ML19256G130: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19256G138 | | number = ML19256G138 | ||
| issue date = 12/21/1979 | | issue date = 12/21/1979 | ||
| title = | | title = Proposed Tech Spec Page 15.2.3-2 Reflecting Mod to Tech Spec Change Request 60.Provides Addl Operating Margin Between Proposed Primary Sys Pressure & Low Pressurizer Reactor Trip Setpoint | ||
| author name = | | author name = | ||
| author affiliation = WISCONSIN ELECTRIC POWER CO. | | author affiliation = WISCONSIN ELECTRIC POWER CO. |
Latest revision as of 17:11, 23 January 2020
Date released: 09/27/2019 | Download: ML19256G130 |
---|---|
ML19256G138 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/21/1979 |
From: | WISCONSIN ELECTRIC POWER CO. |
To: | |
References | |
Download: ML19256G138 (1) | |
ML19256G129 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/21/1979 |
From: | Burstein S WISCONSIN ELECTRIC POWER CO. |
To: | DENTON H R Office of Nuclear Reactor Regulation |
References | |
Download: ML19256G129 (3) | |