ML19209A532: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19209A537
| number = ML19209A537
| issue date = 09/20/1979
| issue date = 09/20/1979
| title = Forwards LER 79-043/01T-0
| title = LER 79-043/01T-0:on 790906,two of Four Bolts on Hanger 32-GE-S41 Failed During Insp Program.Caused by Improper Installation of Bolt Anchor Shells.Defective Bolts Have Been Removed & Replaced by Wedge Type Anchor Bolts
| author name = Colney M
| author name = Colney M
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC

Latest revision as of 07:51, 24 January 2020

Forwards LER 79-043/01T-0
Date released: 08/11/2019 Download: ML19209A532


LER 79-043/01T-0:on 790906,two of Four Bolts on Hanger 32-GE-S41 Failed During Insp Program.Caused by Improper Installation of Bolt Anchor Shells.Defective Bolts Have Been Removed & Replaced by Wedge Type Anchor Bolts
ML19209A537
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/20/1979
From: Colney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209A537 (1)
Forwards LER 79-043/01T-0
ML19209A531
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/20/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209A531 (2)