ML19290B738: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19290B743
| number = ML19290B743
| issue date = 11/26/1979
| issue date = 11/26/1979
| title = Forwards Followup Rept to RO-79-3
| title = Followup Rept to RO-79-3:on 791116,during Prestartup,Shield Water Level Float Switch Assembly Failed to Initiate Protective Trip Signal.Caused by Gradual Buildup of Corrosion Products in Internal Mechanism of Microswitch
| author name =  
| author name =  
| author affiliation = MEMPHIS STATE UNIV., MEMPHIS, TN
| author affiliation = MEMPHIS STATE UNIV., MEMPHIS, TN

Latest revision as of 03:23, 23 January 2020

Forwards Followup Rept to RO-79-3
Date released: 10/31/2019 Download: ML19290B738


Followup Rept to RO-79-3:on 791116,during Prestartup,Shield Water Level Float Switch Assembly Failed to Initiate Protective Trip Signal.Caused by Gradual Buildup of Corrosion Products in Internal Mechanism of Microswitch
ML19290B743
Person / Time
Site: 05000538
Issue date: 11/26/1979
From:
MEMPHIS STATE UNIV., MEMPHIS, TN
To:
References
Download: ML19290B743 (6)
Forwards Followup Rept to RO-79-3
ML19290B737
Person / Time
Site: 05000538
Issue date: 11/26/1979
From: David Jones
MEMPHIS STATE UNIV., MEMPHIS, TN
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290B737 (1)