ML19249D819: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19249D825
| number = ML19249D825
| issue date = 09/14/1979
| issue date = 09/14/1979
| title = Forwards LER 79-082/03L-0
| title = LER 79-082/03L-0:on 790822,pinhole Leak Found in Makeup Pump Discharge Drain Line.Caused by Component Failure Resulting from Cyclic Vibration Fatigue.Drain Line Renewed & Tested Satisfactorily
| author name = Cooper J
| author name = Cooper J
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 21:09, 23 January 2020

Forwards LER 79-082/03L-0
Date released: 09/20/2019 Download: ML19249D819


LER 79-082/03L-0:on 790822,pinhole Leak Found in Makeup Pump Discharge Drain Line.Caused by Component Failure Resulting from Cyclic Vibration Fatigue.Drain Line Renewed & Tested Satisfactorily
ML19249D825
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/14/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249D825 (2)
Forwards LER 79-082/03L-0
ML19249D818
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/19/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249D818 (1)