ML19274E697: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19274E707
| number = ML19274E707
| issue date = 04/10/1979
| issue date = 04/10/1979
| title = Forwards LERs 79-015/01T-0 & 79-016/03L-0
| title = LER 79-016/03L-0 on 790325:loss of Sys Pressure B1F Sequencer Failed to Meet Time Requirements in Test.Agastat Timer Setpoint Drifted Below Setpoint Required for Test. Timer Adjusted;Test Redone
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 21: Line 21:
| number = ML19274E699
| number = ML19274E699
| issue date = 04/10/1979
| issue date = 04/10/1979
| title = Forwards LERs 79-015/01T-0 & 79-016/03L-0
| title = LER 79-015/01T-0 on 790327:during Inservice Insp,Linear Svc Indications Found on ECCS Line to Loops 1 & 2 Cold Legs & Loop 3 Hot Leg.Caused During Handling.Two Corrective Actions Proposed:Cut Out & Replace or Grind Out
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 07:49, 23 January 2020

Forwards LERs 79-015/01T-0 & 79-016/03L-0
Date released: 10/15/2019 Download: ML19274E697


LER 79-016/03L-0 on 790325:loss of Sys Pressure B1F Sequencer Failed to Meet Time Requirements in Test.Agastat Timer Setpoint Drifted Below Setpoint Required for Test. Timer Adjusted;Test Redone
ML19274E707
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/10/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E707 (1)
LER 79-015/01T-0 on 790327:during Inservice Insp,Linear Svc Indications Found on ECCS Line to Loops 1 & 2 Cold Legs & Loop 3 Hot Leg.Caused During Handling.Two Corrective Actions Proposed:Cut Out & Replace or Grind Out
ML19274E699
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/10/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E699 (3)
Forwards LERs 79-015/01T-0 & 79-016/03L-0
ML19274E696
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/10/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E696 (1)