ML082340920: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | {{#Wiki_filter:AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | ||
SURVEILLANCE FREQUENCY SR 3.8.1.3-------------- | SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------- NOTES --------------- | ||
NOTES --------------- | |||
: 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations. | : 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations. | ||
: 2. Momentary transients outside the load range do not invalidate this test.3. This Surveillance shall be conducted on only one DG at a time.4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.Verify each DG is synchronized and loaded and operates for > 60 minutes at a load: a. Unit 1; > 2500 kW; and b. Unit 2; >5100kW and_<5300 kW. | : 2. Momentary transients outside the load range do not invalidate this test. | ||
: 3. This Surveillance shall be conducted on only one DG at a time. | |||
: 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6. | |||
Verify each DG is synchronized and loaded and 31 days operates for > 60 minutes at a load: | |||
: a. Unit 1; > 2500 kW; and | |||
: b. Unit 2; >5100kW and_<5300 kW. | |||
SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 31 days day tank. | |||
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 31 days fuel oil from storage tank to the day tank. | |||
Prairie Island Unit I - Amendment No. 4-58 4-7-4187 Units I and 2 3.8.1-7 Unit 2 - Amendment No. 4-49 165}} |
Latest revision as of 14:44, 14 November 2019
ML082340920 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 08/15/2008 |
From: | Plant Licensing Branch III |
To: | |
Olshan L N, NRR/DORL, 415-1419 | |
Shared Package | |
ML081980111 | List: |
References | |
TAC MD6551 | |
Download: ML082340920 (1) | |
Text
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.3 -------------- NOTES ---------------
- 1. DG loadings may include gradual loading in consideration of manufacturer's recommendations.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.2 or SR 3.8.1.6.
Verify each DG is synchronized and loaded and 31 days operates for > 60 minutes at a load:
- a. Unit 1; > 2500 kW; and
- b. Unit 2; >5100kW and_<5300 kW.
SR 3.8.1.4 Verify fuel oil level above lower limit switch in each 31 days day tank.
SR 3.8.1.5 Verify the fuel oil transfer system operates to transfer 31 days fuel oil from storage tank to the day tank.
Prairie Island Unit I - Amendment No. 4-58 4-7-4187 Units I and 2 3.8.1-7 Unit 2 - Amendment No. 4-49 165