00 cs          continued reactor operation is permissible during the next thirty days. If both channels are inoperable and indication cannot be restored in six hours, an orderly shutdown shall be initiated and  the in the    reactor 18 following  shall be in a hot shutdown condition in six hours and a cold shutdown condition hours.
00 cs          continued reactor operation is permissible during the next thirty days. If both channels are inoperable and indication cannot be restored in six hours, an orderly shutdown shall be initiated and  the in the    reactor 18 following  shall be in a hot shutdown condition in six hours and a cold shutdown condition hours.
d D
d D
pa
pa 49a
                                      .
49a
____


                                                                                                                            -
                                                                                                                                                                      .
                                                                                                                                                                  ,
V                                                                                        d            ,,
V                                                                                        d            ,,
TABLE 4.2.6                                                          ,
TABLE 4.2.6                                                          ,
                                                                                                                                                                  ..
CALIBRATION FRFI)UENCIES POST-ACCIDFRr INSTRlMWTATION Parameter                      Calibration                    Instmment Clicck Drywell Atmosphere Temperature        every 6 months                    once cach day lirywell and Torus Pressure          eve y 6 months                    once each day Torus Ifater level                    every 6 months                    once cach shift Torus Ifater Temperature              every 6 months                    once each day itcactor Pressure                    every 6 months                    once cach day Iteactor Vessel ifater Level          every 6 months'                    once cach day Control Itod' Position                (note 5)                          once cach day Neutron Monitor                      Same as reactor                    once.each day protection systems                                    ,
                                                                                                                                                            '
CALIBRATION FRFI)UENCIES POST-ACCIDFRr INSTRlMWTATION Parameter                      Calibration                    Instmment Clicck Drywell Atmosphere Temperature        every 6 months                    once cach day lirywell and Torus Pressure          eve y 6 months                    once each day
                                                                                                                                        ,
Torus Ifater level                    every 6 months                    once cach shift Torus Ifater Temperature              every 6 months                    once each day
                                                                                                                                                                    '
itcactor Pressure                    every 6 months                    once cach day
                                                                                                                                                                        '
Iteactor Vessel ifater Level          every 6 months'                    once cach day Control Itod' Position                (note 5)                          once cach day Neutron Monitor                      Same as reactor                    once.each day protection systems                                    ,
Torus Air Temperature                every 6 months                    once cach day Safety /Felief Valve Position        every refueling outage (Note 9)    once each day r
Torus Air Temperature                every 6 months                    once cach day Safety /Felief Valve Position        every refueling outage (Note 9)    once each day r
(a Functional Test to be performed quarterly)
(a Functional Test to be performed quarterly)
Safety Valve Position                every refueling outage (Note 9)    once each day (a Functional Test to be performed quarterly)
Safety Valve Position                every refueling outage (Note 9)    once each day (a Functional Test to be performed quarterly) t 60 0
                                                                                          ,                  -
                                                                                            ,
t 60 0
_ _ . _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ - _ _ - _ - - _ - -_


