{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
OFFICE OF NUCLEAR REACTOR REGULATION  
                            NUCLEAR REGULATORY COMMISSION
WASHINGTON, DC 20555-0001  
                        OFFICE OF NUCLEAR REACTOR REGULATION
  January 29, 2009
                                  WASHINGTON, DC 20555-0001
  NRC REGULATORY I
                                          January 29, 2009
SSUE SUMMARY 2009-02  
                  NRC REGULATORY ISSUE SUMMARY 2009-02
USE OF CONTAINMENT ATMOSPHERE GASEOUS RADIOACTIVITY  
  USE OF CONTAINMENT ATMOSPHERE GASEOUS RADIOACTIVITY
MONITORS AS REACTOR COOLAN
MONITORS AS REACTOR COOLANT SYSTEM LEAKAGE DETECTION
T SYSTEM LEAKAGE DETECTION  
                EQUIPMENT AT NUCLEAR POWER REACTORS
EQUIPMENT AT NUCLEAR
ADDRESSEES
POWER REACTORS  
All holders of operating licenses for nuclear power reactors except those who have permanently
ADDRESSEES
ceased operations and have certified that fuel has been permanently removed from the reactor
        All holders of operating licenses for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor  
vessel.
vessel. All current and potential applicants for a combined license, manufacturing license, standard  
All current and potential applicants for a combined license, manufacturing license, standard
design certification, or standard design approval for a nuclear power plant under the provisions  
design certification, or standard design approval for a nuclear power plant under the provisions
of Title 10 of the Code of Federal Regulations, Part 52 (10 CFR), "Licenses, Certifications, and  
of Title 10 of the Code of Federal Regulations, Part 52 (10 CFR), Licenses, Certifications, and
Approvals for Nuclear Power Plants.
All applicants for nuclear power plant construction permits and operating licenses under the
provisions of 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities.
INTENT
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)
to communicate the NRC plan to address the situation created when some containment
atmosphere gaseous radioactivity monitors are unable to meet technical specification (TS)
requirements. The plan consists of integrating a streamlined license amendment process with
the use of enforcement discretion, where appropriate. This RIS requires no action or written
response on the part of an addressee.
BACKGROUND INFORMATION
In order to meet General Design Criterion 30, "Quality of reactor coolant pressure boundary," of
Appendix A to 10 CFR Part 50, licensees typically include RCS leakage detection equipment in
their plant designs because the equipment can be used to detect reactor coolant pressure
boundary (RCPB) leakage. A typical RCS leakage detection system consists of a combination
of the following:
*        a containment atmosphere particulate radioactivity monitoring system
*        a containment atmosphere gaseous radioactivity monitoring system
*        containment sump-level and sump-pump instrumentation
*        containment cooler condensate monitoring instrumentation
ML090120669


