ML071230129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:JSOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company A. Edward Scherer Manager of Nuclear Regulatory Affairs April 27, 2007 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555  
{{#Wiki_filter:A. Edward Scherer JSOUTHERN   EDISON    CALIFORNIA An EDISON INTERNATIONAL Company Manager of Nuclear Regulatory Affairs April 27, 2007 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Docket Nos. 50-206, 50-361 and 50-362 Annual Radioactive Effluent Release Report -2006 San Onofre Nuclear Generating Station, Units 1, 2, and 3  
Docket Nos. 50-206, 50-361 and 50-362 Annual Radioactive Effluent Release Report - 2006 San Onofre Nuclear Generating Station, Units 1, 2, and 3


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with 10 CFR 50.36(a), Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.4, and Units 2 and 3 TS Section 5.7.1.3, Southern California Edison (SCE) is providing the Annual Radioactive Effluent Release Report (ARERR) for the San Onofre Nuclear Generating Station, Units 1, 2, and 3. The period of the report is January 1, 2006 through December 31, 2006.Unit 1 Permanently Defueled TS Section D6.14.2.3 and Units 2 and 3 TS Section 5.5.2.1.1(c) require revisions made to the Offsite Dose Calculation Manuals (ODCMs)for this reporting period to be submitted with the ARERR. Revisions 24 and 25 to Unit 1 and Revisions 41 and 42 to Units 2/3 ODCMs were issued during the 2006 ARERR reporting period. These ODCM revisions are included with this submittal.
 
If you require additional information, please contact Mr. Clay E. Williams at (949) 368-6707.Sincerely, P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575
In accordance with 10 CFR 50.36(a), Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.4, and Units 2 and 3 TS Section 5.7.1.3, Southern California Edison (SCE) is providing the Annual Radioactive Effluent Release Report (ARERR) for the San Onofre Nuclear Generating Station, Units 1, 2, and 3. The period of the report is January 1, 2006 through December 31, 2006.
,4cotj Document Control Desk-2-April 27, 2007 Enclosure 1: Annual Radioactive Effluent Release Report Enclosure 2: ODCM Unit 1, Revision 24 Enclosure 3: ODCM Unit 1, Revision 25 Enclosure 4: ODCM Units 2 and 3, Revision 41 Enclosure 5: ODCM Units 2 and 3, Revision 42 cc: B. S. Mallett, NRC Regional Administrator, Region IV D. B. Spitzberg, NRC Region IV, San Onofre Unit 1 N. Kalyanam, NRC Project Manager, SONGS Units 2 and 3 J. C. Shepherd, NRC Project Manager, SONGS Unit 1 C. C. Osterholtz, NRC Senior Resident Inspector, SONGS Units 2 and 3 S. Y. Hsu, California Department of Health Services}}
Unit 1 Permanently Defueled TS Section D6.14.2.3 and Units 2 and 3 TS Section 5.5.2.1.1(c) require revisions made to the Offsite Dose Calculation Manuals (ODCMs) for this reporting period to be submitted with the ARERR. Revisions 24 and 25 to Unit 1 and Revisions 41 and 42 to Units 2/3 ODCMs were issued during the 2006 ARERR reporting period. These ODCM revisions are included with this submittal.
If you require additional information, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575                                                                             ,4cotj
 
Document Control Desk                                 April 27, 2007 : Annual   Radioactive Effluent Release Report : ODCM   Unit 1, Revision 24 : ODCM   Unit 1, Revision 25 : ODCM   Units 2 and 3, Revision 41 : ODCM   Units 2 and 3, Revision 42 cc:     B. S. Mallett, NRC Regional Administrator, Region IV D. B. Spitzberg, NRC Region IV, San Onofre Unit 1 N. Kalyanam, NRC Project Manager, SONGS Units 2 and 3 J. C. Shepherd, NRC Project Manager, SONGS Unit 1 C. C. Osterholtz, NRC Senior Resident Inspector, SONGS Units 2 and 3 S. Y. Hsu, California Department of Health Services}}

Revision as of 06:43, 23 November 2019

Transmittal of Annual Radioactive Effluent Release Report for 2006 & Revisions to Offsite Dose Calculation Manuals
ML071230129
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/27/2007
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML071230129 (2)


Text

A. Edward Scherer JSOUTHERN EDISON CALIFORNIA An EDISON INTERNATIONAL Company Manager of Nuclear Regulatory Affairs April 27, 2007 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Annual Radioactive Effluent Release Report - 2006 San Onofre Nuclear Generating Station, Units 1, 2, and 3

Dear Sir or Madam:

In accordance with 10 CFR 50.36(a), Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.4, and Units 2 and 3 TS Section 5.7.1.3, Southern California Edison (SCE) is providing the Annual Radioactive Effluent Release Report (ARERR) for the San Onofre Nuclear Generating Station, Units 1, 2, and 3. The period of the report is January 1, 2006 through December 31, 2006.

Unit 1 Permanently Defueled TS Section D6.14.2.3 and Units 2 and 3 TS Section 5.5.2.1.1(c) require revisions made to the Offsite Dose Calculation Manuals (ODCMs) for this reporting period to be submitted with the ARERR. Revisions 24 and 25 to Unit 1 and Revisions 41 and 42 to Units 2/3 ODCMs were issued during the 2006 ARERR reporting period. These ODCM revisions are included with this submittal.

If you require additional information, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575 ,4cotj

Document Control Desk April 27, 2007 : Annual Radioactive Effluent Release Report : ODCM Unit 1, Revision 24 : ODCM Unit 1, Revision 25 : ODCM Units 2 and 3, Revision 41 : ODCM Units 2 and 3, Revision 42 cc: B. S. Mallett, NRC Regional Administrator, Region IV D. B. Spitzberg, NRC Region IV, San Onofre Unit 1 N. Kalyanam, NRC Project Manager, SONGS Units 2 and 3 J. C. Shepherd, NRC Project Manager, SONGS Unit 1 C. C. Osterholtz, NRC Senior Resident Inspector, SONGS Units 2 and 3 S. Y. Hsu, California Department of Health Services