_. .      _.          -    _        . _ -      __      _ , _ . . _ _ _            _          _        -_    _    ,
aja                                                        l;,'
aja                                                        l;,'
                                                                                                                                            '      '
                                                                                                                  .
i6f                -
i6f                -
                                                                                                                                                            ,
i kb $hh,                                        '
i
                  *                          '
                                                                      ,,
kb $hh,                                        '
                                                                                                                                                   .. . l      .
                                                                                                                                                   .. . l      .
TABLE 4.2 NOTES
TABLE 4.2 NOTES
: 1. Initially once per month; thereaf ter, a longer interval as determined by test results on this type of instrumentation.                  *.'''*1        *-  ..          -
: 1. Initially once per month; thereaf ter, a longer interval as determined by test results on this type of instrumentation.                  *.'''*1        *-  ..          -
    .
                                                                                                                                              .
: 2. During each refueling outage, simulated autom.itic actuation which opens all pilot valves shall be performed such that cach trip system logic can be verified independent of its redundant counterpart.
: 2. During each refueling outage, simulated autom.itic actuation which opens all pilot valves shall be performed such that cach trip system logic can be verified independent of its redundant counterpart.
                                                                                                                                                       ~
                                                                                                                                                       ~
Line 72: Line 45:
  ;                                                                                                                                .                              .
  ;                                                                                                                                .                              .
I    li's 4.        This inctrumentation is excepted from functional test definition.                The' functional test will consist a
I    li's 4.        This inctrumentation is excepted from functional test definition.                The' functional test will consist a
                ,
of injecting a simulated electrical signal int:o the measurement channel.
of injecting a simulated electrical signal int:o the measurement channel.
                          *
                                                                                                                                                -
l g , g..                                              *
l g , g..                                              *
: 5. Check control rod position indication while performing the surveillance requirement of section 3.3.
: 5. Check control rod position indication while performing the surveillance requirement of section 3.3.
Line 81: Line 51:
: 6. Functional. tests, calibrations an'd instrument checks are not required when these instruments are not to be operable or tripped. Functional tests shall be performed before cach startup with s required 4
: 6. Functional. tests, calibrations an'd instrument checks are not required when these instruments are not to be operable or tripped. Functional tests shall be performed before cach startup with s required 4
frequency not to exceed once per week. Calibration shall be performed prior to or during each otartup or                            ,
frequency not to exceed once per week. Calibration shall be performed prior to or during each otartup or                            ,
-
'
controlled shutdowns wit h a required f requency not to exceed once per week. Instrument checks shall be performed at 1 cast once per day during those periods' when instruments are required to be operable.                                  .
controlled shutdowns wit h a required f requency not to exceed once per week. Instrument checks shall be performed at 1 cast once per day during those periods' when instruments are required to be operable.                                  .
I              7. This instrumentatior. is excepted from the functional test definitions and shall be calibrated using                              ,
I              7. This instrumentatior. is excepted from the functional test definitions and shall be calibrated using                              ,
1                    simulated cicetrical signals once every three contho.
1                    simulated cicetrical signals once every three contho.
                                                                                    '
,                                                                                                                                                              .
~
~
: 8. Functional tests and calibrations are not required when systems are not required to be operable.
: 8. Functional tests and calibrations are not required when systems are not required to be operable.
't
't
             .9. The thermocouples associated with Safety / Relief Valves and Safety Valve Position, that may be used for backup position indication, shall be verified to be operable every operating tycle.
             .9. The thermocouples associated with Safety / Relief Valves and Safety Valve Position, that may be used for backup position indication, shall be verified to be operable every operating tycle.
s
s 61 0
                                                                              ,
: 5. The plant IIcalth physicist shall meet or exceed the qualifications of Regulatory Guide 1.8, i
61 0
Revision 1 (September 1975).
 
                                                                                                                    .
                                                                                                                ..  .
                                                                                                                        .
                                                                                                                        '
: 5. The plant IIcalth physicist shall meet or exceed the qualifications of Regulatory Guide 1.8,
                                                                                                                        .
i Revision 1 (September 1975).
: 6.    .The Shif t Technical Advisor shall have a bachelor's degree or equivalcat in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.
: 6.    .The Shif t Technical Advisor shall have a bachelor's degree or equivalcat in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.
E. A Fire trigade of at least 5 members shall be maintained onsite at all times. # This excludes 2 r: embers of the minimum shif t crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.
E. A Fire trigade of at least 5 members shall be maintained onsite at all times. # This excludes 2 r: embers of the minimum shif t crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.
9
9
                                                                                                                          %
,  // Fire Brigade composition may be less than the minimum requirements for a period of tima not to exceed 2 hours in order to accommodate unexpected absence of Fire Brigade members provided inunediate action is taken to restore the Fire Brigade to within the minimum requirements.
,  // Fire Brigade composition may be less than the minimum requirements for a period of tima not to exceed 2 hours in order to accommodate unexpected absence of Fire Brigade members provided inunediate action is taken to restore the Fire Brigade to within the minimum requirements.
190-a
190-a


                                                                                                        . . . .
                                                                                                                .
:
VYNPS TABLE 6.1.1 Vermont Yankee staff positions that shall be filled by personnel holding Senior Operator and Operator licenses are indicated in the following table:
VYNPS TABLE 6.1.1 Vermont Yankee staff positions that shall be filled by personnel holding Senior Operator and Operator licenses are indicated in the following table:
Title License Operations Supervisor                                Senior Operator Shift Supervisor Senior Operator Supervisory Control Room Operator                    Operator Control Room Operator                                Operator Conditions MINIMtM SHIFT CREW PERSONNEL & LICENSE                          Normal REQUIREMENTS Plant          Cold Operation              S ta rtup    Shutdown Shift Supervisor (1)                    (1)
Title License Operations Supervisor                                Senior Operator Shift Supervisor Senior Operator Supervisory Control Room Operator                    Operator Control Room Operator                                Operator Conditions MINIMtM SHIFT CREW PERSONNEL & LICENSE                          Normal REQUIREMENTS Plant          Cold Operation              S ta rtup    Shutdown Shift Supervisor (1)                    (1)
Supervisory Control Room Operator
Supervisory Control Room Operator (1)                    (1)          (1)
                                                                                      -
(1)                    (1)          (1)
Control Room Operator                          (1)
Control Room Operator                          (1)
Auxiliary Operator                                                      (1)          (1)
Auxiliary Operator                                                      (1)          (1)

Revision as of 15:36, 31 January 2020

Proposed Change 91 to Tech Specs in Response to TMI Lessons Learned Category a Items.Revises Tables 3.2.6 & 4.2.6 to Incorporate Requirements for Monitoring Instrumentation & Table 6.1.1 Re Shift Technical Advisor
ML19332A835
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/12/1980
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML19332A834 List:
References
RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 8009180452
Download: ML19332A835 (6)


Text

, .,

a '

TABLE 3.2.6 NOTES Note 1 - From and af ter the date that one of these parameters is not indicated in the control room, continued reactor operation is permissible during the next seven days. If reduced to one indication of a parameter operation is permissible for 30 days.