Approvals for Nuclear Power Plants".  
                                                                                          RIS 2009-02
All applicants for nuclear power plant construction permits and operating licenses under the provisions of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities."
                                                                                          Page 2 of 5
INTENT  The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS) to communicate the NRC plan to address the situation created when some containment  
Containment atmosphere gaseous radioactivity monitoring systems measure RCS leakage
atmosphere gaseous radioactivity monitors are unable to meet technical specification (TS)
indirectly by detecting airborne radioactivity released from RCS leakage. Response time is the
requirements. The plan consists of integrating a streamlined license amendment process with  
length of time required for these monitoring systems to detect a given volume of RCS leakage.
the use of enforcement discretion, where appropriate.  This RIS requires no action or written response on the part of an addressee.  
Response time is dependant on RCS radioactivity concentration, as well as other variables. For
BACKGROUND INFORMATION
a given volume of leakage, with all other variables held constant, a higher RCS radioactivity
  In order to meet General Design Criterion 30, "Quality of reactor coolant pressure boundary," of Appendix A to 10 CFR Part 50, licensees typically include RCS leakage detection equipment in their plant designs because the equipment can be used to detect reactor coolant pressure
concentration will yield a shorter response time for these monitoring systems. The design
analyses for the containment atmosphere gaseous radioactivity monitoring systems used in the
licensing bases for most plants typically assume a RCS radioactivity concentration
approximately equivalent to 0.1 percent failed fuel in the core. Improvements in fuel cladding
integrity and RCS chemistry controls have significantly reduced RCS radioactivity concentration
at most plants. As a result, the monitors for operating units may have longer response times
than they would with 0.1 percent failed fuel in the core because the actual RCS radioactivity
concentration is less than it would be with 0.1 percent failed fuel in the core.
Most plants have TS Limiting Conditions for Operation requirements for containment
atmosphere gaseous radioactivity monitoring systems used as part of RCS leakage detection
equipment. The TS requirements for the monitoring systems response times are based on the
design analysis that is part of a plants licensing basis. If the monitors fail to meet these
requirements, the monitors are inoperable. When the monitors are inoperable the licensee is
required to take remedial actions as permitted by their TS or to shut down the reactor.
Information Notice (IN) 2005-24, Nonconservatism in Leakage Detection Sensitivity
(ADAMS Accession No. ML051780073), communicated the issue created by differences
between actual and assumed RCS radioactivity concentrations to all licensees. The purpose of
IN 2005-24 was to have licensees review information related to problems with containment
atmosphere gaseous radioactivity monitors used as part of RCS leakage detection equipment
and consider appropriate actions as applicable to their plants. Information Notices do not
require any action by licensees.
In September 2008, NRC inspectors at the Diablo Canyon Power Plant identified a non-cited
violation for not complying with TS requirements for RCS leakage detection equipment. In
November 2008, the licensee for the Watts Bar Nuclear Plant and the Sequoyah Nuclear Plant
requested exigent license amendments from the NRC after taking remedial actions as permitted
by their TS because of a concern that the containment atmosphere gaseous radioactivity
monitor channels of the RCS leakage detection system were inoperable.
To address the issue, licensees working through the industry-sponsored Technical
Specifications Task Force (TSTF) have attempted to create generic TS changes, model License
Amendment Requests (LARs), model safety evaluations, and model proposed
no-significant-hazards consideration determinations using the NRC TS Consolidated Line Item
Improvement Process (CLIIP). See RIS 2000-10, Consolidated Line Item Improvement
Process For Adopting Standard Technical Specifications Changes for Power Reactors
(ADAMS Accession No. ML003693442) for more information on the NRC CLIIP.


boundary (RCPB) leakage. A typical RCS leakage detection system consists of a combination
                                                                                        RIS 2009-02
of the following:
                                                                                        Page 3 of 5
SUMMARY OF ISSUE
Improvements in fuel cladding integrity and RCS chemistry controls result in lower RCS
radioactivity concentrations during operational activities, including situations where there is RCS
leakage. Thus, containment atmosphere gaseous radioactivity monitoring systems which are
designed on the basis of higher assumed RCS radioactivity concentrations will not provide
accurate indication of RCS leakage in the required length of time due to the longer response
time of the monitoring system, and must be considered inoperable.
The NRC considers the longer response times of the containment atmosphere gaseous
radioactivity monitors to be of very low safety significance. The monitors would still be able to
detect degradation in the RCPB long before components fail in a manner that would affect plant
safety. Additionally, plants also have multiple diverse and redundant methods available to
detect RCS leakage and to provide licensees with a means to detect significant RCPB
degradation and to take appropriate action to ensure the continued protection of public health
and safety. Finally, nuclear power plants are designed to provide adequate core cooling
following postulated loss-of-coolant accidents up to and including a break equivalent in size to
the double-ended rupture of the largest pipe in the RCS. This design feature, coupled with the
extremely low likelihood of unstable crack growth resulting in a loss-of-coolant accident, leads
the NRC to conclude that the risk significance of this issue is very low.
The NRC plans to address the issue of inoperable containment atmosphere gaseous
radioactivity monitoring systems in an integrated fashion by: (i) working with the TSTF to
develop revised generic TS for the monitoring system, and facilitating licensee implementation
of the revised generic TS through a streamlined license amendment process; and (ii) issuing
guidance on NRCs exercise of enforcement discretion involving inoperable containment
atmosphere gaseous radioactivity monitoring systems.
The NRC will review the generic TS changes that the TSTF proposes for pressurized-water
reactors (PWRs) and boiling-water reactors (BWRs). If the generic TS changes are found to be
acceptable, the NRC will make the generic model LARs, model safety evaluations, and model
no-significant-hazards consideration determinations available to licensees using the NRC CLIIP.
Licensees are free to submit LARs for TS changes to address the issue. If licensees deem
further action regarding the issue is unwarranted, they can choose to take no action.
On November 14, 2008, the TSTF submitted TSTF-513, Revise Operability Requirements and
Actions for RCS Leakage Instrumentation, to the NRC for review. TSTF-513 proposes generic
TS changes for PWRs. The TSTF plans to submit TSTF-514 to the NRC in January 2009.
TSTF-514 will propose generic TS changes for BWRs. Licensees are free to submit LARs to
address the issue using TSTF-513 or TSTF-514; or they can propose alternative solutions.
In certain circumstances involving inoperable containment atmosphere gaseous radioactivity
monitoring systems, enforcement discretion is available. Specific guidance for this enforcement
discretion is described in EGM-09-001 (ADAMS Accession No. ML090300467) and is available
on the NRCs web site at www.nrc.gov.


