ML19263C973: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19263C979
| number = ML19263C979
| issue date = 03/16/1979
| issue date = 03/16/1979
| title = Forwards LER 79-004/03L-0
| title = LER 79-004/03L-0 on 790214:during Routine Calibr of Torus Level Transmitter Lt 16-19-38A,instrument Could Not Be Calibr to Limits Specified.Caused by Buildup of Rust & Crud in Transmitter Capsule Cavity.Transmitter Was Replaced
| author name = Conway W
| author name = Conway W
| author affiliation = VERMONT YANKEE NUCLEAR POWER CORP.
| author affiliation = VERMONT YANKEE NUCLEAR POWER CORP.

Latest revision as of 11:04, 23 January 2020

Forwards LER 79-004/03L-0
Date released: 10/04/2019 Download: ML19263C973


LER 79-004/03L-0 on 790214:during Routine Calibr of Torus Level Transmitter Lt 16-19-38A,instrument Could Not Be Calibr to Limits Specified.Caused by Buildup of Rust & Crud in Transmitter Capsule Cavity.Transmitter Was Replaced
ML19263C979
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/16/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19263C979 (2)
Forwards LER 79-004/03L-0
ML19263C972
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/16/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19263C972 (1)