ML19347B094: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19347B095
| number = ML19347B095
| issue date = 09/26/1980
| issue date = 09/26/1980
| title = Forwards LER 80-067/03L-0
| title = LER 80-067/03L-0:on 800829,while in Mode 5,main Steam Isolation Bypass Valve MS101A Failed.Caused by Failed Solenoid Valve Operator SV101-1.Solenoid Replaced
| author name = Isley T
| author name = Isley T
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 00:17, 17 January 2020

Forwards LER 80-067/03L-0
Date released: 12/27/2019 Download: ML19347B094


LER 80-067/03L-0:on 800829,while in Mode 5,main Steam Isolation Bypass Valve MS101A Failed.Caused by Failed Solenoid Valve Operator SV101-1.Solenoid Replaced
ML19347B095
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1980
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19347B095 (2)
Forwards LER 80-067/03L-0
ML19347B093
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/29/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19347B093 (1)