ML19345H441: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
:-
    . . .
                     /
                     /
[i GO gCommonwealth
[i GO gCommonwealth Edison
                        -
Edison
                           ) Ona First National Ptiza. Chicago. Illinois Address Reply to: Post Office Box 767
                           ) Ona First National Ptiza. Chicago. Illinois Address Reply to: Post Office Box 767
                     \  y Chicago, Illinois 60690 a1Nfk3.Y,%
                     \  y Chicago, Illinois 60690 a1Nfk3.Y,%
Line 46: Line 42:


l
l
    .. .
_                                                                          .
                                             -2 In addition an evaluation has been made and modifications completed to assure that containment isolation capability is not lost, see Reference 1, Enclosure 5, Position 4.
                                             -2 In addition an evaluation has been made and modifications completed to assure that containment isolation capability is not lost, see Reference 1, Enclosure 5, Position 4.
It is judged that the interim position established for LaSalle County Station, and the commitment to demonstrate operability as described in the NRC Staff Guidelines provides a technically defensible basis for resolving outstanaing Issue ll.c.
It is judged that the interim position established for LaSalle County Station, and the commitment to demonstrate operability as described in the NRC Staff Guidelines provides a technically defensible basis for resolving outstanaing Issue ll.c.
Should you have any further questions in this regard, please direct them to this office.
Should you have any further questions in this regard, please direct them to this office.
Very truly yours, L. O. DelGeorge Nuclear Licensing Administrator cc:  NRC Resident Inspector - LSCS 2005N l
Very truly yours, L. O. DelGeorge Nuclear Licensing Administrator cc:  NRC Resident Inspector - LSCS 2005N l
,
l
l
                                           ,}}
                                           ,}}

Revision as of 03:21, 31 January 2020

Submits Supplemental Response to NUREG-0519 Re Unresolved Issue Ii.C of Task II.E.4.2 of NUREG-0737 Re Containment Isolation Dependability for Containment Purge Vent Valve Operation.Interim Position to Be Satisfied at Fuel Loading
ML19345H441
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/13/1981
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TASK-2.E.4.2, TASK-TM NUDOCS 8105200300
Download: ML19345H441 (2)


Text

.

/

[i GO gCommonwealth Edison

) Ona First National Ptiza. Chicago. Illinois Address Reply to: Post Office Box 767

\ y Chicago, Illinois 60690 a1Nfk3.Y,%

May 13, 1981 t#J 191981d Mr. A. Schwencer, Chief Licensing Branch 2 n

s wa-4 Qf Division of Licensing g 3 ~/

U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Containmemt Purge / Vent Valve Operation Supplemental Response to NUREG-0519 Unresolved Issue II.c (Task II.E.4.2)

NRC Docket Nos. 50-373/374 Reference (1): L. O. DelGeorge letter to A. Schwencer dated May 4, 1981

Dear Mr. Schwencer:

The purpose of this submittal is to clarify the Commonwealth Eaison position relative to item II.E.4.2(6) of NUREG-0737 (Containment Isolation Dependability) as applied to LaSalle County Station Units 1 and 2. Specifically, at fuel loading LaSalle County shall satisfy the " Interim Position" in Section II.E.4.2 of NUREG-0737, i.e. the DOE Interim Position dated October 23, 1979.

I

1. Whenever the containment integrity is required, emphasis will be placed on operating the containment in a passive mode as much as possible ana on limiting all purging and venting times to as low as achievable. To justify venting or purging, there shall be an established need to improve working conaitions to perform a safety-relatea surveillance or safety-related maintenance proceaure; inter alia, deinerting.
2. All containment purge and vent isolation valves greater than 3 inches in diameter shall be closed whenever the reactor is not in cold shutdown or refueling mode until such time as it is shown that these valves conform to the " Guidelines for Demonstration of Operability of Purge and Vent Valves" contained in Table II.E.4.2-2 of Sectin 22.2 of NUREG-0519.

k On an interim basis, the operability of the LaSalle County vavles is assured by limiting the valve to be no more than 500 open, see Reference 1, Enclosure 5,

" Siti " 6-8105200300: ###'

l

. 6 eIb

l

-2 In addition an evaluation has been made and modifications completed to assure that containment isolation capability is not lost, see Reference 1, Enclosure 5, Position 4.

It is judged that the interim position established for LaSalle County Station, and the commitment to demonstrate operability as described in the NRC Staff Guidelines provides a technically defensible basis for resolving outstanaing Issue ll.c.

Should you have any further questions in this regard, please direct them to this office.

Very truly yours, L. O. DelGeorge Nuclear Licensing Administrator cc: NRC Resident Inspector - LSCS 2005N l