ML18139B662: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML18139B663 | | number = ML18139B663 | ||
| issue date = 12/31/1981 | | issue date = 12/31/1981 | ||
| title = | | title = Cycle 5 Core Performance Rept. | ||
| author name = Hendrixson E, Leberstein J, Lozito E | | author name = Hendrixson E, Leberstein J, Lozito E | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
Latest revision as of 10:48, 25 January 2020
Date released: 12/10/2018 | Download: ML18139B662 |
---|---|
ML18139B663 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 12/31/1981 |
From: | Hendrixson E, Leberstein J, Lozito E VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
References | |
Download: ML18139B663 (52) | |
ML18139B661 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 12/21/1981 |
From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | DENTON H R, VARGA S A Office of Nuclear Reactor Regulation |
References | |
Download: ML18139B661 (1) | |