ML19261E400: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19261E407
| number = ML19261E407
| issue date = 07/03/1979
| issue date = 07/03/1979
| title = Forwards LER 79-023/03X-1
| title = LER 79-023/03X-1 on 790429:control Rod 10-07 Had No Indication at Notch 47.Caused by Switch Grounded to Prototypic Inlet Piping Probe Case.Switch Wrapped in Fiberglass Tape & Returned to Svc
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 12:43, 23 January 2020

Forwards LER 79-023/03X-1
Date released: 10/02/2019 Download: ML19261E400


LER 79-023/03X-1 on 790429:control Rod 10-07 Had No Indication at Notch 47.Caused by Switch Grounded to Prototypic Inlet Piping Probe Case.Switch Wrapped in Fiberglass Tape & Returned to Svc
ML19261E407
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/03/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261E407 (1)
Forwards LER 79-023/03X-1
ML19261E399
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/03/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261E399 (1)