ML19250B996: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19250C000
| number = ML19250C000
| issue date = 10/30/1979
| issue date = 10/30/1979
| title = Forwards LER 79-097/03L-0
| title = LER 79-097/03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced
| author name = Eldred D
| author name = Eldred D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 19:32, 23 January 2020

Forwards LER 79-097/03L-0
Date released: 09/21/2019 Download: ML19250B996


LER 79-097/03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced
ML19250C000
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From: Eldred D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19250C000 (2)
Forwards LER 79-097/03L-0
ML19250B995
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19250B995 (1)