* a containment atmosphere particulate radioactivity monitoring system
                                                                                      RIS 2009-02
* a containment atmosphere gaseous radioactivity monitoring system 
                                                                                        Page 4 of 5
* containment sump-level and sump-pump instrumentation 
BACKFIT DISCUSSION
* containment cooler condensate monitoring instrumentation
The intent of this RIS is to inform addressees of the NRCs plan to address the failure of
ML090120669 
containment atmosphere gaseous radioactivity monitors used as RCS leakage detection
RIS 2009-02  
equipment to meet TS requirements.
Page 2 of 5 Containment atmosphere gaseous radioactivity monitoring systems measure RCS leakage indirectly by detecting airborne radioactivity released from RCS leakage. Response time is the  
The staff is not imposing any new positions on licensees. This RIS is not providing any new
length of time required for these monitoring systems to detect a given volume of RCS leakage.
regulatory positions. This RIS only conveys the NRCs plan to address the issue of RCS
leakage detection equipment failing to meet TS requirements because of the difference between
actual and assumed RCS radioactivity concentrations. This RIS requires no action or written
response and, therefore, is not a backfit under 10 CFR 50.109, Backfitting. Consequently, the
staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION
A notice of opportunity for public comment on this RIS was not published in the Federal Register
because it is informational and pertains to a staff position that does not represent a departure
from current regulatory requirements and practice. However, a public meeting to discuss this
RIS was held on January 8, 2009. The meeting summary is available under ADAMS Accession
No. ML090130583. The NRC intends to work with industry representatives, members of the
public, and other stakeholders in developing final guidance and in modifying related guidance
documents.
CONGRESSIONAL REVIEW ACT
This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808)
and, therefore, is not subject to the Act.
PAPERWORK REDUCTION ACT STATEMENT
This RIS does not contain any information collections and, therefore, is not subject to the
requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.).
                              PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid OMB control number.


Response time is dependant on RCS radioactivity concentration, as well as other variables.  For a given volume of leakage, with all other variables held constant, a higher RCS radioactivity
                                                                                    RIS 2009-02
concentration will yield a shorter response time for these monitoring systems.  The design analyses for the containment atmosphere gaseous radioactivity monitoring systems used in the licensing bases for most plants typically assume a RCS radioactivity concentration
                                                                                      Page 5 of 5
approximately equivalent to 0.1 percent failed fuel in the core.   Improvements in fuel cladding integrity and RCS chemistry controls have significantly reduced RCS radioactivity concentration at most plants. As a result, the monitors for operating units may have longer response times than they would with 0.1 percent failed fuel in the core because the actual RCS radioactivity concentration is less than it would be with 0.1 percent failed fuel in the core.  
CONTACT
Please direct any questions about this matter to the technical contact listed below or to the
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
                                    /RA by Theodore R. Quay For/
                                    Timothy J. McGinty, Director
                                    Division of Policy and Rulemaking
                                    Office of Nuclear Reactor Regulation
Technical Contact: Matthew Hamm, NRR
                    301-415-1472
                    e-mail: matthew.hamm@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site,
http://www.nrc.gov, under Electronic Reading Room/Document Collections.