00 CD Note 2 - Control rod position and neutron monitor instruments are considered to be redundant to each O other.

f$ Note 3 - From and after the date that this parameter is reduced to one indication in the control room.

00 cs continued reactor operation is permissible during the next thirty days. If both channels are inoperable and indication cannot be restored in six hours, an orderly shutdown shall be initiated and the in the reactor 18 following shall be in a hot shutdown condition in six hours and a cold shutdown condition hours.

d D

pa 49a

V d ,,

TABLE 4.2.6 ,

CALIBRATION FRFI)UENCIES POST-ACCIDFRr INSTRlMWTATION Parameter Calibration Instmment Clicck Drywell Atmosphere Temperature every 6 months once cach day lirywell and Torus Pressure eve y 6 months once each day Torus Ifater level every 6 months once cach shift Torus Ifater Temperature every 6 months once each day itcactor Pressure every 6 months once cach day Iteactor Vessel ifater Level every 6 months' once cach day Control Itod' Position (note 5) once cach day Neutron Monitor Same as reactor once.each day protection systems ,

Torus Air Temperature every 6 months once cach day Safety /Felief Valve Position every refueling outage (Note 9) once each day r

(a Functional Test to be performed quarterly)

Safety Valve Position every refueling outage (Note 9) once each day (a Functional Test to be performed quarterly) t 60 0

aja l;,'

i6f -

i kb $hh, '

.. . l .

TABLE 4.2 NOTES

1. Initially once per month; thereaf ter, a longer interval as determined by test results on this type of instrumentation. *.*1 *- .. -
2. During each refueling outage, simulated autom.itic actuation which opens all pilot valves shall be performed such that cach trip system logic can be verified independent of its redundant counterpart.

~

. 3. Trip system loci c calibration shall include only time delay relays and timers necessary for proper l , functioning of the trip system.
. .

I li's 4. This inctrumentation is excepted from functional test definition. The' functional test will consist a

of injecting a simulated electrical signal int:o the measurement channel.

l g , g.. *

5. Check control rod position indication while performing the surveillance requirement of section 3.3.

t....

6. Functional. tests, calibrations an'd instrument checks are not required when these instruments are not to be operable or tripped. Functional tests shall be performed before cach startup with s required 4

frequency not to exceed once per week. Calibration shall be performed prior to or during each otartup or ,

controlled shutdowns wit h a required f requency not to exceed once per week. Instrument checks shall be performed at 1 cast once per day during those periods' when instruments are required to be operable. .

I 7. This instrumentatior. is excepted from the functional test definitions and shall be calibrated using ,

1 simulated cicetrical signals once every three contho.

~

8. Functional tests and calibrations are not required when systems are not required to be operable.

't

.9. The thermocouples associated with Safety / Relief Valves and Safety Valve Position, that may be used for backup position indication, shall be verified to be operable every operating tycle.

s 61 0

5. The plant IIcalth physicist shall meet or exceed the qualifications of Regulatory Guide 1.8, i

Revision 1 (September 1975).

6. .The Shif t Technical Advisor shall have a bachelor's degree or equivalcat in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

E. A Fire trigade of at least 5 members shall be maintained onsite at all times. # This excludes 2 r: embers of the minimum shif t crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.

9

, // Fire Brigade composition may be less than the minimum requirements for a period of tima not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of Fire Brigade members provided inunediate action is taken to restore the Fire Brigade to within the minimum requirements.

190-a

VYNPS TABLE 6.1.1 Vermont Yankee staff positions that shall be filled by personnel holding Senior Operator and Operator licenses are indicated in the following table:

Title License Operations Supervisor Senior Operator Shift Supervisor Senior Operator Supervisory Control Room Operator Operator Control Room Operator Operator Conditions MINIMtM SHIFT CREW PERSONNEL & LICENSE Normal REQUIREMENTS Plant Cold Operation S ta rtup Shutdown Shift Supervisor (1) (1)

Supervisory Control Room Operator (1) (1) (1)

Control Room Operator (1)

Auxiliary Operator (1) (1)

(2) (2) (1)

Shift Technical Advisor (1) (1) -

f Senior Operators License (1)

Operators License (1) (1)

(2) (2) (1) 193