{{#Wiki_filter:June 5, 2008  
{{#Wiki_filter:UNITED STATES
 
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Kevin T. Walsh, Vice President   of Operations Waterford 3 Entergy Operations, Inc. 17265 River Road  
                                                      R E GI ON I V
Killona, LA 70057-3093  
                                          612 EAST LAMAR BLVD , SU I TE 400
  SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000382/2008004) AND  
                                          AR LI N GTON , TEXAS 76011-4125
REQUEST FOR INFORMATION  
                                                June 5, 2008
Dear Mr. Walsh:  
Kevin T. Walsh, Vice President
From July 7 - 18, 2008, Reactor Inspectors from NRC's Region IV office will perform the  
  of Operations
baseline inspection of changes, tests, experiments, and permanent plant modifications at Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications.Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review  
Waterford 3
upon arrival. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Entergy Operations, Inc.
We have discussed the schedule for these inspection activities with your staff and understand  
17265 River Road
that our regulatory contact for this inspection will be Mr. Bob Murillo of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Sam Graves at (817) 860-8102 (Samuel.Graves@nrc.gov).  
Killona, LA 70057-3093
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
SUBJECT:       WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
Entergy Operations, Inc.
                INSPECTION (NRC INSPECTION REPORT 05000382/2008004) AND
- 2 -In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                REQUEST FOR INFORMATION
      Sincerely,  /RA/ 
Dear Mr. Walsh:
      William B. Jones, Chief      Engineering Branch 1      Division of Reactor Safety
From July 7 - 18, 2008, Reactor Inspectors from NRCs Region IV office will perform the
Dockets:  50-382 Licenses:  NPF-38
baseline inspection of changes, tests, experiments, and permanent plant modifications at
Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.17,
Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Bob Murillo of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector Sam Graves at (817) 860-8102 (Samuel.Graves@nrc.gov).


Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document Request
Entergy Operations, Inc.                        -2-
cc: w/enclosure Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                                /RA/
                                              William B. Jones, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Dockets: 50-382
Licenses: NPF-38
Enclosure:
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document
Request
cc: w/enclosure
Senior Vice President
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Senior Vice President and
  Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Operations Support
Entergy Services, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety
  and Licensing
Entergy Services, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Site Vice President
Waterford Steam Electric Station, Unit 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751


Senior Vice President and    Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995
Entergy Operations, Inc.               -3-
Jackson, MS  39286-1995
Director
Vice President, Operations Support Entergy Services, Inc. P.O. Box 31995
Nuclear Safety Assurance
Jackson, MS  39286-1995
Entergy Operations, Inc.
Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc. P.O. Box 31995 Jackson, MS  39286-1995
17265 River Road
Killona, LA 70057-0751
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70825-1697
Richard Penrod, Senior Environmental
  Scientist, State Liaison Officer
Office of Environmental Services
Northwestern State University
Russell Hall, Room 201
Natchitoches, LA 71497
Parish President Council
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601
Louisiana Department of Environmental
Quality Radiological Emergency Planning
and Response Division
P.O. Box 4312
Baton Rouge, LA 70821-4312


Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. 17265 River Road
Entergy Operations, Inc.             -4-
Killona, LA 70057-0751 
Louisiana Department of Environmental
Entergy Operations, Inc.
  Quality
- 3 - Director Nuclear Safety Assurance Entergy Operations, Inc.
Office of Environmental Compliance
17265 River Road Killona, LA 70057-0751
P.O. Box 4312
General Manager, Plant Operations Waterford 3 SES
Baton Rouge, LA 70821-4312
Entergy Operations, Inc. 17265 River Road Killona, LA  70057-0751
Lisa R. Hammond, Chief
Manager, Licensing Entergy Operations, Inc. 17265 River Road
Technological Hazards Branch
Killona, LA  70057-3093
National Preparedness Division
Chairman Louisiana Public Service Commission P.O. Box 91154
FEMA Region VI
Baton Rouge, LA  70825-1697
800 N. Loop 288
Richard Penrod, Senior Environmental    Scientist, State Liaison Officer Office of Environmental Services
Denton, TX 76209
Northwestern State University  Russell Hall, Room 201 Natchitoches, LA  71497
Parish President Council
St. Charles Parish P.O. Box 302 Hahnville, LA  70057
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601
Louisiana Department of Environmental Quality Radiological Emergency Planning  and Response Division
P.O. Box 4312 Baton Rouge, LA 70821-4312
 
 
Entergy Operations, Inc.
- 4 -Louisiana Department of Environmental    Quality  Office of Environmental Compliance P.O. Box 4312  
Baton Rouge, LA 70821-4312  
Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division  
FEMA Region VI 800 N. Loop 288 Denton, TX 76209
Entergy Operations, Inc.
- 5 - Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ray.Azua@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  Only inspection reports to the following: DRS STA (Dale.Powers@nrc.gov) J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov) ROPreports
WAT Site Secretary (Ann.Youngs@nrc.gov)   
   