                                                                                        RIS 2009-02
Most plants have TS Limiting Conditions fo
                                                                                          Page 5 of 5
r Operation requirements for containment atmosphere gaseous radioactivity monitoring systems used as part of RCS leakage detection
    CONTACT
equipment.  The TS requirements for the monito
    Please direct any questions about this matter to the technical contact listed below or to the
ring systems' response times are based on the design analysis that is part of a plant's licensing basis.  If the monitors fail to meet these requirements, the monitors are inoperable. When the monitors are inoperable the licensee is required to take remedial actions as permitted by their TS or to shut down the reactor.
    appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
 
                                        /RA by Theodore R. Quay For/
                                        Timothy J. McGinty, Director
Information Notice (IN) 2005-24, "Nonconservatism in Leakage Detection Sensitivity" (ADAMS Accession No. ML051780073), communicated the issue created by differences
                                        Division of Policy and Rulemaking
 
                                        Office of Nuclear Reactor Regulation
between actual and assumed RCS radioactivity concentrations to all licensees.  The purpose of IN 2005-24 was to have licensees review information related to problems with containment
    Technical Contact: Matthew Hamm, NRR
atmosphere gaseous radioactivity monitors used as part of RCS leakage detection equipment and consider appropriate actions as applicable to their plants.  Information Notices do not
                        301-415-1472
require any action by licensees.
                        e-mail: matthew.hamm@nrc.gov
    Note: NRC generic communications may be found on the NRC public Web site,
In September 2008, NRC inspectors at the Diabl
    http://www.nrc.gov, under Electronic Reading Room/Document Collections.
o Canyon Power Plant identified a non-cited violation for not complying with TS requirements for RCS leakage detection equipment.  In
    ADAMS ACCESSION No. ML090120669
November 2008, the licensee for the Watts Bar Nuclear Plant and the Sequoyah Nuclear Plant requested exigent license amendments from the NRC after taking remedial actions as permitted by their TS because of a concern that the containment atmosphere gaseous radioactivity monitor channels of the RCS leakage detection system were inoperable. 
OFFICE    ITSB:DIRS     Tech Editor     BC:ITSBDIRS D:DIRS               PSPB DPR       BC:PSPB DPR
 
NAME       MHamm         via email       RElliott         FBrown         JWilliams       SRosenberg
                                                            MCheok for                      DNelson for
To address the issue, licensees working through the industry-sponsored Technical
DATE      12/19/2008     12/15/2008       1/12/2009       1/12/2009       12/30/2008     12/30/2008
Specifications Task Force (TSTF) have attempted to create generic TS changes, model License Amendment Requests (LARs), model safety evaluations, and model proposed
OFFICE    D:DSS         D:DORL           RI:DRP:D         RII:DRP:D       RIII:DRP:D     RIV:DRP:D
no-significant-hazards consideration determinations using the NRC TS Consolidated Line Item Improvement Process (CLIIP).  See RIS 2000-10, "Consolidated Line Item Improvement Process For Adopting Standard Technical Specifications Changes for Power Reactors
NAME       WRuland       for JGiitter     DLew via         LWert via       CPederson      DChamberlain
" (ADAMS Accession No. ML003693442) for more information on the NRC CLIIP.
                                          email           email          via email       via email
   
DATE      1/12/2009     12/30/2008       1/15/2009       1/14/2009       1/13/2009       1/15/2009
 
OFFICE     D:DCI         BC:CHPB                           OE             OGC (NLO)       OGC (CRA)
RIS 2009-02  
                                          D: DCIP/NRO
Page 3 of 5 SUMMARY OF ISSUE
                          DCIP
  Improvements in fuel cladding integrity and RCS chemistry controls result in lower RCS
NAME       MEvans         TFrye           GTracy          DStarkey        BJones          NSanchez
radioactivity concentrations during operational activities, including situations where there is RCS leakage.  Thus, containment atmosphere gaseous radioactivity monitoring systems which are
                          CHinson for                       via email                       via email
designed on the basis of higher assumed RCS radioactivity concentrations will not provide accurate indication of RCS leakage in the required length of time due to the longer response time of the monitoring system, and must be considered inoperable.
DATE       1/15/2009     01/07/2009       01/08/2009       1/14/2009         01/27/2009     1/28/2009
 
