ML19249D819: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19249D825 | | number = ML19249D825 | ||
| issue date = 09/14/1979 | | issue date = 09/14/1979 | ||
| title = | | title = LER 79-082/03L-0:on 790822,pinhole Leak Found in Makeup Pump Discharge Drain Line.Caused by Component Failure Resulting from Cyclic Vibration Fatigue.Drain Line Renewed & Tested Satisfactorily | ||
| author name = Cooper J | | author name = Cooper J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. |
Latest revision as of 21:09, 23 January 2020
Date released: 09/20/2019 | Download: ML19249D819 |
---|---|
ML19249D825 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 09/14/1979 |
From: | Cooper J FLORIDA POWER CORP. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19249D825 (2) | |
ML19249D818 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 09/19/1979 |
From: | Stewart W FLORIDA POWER CORP. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19249D818 (1) | |