned to operating condition.

5651 5-lk-80 Modiff Hanger #SIH-162. 'Jork perfc =ed and retu~ed to operating condition.

5652 5-7-80 Modif/ Hanger FACH kh0. '4crk perfo med and retuned to operating condition.

5653 5-3-80 Modiff Hanger #ACS-363 *4ork perfc=ed and retuned to operating condition.

3656 5-6-80 Modify Hanger #CH(DW-1). ' Jerk perfo med and retu~ed to operating condition.

5660 5 h-80 Modify Hanger #ACS-10h. Work perfor=ed and retuned .o operating condition.

5667 5-12-80 Modiff Hanger #ACS-97 ' Jerk perfc=ed and retuned to operating condition.

5669 5-7-30 Mcdify Hanger #ACS-300. Work perfor=ed and retu=ed to operating condition. .

5670 5-6-80 Modif/ Hanger #ACS-1103. Work perfomed and retuned to Operating 20ndition.

567h 5-16-80 Modif/ Hanger # SIS-88. Work perfo med and retuned to operating condition.

5675 5-7-80 Mcdify Hanger #ACS-365 Werk pert 0=ed and retuned to operating condition.

5685 5-5-80 Mcdif/ Hanger #CAS h7. Werk perfe=ed and returned to operating condition.

5689 5-15-80 Modify Hanger #S H-172. Werk perfc=ed an:1 returned to Operating condition.

569k 3-7-80 Mcdiff Hanger 15:S-17k/176. Work perf0=ed and retuned to Operating conditien.

5697 5-7-80 Modify Hanger #CAS h6. Work perf0=ed and retu_~ed .to ,

J Operating condition.

i i

4 Menthly Opersti:ns Repor May 1980

?sge Ten

~~. MACC2~iArI (Significan Safe / Related)

A. 2. = late 1 J esert ::::n t ;crrect:cre A:: :n 5T10 5-16-80 Modiff Hanger /S!H-192. ~4crk performed and returned to operating condition.

571h 5-7-80 Modify Hanger #T4H-53 Work perfor=ed and retu=ed to operating condition.

5715 5-7-80 Modify Hanger #F4H-56. '4ork perfomed and returned to opersting condition.

5723 5-9-80 Modify Hanger /RCS-59 Work perfor=ed and retur.:ed to opersting condition.

5731 5-10-80 Modify Hanger /ACH-309. Work perfomed and retumed to cpersting cendition.

1 57h2 5-11-80 Modiff Hanger /ACH-363/ SIS-177 Werk perfor=ed and ret'trned to operating condition.

57k3 5-10-80 Modiff Hanger /ACS-351. Work perfomed and retu =ed to opersting condition.

57bh 5-15-80 Modiff Hanger #SE-5 ~4crk perfe=ed and returned to operating condition.

5751 5-10-80 Modif-f Hanger # MSS-SC. Werk perfer=ed sud retu =ed to operating condition.

5752 5-12-80 Modify Hanger #SH-208. Work perfor=ed and returned to cperating condition.

5765 5-12-80 Modify Hanger #74H-163/?43 h8. '4erk perferned and returned to Operating condition.

5768 5-lh-80 Varicus hangers had replacenent Work perfor=ed and returned to non-class =aterial -ith class operating cendition.

=aterial.

5771 5-15-80 Mcdify Hanger #SE-lhh. Werk perfc=ed sud retuned to operating condition.

l 5778 5-lh.-80 Modiff Hanger 153-152. Work peric=ed and retu=ed to i

. Operating condition, 5802 5-lh-80 Modiff Esnger /ACH-270/ACS-92 ~4crk perfc=ed and returned to opersting condition.  ;

5813 5-15-80 Modify Hanger #ACS-97. Work perfc=cd and returned 'to Operating condition.

Men hl-/ ^,peraticos Reper.

May 1930

?tge Eleven

. MA ..z 4/CICE (Signift:an: 3 ate:7 2elste'il
f. 2. = I  : ate I :escri;; ten  ! ;Orrective A:::::

5E17 5-16-80 Modify Hanger #ACS-350. Work perfor ed and returned to operating condition.

5931 6-5-80 PC-3A Motor renoved. Replace RC-3A and returned to operating condition.

5933 6-5-80 ac-3C notor re=oved. Replace RC-3C and returned to operating condition.

iI l

.. . . .