OFFICE PMDA              OIS             LA:PGCB         PGCB           BC: PGCB       D:DPR
The NRC considers the longer response times of the containment atmosphere gaseous
NAME       LHill         GTrussell       CHawes           SStuchell       MMurphy         TMcGinty TRQ
radioactivity monitors to be of very low safety significance.  The monitors would still be able to detect degradation in the RCPB long before components fail in a manner that would affect plant safety.  Additionally, plants also have multiple diverse and redundant methods available to
                                                                                            for
detect RCS leakage and to provide licensees with a means to detect significant RCPB
DATE       01/05/2009     01/07/2009       1/28/2009       1/28/2009       1/29/2009     1/29/2009
degradation and to take appropriate action to ensure the continued protection of public health
    OFFICIAL RECORD COPY
 
and safety.  Finally, nuclear power plants are designed to provide adequate core cooling following postulated loss-of-coolant accidents up to and including a break equivalent in size to
the double-ended rupture of the largest pipe in the RCS.  This design feature, coupled with the
extremely low likelihood of unstable crack growth resulting in a loss-of-coolant accident, leads
the NRC to conclude that the risk signifi
cance of this issue is very low.
The NRC plans to address the issue of inoperable containment atmosphere gaseous
radioactivity monitoring systems in an integrated fashion by: (i) working with the TSTF to develop revised generic TS for the monitoring system, and facilitating licensee implementation of the revised generic TS through a streamlined license amendment process; and (ii) issuing guidance on NRC's exercise of enforcement
discretion involving inoperable containment atmosphere gaseous radioactivity monitoring systems. 
The NRC will review the generic TS changes that the TSTF proposes for pressurized-water
reactors (PWRs) and boiling-water reactors (BWRs).  If the generic TS changes are found to be
acceptable, the NRC will make the generic model
LARs, model safety evaluations, and model
no-significant-hazards consideration determinations available to licensees using the NRC CLIIP. Licensees are free to submit LARs for TS changes to address the issue.  If licensees deem further action regarding the issue is unwarranted, they can choose to take no action.
On November 14, 2008, the TSTF submitted TSTF-513, "Revise Operability Requirements and
Actions for RCS Leakage Instrumentation," to the NRC for review.  TSTF-513 proposes generic
 
TS changes for PWRs.  The TSTF plans to submit TSTF-514 to the NRC in January 2009.  TSTF-514 will propose generic TS changes for BWRs.  Licensees are free to submit LARs to address the issue using TSTF-513 or TSTF-514; or they can propose alternative solutions. 
In certain circumstances involving inoperable containment atmosphere gaseous radioactivity monitoring systems, enforcement discretion is available.  Specific guidance for this enforcement discretion is described in EGM-09-001
(ADAMS Accession No.
ML090300467) and is available
on the NRC's web site at www.nrc.gov
 
RIS 2009-02
Page 4 of 5 BACKFIT DISCUSSION
  The intent of this RIS is to inform addressees of the NRC's plan to address the failure of
containment atmosphere gaseous radioactivity monitors used as RCS leakage detection
 
equipment to meet TS requirements.
 
  The staff is not imposing any new positions on licensees.  This RIS is not providing any new
regulatory positions.  This RIS only conveys the NRC's plan to address the issue of RCS leakage detection equipment failing to meet TS requirements because of the difference between actual and assumed RCS radioactivity concentrations.  This RIS requires no action or written response and, therefore, is not a backfit under 10 CFR 50.109, "Backfitting."  Consequently, the staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION
  A notice of opportunity for public comment on this RIS was not published in the
Federal Register
because it is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice.  However, a public meeting to discuss this
RIS was held on January 8, 2009.  The meeting summary is available under ADAMS Accession
No. ML090130583.  The NRC intends to work with industry representatives, members of the
public, and other stakeholders in developing final guidance and in modifying related guidance
documents.
CONGRESSIONAL REVIEW ACT
  This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808) and, therefore, is not subject to the Act.
PAPERWORK REDUCTION ACT STATEMENT
  This RIS does not contain any information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.).
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
 
 
 
RIS 2009-02
Page 5 of 5  CONTACT Please direct any questions about this matter to the technical contact listed below or to the
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.
 
/RA by Theodore R. Quay For/
Timothy J. McGinty, Director
Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
  Technical Contact:  Matthew Hamm, NRR        301-415-1472
        e-mail:  matthew.hamm@nrc.gov
 
Note: NRC generic communications may be found on the NRC public Web site,
http://www.nrc.gov, under Electronic Reading Room/Document Collections. 
RIS 2009-02
Page 5 of 5 CONTACT  Please direct any questions about this matter to the technical contact listed below or to the  
appropriate Office of Nuclear Reactor Regulation (NRR) project manager.  
 