  SUNSI Review Completed:    ADAMS:  Yes  No            Initials:    Publicly Available        Non-Publicly Available        Sensitive    Non-Sensitive
S:\DRS\REPORTS\WAT2008003lt-stg.doc  ML RI:EB1 RI:EB1 RI:EB1 C:EB1  STGraves SMakor BHenderson WJones  /RA/ /RA/ /RA/ /RA/  06/5/08 06/5/08 06/5/08 06/5/08  OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax 
  - 1 - Enclosure
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Inspection Dates:  July 7, 2008, - July 18, 2008


Inspection Procedures: IP 71111.17 "Evaluation of Changes, Tests, or Experiments and      Permanent Plant Modifications"
Entergy Operations, Inc.                       -5-
Inspectors:   S. Graves, Reactor Inspector, Lead Inspector
Electronic distribution by RIV:
    S. Makor, Reactor Inspector    B. Henderson, Reactor Inspector
Regional Administrator (Elmo.Collins@nrc.gov)
  Information Requested for the In-Office Preparation Week
DRP Director (Dwight.Chamberlain@nrc.gov)
  The following information should be sent to the Region IV office in hard copy or electronic
DRS Director (Roy.Caniano@nrc.gov)
format (ims.certrec.com preferred), in care of S. Graves, by June 16, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
DRS Deputy Director (Troy.Pruett@nrc.gov)
* A list with descriptions, of all 50.59 screenings performed since June, 2005, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
Senior Resident Inspector (Ray.Azua@nrc.gov)
* A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from June, 2005, to the present.  Note: Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
* Waterford Steam Electric Station, Unit 3 procedure for conducting 10 CFR 50.59 screenings and evaluations.  
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
* A list with descriptions of all Corrective Action documents related to 10 CFR 50.59 activities, including screenings and evaluations from June, 2005, to the present.  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
* A list with descriptions of all permanent plant modifications dating from June, 2005. Include sufficient detail to enable the inspector to determine the significance of each modification.  
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
Only inspection reports to the following:
   - 2 - Enclosure
DRS STA (Dale.Powers@nrc.gov)
* Waterford Steam Electric Station, Unit 3 procedure for implementing and controlling permanent plant modifications.
J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)
* A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since June, 2005. Include sufficient detail to enable the inspector to determine the significance of each modification.
ROPreports
   Inspector Contact Information:
WAT Site Secretary (Ann.Youngs@nrc.gov)
SUNSI Review Completed:                ADAMS: 6 Yes        No    Initials:
6 Publicly Available        Non-Publicly Available    Sensitive   6 Non-Sensitive
S:\DRS\REPORTS\WAT2008003lt-stg.doc                      ML
RI:EB1                RI:EB1            RI:EB1          C:EB1
STGraves              SMakor            BHenderson      WJones
/RA/                  /RA/              /RA/            /RA/
06/5/08              06/5/08            06/5/08          06/5/08
OFFICIAL RECORD COPY                                T=Telephone  E=E-mail   F=Fax


S. Graves  S. Makor   B. Henderson Reactor Inspector Reactor Inspector Reactor Inspector 817-860-8102   817-276-6507   817-276-6569 Samuel.Graves@nrc.gov
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Shiattin.Makor@nrc.gov
Inspection Dates:                July 7, 2008, - July 18, 2008
Breck.Henderson@nrc.gov     Mailing Address: US NRC Region IV Attn: S. Graves 612 East Lamar Blvd., Suite 400 Arlington, TX 76011
Inspection Procedures:            IP 71111.17 Evaluation of Changes, Tests, or Experiments and
                                  Permanent Plant Modifications
Inspectors:                      S. Graves, Reactor Inspector, Lead Inspector
                                  S. Makor, Reactor Inspector
                                  B. Henderson, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com preferred), in care of S. Graves, by June 16, 2008, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. We ask that the
specific items requested be available and ready for review on the first day of inspection. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
    *    A list with descriptions, of all 50.59 screenings performed since June, 2005, which did
        not result in an evaluation. Note: Description of screenings should be brief, but of
        sufficient detail so that inspectors can determine the significance of the issue.
    *    A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in
        an application for license amendment to NRC from June, 2005, to the present. Note:
        Description of evaluations should be brief, but of sufficient detail so that inspectors can
        determine the significance of the issue.
    *    Waterford Steam Electric Station, Unit 3 procedure for conducting 10 CFR 50.59
        screenings and evaluations.
    *    A list with descriptions of all Corrective Action documents related to 10 CFR 50.59
        activities, including screenings and evaluations from June, 2005, to the present.
    *    A list with descriptions of all permanent plant modifications dating from June, 2005.
        Include sufficient detail to enable the inspector to determine the significance of each
        modification.
                                                    -1-                                    Enclosure
 
