{{#Wiki_filter:TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.6 Containment System (Continued) | {{#Wiki_filter:TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.6 Containment System (Continued) | ||
: c. DELETED d. The containment isolation valves VA-280 and VA-289 shall be locked closed. Opening of these valves intermittently under administrative control is not allowed.e. The containment purge isolation valves will be locked closed unless the reactor is in a cold or refueling shutdown condition. | : c. DELETED | ||
(2) Internal Pressure The internal pressure shall not exceed 3 psig (except for containment leak rate tests).2.6 -Page 2 Amendment No. 68,139,151,188 250 TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIESFOR EQUIPMENT TESTS Test Frequency 17. DELETED 18. Shutdown Cooling 1. Verify required shutdown cooling loops are OPERABLE and one shutdown cooling loop is IN OPERATION. | : d. The containment isolation valves VA-280 and VA-289 shall be locked closed. Opening of these valves intermittently under administrative control is not allowed. | ||
: 2. Verify correct breaker alignment and indicated | : e. The containment purge isolation valves will be locked closed unless the reactor is in a cold or refueling shutdown condition. | ||
(2) Internal Pressure The internal pressure shall not exceed 3 psig (except for containment leak rate tests). | |||
2.6 - Page 2 Amendment No. 68,139,151,188 250 | |||
TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIESFOR EQUIPMENT TESTS Test Frequency | |||
: 17. DELETED | |||
: 18. Shutdown Cooling 1. Verify required shutdown cooling loops are S (when shutdown cooling is required by TS 2.8). | |||
OPERABLE and one shutdown cooling loop is IN OPERATION. | |||
: 2. Verify correct breaker alignment and indicated W (when shutdown cooling is required by TS 2.8). | |||
power is available to the required shutdown cooling pump that is not IN OPERATION. | |||
312 - Page 12 - No. 438,1.69,188, 246 250 Page 12Amendment}} | |||
Revision as of 08:58, 23 November 2019
| ML070610273 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/06/2007 |
| From: | Wang A NRC/NRR/ADRO/DORL/LPLIV |
| To: | Ridenoure R Omaha Public Power District |
| Wang A, NRR/DORL/LPL4, 301-415-1445 | |
| Shared Package | |
| ML070610267 | List: |
| References | |
| TAC MD3854 | |
| Download: ML070610273 (2) | |
Text
TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.6 Containment System (Continued)
- c. DELETED
- d. The containment isolation valves VA-280 and VA-289 shall be locked closed. Opening of these valves intermittently under administrative control is not allowed.
- e. The containment purge isolation valves will be locked closed unless the reactor is in a cold or refueling shutdown condition.
(2) Internal Pressure The internal pressure shall not exceed 3 psig (except for containment leak rate tests).
2.6 - Page 2 Amendment No. 68,139,151,188 250
TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIESFOR EQUIPMENT TESTS Test Frequency
- 17. DELETED
- 18. Shutdown Cooling 1. Verify required shutdown cooling loops are S (when shutdown cooling is required by TS 2.8).
OPERABLE and one shutdown cooling loop is IN OPERATION.
- 2. Verify correct breaker alignment and indicated W (when shutdown cooling is required by TS 2.8).
power is available to the required shutdown cooling pump that is not IN OPERATION.
312 - Page 12 - No. 438,1.69,188, 246 250 Page 12Amendment