/RA by Theodore R. Quay For/  
Timothy J. McGinty, Director  
 
Division of Policy and Rulemaking  
Office of Nuclear Reactor Regulation  
  Technical Contact: Matthew Hamm, NRR         301-415-1472  
e-mail: matthew.hamm@nrc.gov
  Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.  
ADAMS ACCESSION No. ML090120669 OFFICIAL RECORD COPY
O FFICE 
ITSB:DIRS  
Tech Editor BC:ITSBDIRS
D:DIRS PSPB DPR
BC:PSPB DPR  
NAME MHamm via email  
RElliott FBrown MCheok for
JWilliams  
SRosenberg  
DNelson for  
D ATE 12/19/2008  
12/15/2008  
1/12/2009 1/12/2009 12/30/2008  
12/30/2008  
O FFICE D:DSS D:DORL
RI:DRP:D
RII:DRP:D  
RIII:DRP:D  
RIV:DRP:D  
NAME WRuland for JGiitter  
DLew via email LWert via  
email CPederson
 
via email DChamberlain
 
via email  
D ATE 1/12/2009 12/30/2008  
1/15/2009  
1/14/2009 1/13/2009 1/15/2009
OFFICE
D:DCI BC:CHPB DCIP D: DCIP/NRO
OE
OGC (NLO)  
OGC (CRA)  
NAME MEvans TFrye CHinson for  
GTracy DStarkey via email  
BJones NSanchez via email
DATE 1/15/2009 0 1/07/2009  
01/08/2009  
1/14/2009   01/27/2009  
1/28/2009  
OFFICE
P MDA 
OIS LA:PGCB PGCB BC: PGCB D:DPR NAME
LHill GTrussell  
CHawes  
SStuchell  
MMurphy TMcGinty TRQ  
for
DATE 01/05/2009  
01/07/2009  
1/28/2009  
1/28/2009  
1/29/2009  
1/29/2009
}}
}}

Revision as of 09:56, 14 November 2019

Use of Containment Atmosphere Gaseous Radioactivity Monitors as Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors
ML090120669
Person / Time
Issue date: 01/29/2009
From: Mcginty T
Division of Policy and Rulemaking
To:
Hawes C, NRR/DPR/PGCB, 415-1316
References
RIS-09-002
Download: ML090120669 (6)


See also: RIS 2009-02

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555-0001

January 29, 2009

NRC REGULATORY ISSUE SUMMARY 2009-02

USE OF CONTAINMENT ATMOSPHERE GASEOUS RADIOACTIVITY

MONITORS AS REACTOR COOLANT SYSTEM LEAKAGE DETECTION

EQUIPMENT AT NUCLEAR POWER REACTORS

ADDRESSEES

All holders of operating licenses for nuclear power reactors except those who have permanently

ceased operations and have certified that fuel has been permanently removed from the reactor

vessel.

All current and potential applicants for a combined license, manufacturing license, standard

design certification, or standard design approval for a nuclear power plant under the provisions

of Title 10 of the Code of Federal Regulations, Part 52 (10 CFR), Licenses, Certifications, and

Approvals for Nuclear Power Plants.

All applicants for nuclear power plant construction permits and operating licenses under the

provisions of 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to communicate the NRC plan to address the situation created when some containment

atmosphere gaseous radioactivity monitors are unable to meet technical specification (TS)

requirements. The plan consists of integrating a streamlined license amendment process with

the use of enforcement discretion, where appropriate. This RIS requires no action or written

response on the part of an addressee.

BACKGROUND INFORMATION

In order to meet General Design Criterion 30, "Quality of reactor coolant pressure boundary," of

Appendix A to 10 CFR Part 50, licensees typically include RCS leakage detection equipment in

their plant designs because the equipment can be used to detect reactor coolant pressure

boundary (RCPB) leakage. A typical RCS leakage detection system consists of a combination

of the following:

  • a containment atmosphere particulate radioactivity monitoring system
  • a containment atmosphere gaseous radioactivity monitoring system
  • containment sump-level and sump-pump instrumentation
  • containment cooler condensate monitoring instrumentation

ML090120669

RIS 2009-02

Page 2 of 5

Containment atmosphere gaseous radioactivity monitoring systems measure RCS leakage

indirectly by detecting airborne radioactivity released from RCS leakage. Response time is the

length of time required for these monitoring systems to detect a given volume of RCS leakage.