    *  Waterford Steam Electric Station, Unit 3 procedure for implementing and controlling
        permanent plant modifications.
    *   A list with descriptions of all Corrective Action documents related to your permanent
        plant modification program and its implementation since June, 2005. Include sufficient
        detail to enable the inspector to determine the significance of each modification.
Inspector Contact Information:
S. Graves                      S. Makor                     B. Henderson
Reactor Inspector               Reactor Inspector             Reactor Inspector
817-860-8102                   817-276-6507                 817-276-6569
Samuel.Graves@nrc.gov           Shiattin.Makor@nrc.gov       Breck.Henderson@nrc.gov
Mailing Address:
US NRC Region IV
Attn: S. Graves
612 East Lamar Blvd., Suite 400
Arlington, TX 76011
                                                  -2-                                  Enclosure
}}
}}

Revision as of 16:01, 14 November 2019

Notification of Inspection (NRC Inspection Report 05000382/2008004) and Request for Information
ML081570211
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/05/2008
From: William Jones
Region 4 Engineering Branch 1
To: Walsh K
Entergy Operations
References
IR-08-004
Download: ML081570211 (7)


See also: IR 05000382/2008004

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

June 5, 2008

Kevin T. Walsh, Vice President

of Operations

Waterford 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000382/2008004) AND

REQUEST FOR INFORMATION

Dear Mr. Walsh:

From July 7 - 18, 2008, Reactor Inspectors from NRCs Region IV office will perform the

baseline inspection of changes, tests, experiments, and permanent plant modifications at

Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.17,

Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Bob Murillo of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector Sam Graves at (817) 860-8102 (Samuel.Graves@nrc.gov).

Entergy Operations, Inc. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

William B. Jones, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-382

Licenses: NPF-38

Enclosure:

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document

Request

cc: w/enclosure

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Entergy Operations, Inc. -3-

Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

Chairman

Louisiana Public Service Commission

P.O. Box 91154

Baton Rouge, LA 70825-1697

Richard Penrod, Senior Environmental

Scientist, State Liaison Officer

Office of Environmental Services

Northwestern State University

Russell Hall, Room 201

Natchitoches, LA 71497

Parish President Council

St. Charles Parish

P.O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental

Quality Radiological Emergency Planning

and Response Division

P.O. Box 4312

Baton Rouge, LA 70821-4312

Entergy Operations, Inc. -4-

Louisiana Department of Environmental

Quality

Office of Environmental Compliance

P.O. Box 4312

Baton Rouge, LA 70821-4312

Lisa R. Hammond, Chief

Technological Hazards Branch

National Preparedness Division

FEMA Region VI

800 N. Loop 288

Denton, TX 76209

Entergy Operations, Inc. -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ray.Azua@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov)

J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)

ROPreports

WAT Site Secretary (Ann.Youngs@nrc.gov)

SUNSI Review Completed: ADAMS: 6 Yes No Initials:

6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive

S:\DRS\REPORTS\WAT2008003lt-stg.doc ML

RI:EB1 RI:EB1 RI:EB1 C:EB1

STGraves SMakor BHenderson WJones

/RA/ /RA/ /RA/ /RA/

06/5/08 06/5/08 06/5/08 06/5/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: July 7, 2008, - July 18, 2008

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: S. Graves, Reactor Inspector, Lead Inspector

S. Makor, Reactor Inspector

B. Henderson, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com preferred), in care of S. Graves, by June 16, 2008, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

  • A list with descriptions, of all 50.59 screenings performed since June, 2005, which did

not result in an evaluation. Note: Description of screenings should be brief, but of

sufficient detail so that inspectors can determine the significance of the issue.

  • A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC from June, 2005, to the present. Note:

Description of evaluations should be brief, but of sufficient detail so that inspectors can

determine the significance of the issue.

  • Waterford Steam Electric Station, Unit 3 procedure for conducting 10 CFR 50.59

screenings and evaluations.

  • A list with descriptions of all Corrective Action documents related to 10 CFR 50.59

activities, including screenings and evaluations from June, 2005, to the present.

  • A list with descriptions of all permanent plant modifications dating from June, 2005.

Include sufficient detail to enable the inspector to determine the significance of each

modification.

-1- Enclosure

  • Waterford Steam Electric Station, Unit 3 procedure for implementing and controlling

permanent plant modifications.

  • A list with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since June, 2005. Include sufficient

detail to enable the inspector to determine the significance of each modification.

Inspector Contact Information:

S. Graves S. Makor B. Henderson

Reactor Inspector Reactor Inspector Reactor Inspector

817-860-8102 817-276-6507 817-276-6569

Samuel.Graves@nrc.gov Shiattin.Makor@nrc.gov Breck.Henderson@nrc.gov

Mailing Address:

US NRC Region IV

Attn: S. Graves

612 East Lamar Blvd., Suite 400

Arlington, TX 76011

-2- Enclosure