ML19270G034: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19270G039 | | number = ML19270G039 | ||
| issue date = 05/25/1979 | | issue date = 05/25/1979 | ||
| title = | | title = LER 79-016/03L-0 on 790520:while Inserting Group 5 Control Element Assemblies,Cea 36 Dropped to Bottom of Core.Caused by Spike in 15 Volt Power Supply.Design Mod to Be Installed During Next Refueling Outage | ||
| author name = Davis S, Miernicki M | | author name = Davis S, Miernicki M | ||
| author affiliation = BALTIMORE GAS & ELECTRIC CO. | | author affiliation = BALTIMORE GAS & ELECTRIC CO. |
Latest revision as of 09:07, 23 January 2020
Date released: 10/11/2019 | Download: ML19270G034 |
---|---|
ML19270G039 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 05/25/1979 |
From: | Davis S, Miernicki M BALTIMORE GAS & ELECTRIC CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19270G039 (1) | |
ML19270G033 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 05/25/1979 |
From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
To: | GRIER B H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
Download: ML19270G033 (1) | |