Response time is dependant on RCS radioactivity concentration, as well as other variables. For

a given volume of leakage, with all other variables held constant, a higher RCS radioactivity

concentration will yield a shorter response time for these monitoring systems. The design

analyses for the containment atmosphere gaseous radioactivity monitoring systems used in the

licensing bases for most plants typically assume a RCS radioactivity concentration

approximately equivalent to 0.1 percent failed fuel in the core. Improvements in fuel cladding

integrity and RCS chemistry controls have significantly reduced RCS radioactivity concentration

at most plants. As a result, the monitors for operating units may have longer response times

than they would with 0.1 percent failed fuel in the core because the actual RCS radioactivity

concentration is less than it would be with 0.1 percent failed fuel in the core.

Most plants have TS Limiting Conditions for Operation requirements for containment

atmosphere gaseous radioactivity monitoring systems used as part of RCS leakage detection

equipment. The TS requirements for the monitoring systems response times are based on the

design analysis that is part of a plants licensing basis. If the monitors fail to meet these

requirements, the monitors are inoperable. When the monitors are inoperable the licensee is

required to take remedial actions as permitted by their TS or to shut down the reactor.

Information Notice (IN) 2005-24, Nonconservatism in Leakage Detection Sensitivity

(ADAMS Accession No. ML051780073), communicated the issue created by differences

between actual and assumed RCS radioactivity concentrations to all licensees. The purpose of

IN 2005-24 was to have licensees review information related to problems with containment

atmosphere gaseous radioactivity monitors used as part of RCS leakage detection equipment

and consider appropriate actions as applicable to their plants. Information Notices do not

require any action by licensees.

In September 2008, NRC inspectors at the Diablo Canyon Power Plant identified a non-cited

violation for not complying with TS requirements for RCS leakage detection equipment. In

November 2008, the licensee for the Watts Bar Nuclear Plant and the Sequoyah Nuclear Plant

requested exigent license amendments from the NRC after taking remedial actions as permitted

by their TS because of a concern that the containment atmosphere gaseous radioactivity

monitor channels of the RCS leakage detection system were inoperable.

To address the issue, licensees working through the industry-sponsored Technical

Specifications Task Force (TSTF) have attempted to create generic TS changes, model License

Amendment Requests (LARs), model safety evaluations, and model proposed

no-significant-hazards consideration determinations using the NRC TS Consolidated Line Item

Improvement Process (CLIIP). See RIS 2000-10, Consolidated Line Item Improvement

Process For Adopting Standard Technical Specifications Changes for Power Reactors

(ADAMS Accession No. ML003693442) for more information on the NRC CLIIP.

RIS 2009-02

Page 3 of 5

SUMMARY OF ISSUE

Improvements in fuel cladding integrity and RCS chemistry controls result in lower RCS

radioactivity concentrations during operational activities, including situations where there is RCS

leakage. Thus, containment atmosphere gaseous radioactivity monitoring systems which are

designed on the basis of higher assumed RCS radioactivity concentrations will not provide

accurate indication of RCS leakage in the required length of time due to the longer response

time of the monitoring system, and must be considered inoperable.

The NRC considers the longer response times of the containment atmosphere gaseous

radioactivity monitors to be of very low safety significance. The monitors would still be able to

detect degradation in the RCPB long before components fail in a manner that would affect plant

safety. Additionally, plants also have multiple diverse and redundant methods available to

detect RCS leakage and to provide licensees with a means to detect significant RCPB

degradation and to take appropriate action to ensure the continued protection of public health

and safety. Finally, nuclear power plants are designed to provide adequate core cooling

following postulated loss-of-coolant accidents up to and including a break equivalent in size to

the double-ended rupture of the largest pipe in the RCS. This design feature, coupled with the

extremely low likelihood of unstable crack growth resulting in a loss-of-coolant accident, leads

the NRC to conclude that the risk significance of this issue is very low.

The NRC plans to address the issue of inoperable containment atmosphere gaseous

radioactivity monitoring systems in an integrated fashion by: (i) working with the TSTF to

develop revised generic TS for the monitoring system, and facilitating licensee implementation

of the revised generic TS through a streamlined license amendment process; and (ii) issuing

guidance on NRCs exercise of enforcement discretion involving inoperable containment

atmosphere gaseous radioactivity monitoring systems.

The NRC will review the generic TS changes that the TSTF proposes for pressurized-water

reactors (PWRs) and boiling-water reactors (BWRs). If the generic TS changes are found to be

acceptable, the NRC will make the generic model LARs, model safety evaluations, and model

no-significant-hazards consideration determinations available to licensees using the NRC CLIIP.

