ML19257D862: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257D865
| number = ML19257D865
| issue date = 01/30/1980
| issue date = 01/30/1980
| title = Forwards LER 80-005/03L-0
| title = LER 80-005/03L-0:on 800105,during Normal Operation,Found Isolation Valve for Pressure Switch 2-E11-PS-N010D Shut. Cause Unknown.Counselled Personnel on Necessity to Follow Procedures to Ensure Proper Instrumentation Svc
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 15:39, 23 January 2020

Forwards LER 80-005/03L-0
Date released: 09/28/2019 Download: ML19257D862


LER 80-005/03L-0:on 800105,during Normal Operation,Found Isolation Valve for Pressure Switch 2-E11-PS-N010D Shut. Cause Unknown.Counselled Personnel on Necessity to Follow Procedures to Ensure Proper Instrumentation Svc
ML19257D865
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/30/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D865 (2)
Forwards LER 80-005/03L-0
ML19257D861
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/30/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D861 (1)