Licensees are free to submit LARs for TS changes to address the issue. If licensees deem

further action regarding the issue is unwarranted, they can choose to take no action.

On November 14, 2008, the TSTF submitted TSTF-513, Revise Operability Requirements and

Actions for RCS Leakage Instrumentation, to the NRC for review. TSTF-513 proposes generic

TS changes for PWRs. The TSTF plans to submit TSTF-514 to the NRC in January 2009.

TSTF-514 will propose generic TS changes for BWRs. Licensees are free to submit LARs to

address the issue using TSTF-513 or TSTF-514; or they can propose alternative solutions.

In certain circumstances involving inoperable containment atmosphere gaseous radioactivity

monitoring systems, enforcement discretion is available. Specific guidance for this enforcement

discretion is described in EGM-09-001 (ADAMS Accession No. ML090300467) and is available

on the NRCs web site at www.nrc.gov.

RIS 2009-02

Page 4 of 5

BACKFIT DISCUSSION

The intent of this RIS is to inform addressees of the NRCs plan to address the failure of

containment atmosphere gaseous radioactivity monitors used as RCS leakage detection

equipment to meet TS requirements.

The staff is not imposing any new positions on licensees. This RIS is not providing any new

regulatory positions. This RIS only conveys the NRCs plan to address the issue of RCS

leakage detection equipment failing to meet TS requirements because of the difference between

actual and assumed RCS radioactivity concentrations. This RIS requires no action or written

response and, therefore, is not a backfit under 10 CFR 50.109, Backfitting. Consequently, the

staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register

because it is informational and pertains to a staff position that does not represent a departure

from current regulatory requirements and practice. However, a public meeting to discuss this

RIS was held on January 8, 2009. The meeting summary is available under ADAMS Accession

No. ML090130583. The NRC intends to work with industry representatives, members of the

public, and other stakeholders in developing final guidance and in modifying related guidance

documents.

CONGRESSIONAL REVIEW ACT

This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808)

and, therefore, is not subject to the Act.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain any information collections and, therefore, is not subject to the

requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.).

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

RIS 2009-02

Page 5 of 5

CONTACT

Please direct any questions about this matter to the technical contact listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA by Theodore R. Quay For/

Timothy J. McGinty, Director

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation

Technical Contact: Matthew Hamm, NRR

301-415-1472

e-mail: matthew.hamm@nrc.gov

Note: NRC generic communications may be found on the NRC public Web site,

http://www.nrc.gov, under Electronic Reading Room/Document Collections.

RIS 2009-02

Page 5 of 5

CONTACT

Please direct any questions about this matter to the technical contact listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA by Theodore R. Quay For/

Timothy J. McGinty, Director

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation

Technical Contact: Matthew Hamm, NRR

301-415-1472

e-mail: matthew.hamm@nrc.gov

Note: NRC generic communications may be found on the NRC public Web site,

http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ADAMS ACCESSION No. ML090120669

OFFICE ITSB:DIRS Tech Editor BC:ITSBDIRS D:DIRS PSPB DPR BC:PSPB DPR

NAME MHamm via email RElliott FBrown JWilliams SRosenberg

MCheok for DNelson for

DATE 12/19/2008 12/15/2008 1/12/2009 1/12/2009 12/30/2008 12/30/2008

OFFICE D:DSS D:DORL RI:DRP:D RII:DRP:D RIII:DRP:D RIV:DRP:D

NAME WRuland for JGiitter DLew via LWert via CPederson DChamberlain

email email via email via email

DATE 1/12/2009 12/30/2008 1/15/2009 1/14/2009 1/13/2009 1/15/2009

OFFICE D:DCI BC:CHPB OE OGC (NLO) OGC (CRA)

D: DCIP/NRO

DCIP

NAME MEvans TFrye GTracy DStarkey BJones NSanchez

CHinson for via email via email

DATE 1/15/2009 01/07/2009 01/08/2009 1/14/2009 01/27/2009 1/28/2009

OFFICE PMDA OIS LA:PGCB PGCB BC: PGCB D:DPR

NAME LHill GTrussell CHawes SStuchell MMurphy TMcGinty TRQ

for

DATE 01/05/2009 01/07/2009 1/28/2009 1/28/2009 1/29/2009 1/29/2009

OFFICIAL RECORD COPY