{{#Wiki_filter:PRELIMINARY INFORMATION  
{{#Wiki_filter:PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION August 31, 2009 EN-09-044 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       Northern States Power Company - Minnesota                   (EA-09-167)
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION
Prairie Island Nuclear Generating Plant, Unit 2 Docket No. 05000306
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION August 31, 2009 EN-09-044 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION
 
Licensee: Northern States Power Company - Minnesota (EA-09-167)   Prairie Island Nuclear Generating Plant, Unit 2   Docket No. 05000306  


==Subject:==
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 3, 2009, to Northern States Power Company - Minnesota as a result of inspections at the Prairie Island Nuclear Generating Plant, Unit 2. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the licensee's failure to design the component cooling water system such that it would be protected from the impact of a high energy line break, seismic event, or tornado event. On August 10, 2009, Northern States Power Company - Minnesota indicated they did not contest the characterization of the risk significance of this finding and they declined the opportunity to discuss this issue in a Regulatory Conference or to provide a written response. Corrective actions are currently in place. A Notice of Violation is included based on a violation of 10 CFR 50, Appendix B, Criterion III, "Design Control," which requires, in part, that measures be established to assure that the design basis for safety-related functions of structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions. Further, Criterion III requires that the design control measures provide for verifying or checking the adequacy of designs.  
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 3, 2009, to Northern States Power Company - Minnesota as a result of inspections at the Prairie Island Nuclear Generating Plant, Unit 2. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the licensees failure to design the component cooling water system such that it would be protected from the impact of a high energy line break, seismic event, or tornado event.
 
On August 10, 2009, Northern States Power Company - Minnesota indicated they did not contest the characterization of the risk significance of this finding and they declined the opportunity to discuss this issue in a Regulatory Conference or to provide a written response.
Corrective actions are currently in place.
A Notice of Violation is included based on a violation of 10 CFR 50, Appendix B, Criterion III, Design Control, which requires, in part, that measures be established to assure that the design basis for safety-related functions of structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions. Further, Criterion III requires that the design control measures provide for verifying or checking the adequacy of designs.
Contrary to this requirement, the licensee failed to implement design control measures to ensure that the design basis for the component cooling water system was correctly translated into specifications, drawings, procedures, and instructions. Specifically, the licensee failed to ensure that the safety-related function of the component cooling water system was maintained following a high energy line break, seismic event, or tornado event in the turbine building.
Contrary to this requirement, the licensee failed to implement design control measures to ensure that the design basis for the component cooling water system was correctly translated into specifications, drawings, procedures, and instructions. Specifically, the licensee failed to ensure that the safety-related function of the component cooling water system was maintained following a high energy line break, seismic event, or tornado event in the turbine building.
It should be noted that the licensee has not been specifically informed of the enforcement action.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:  
The schedule of issuance and notification is:
 
Mailing of Final Significance Determination                   September 3, 2009 Telephone Notification of Licensee                           September 3, 2009 The State of Minnesota will be notified.
Mailing of Final Significance Determination   September 3, 2009 Telephone Notification of Licensee   September 3, 2009  
Contacts: Gerry Gulla, OE, (301) 415-2872             Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION
 
The State of Minnesota will be notified.  
 
Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939  
 
PRELIMINARY INFORMATION  
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION
 
Distribution: EN-09-044, August 31, 2009 OWFN Chairman Jaczko Comm. Klein Comm. Svinicki SECY OCA OPA OIP OWFN EDO DEDR DEDMRT OE OGC NRR OI NSIR TWFN OCFO OP CENTER NMSS OIG OIS RES ACRS FSME Regional Offices RI          RII RIII        RIV


MAIL PUBLIC OE staff   Electronic DISTRIBUTION:   C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X     Non-Sensitive X ML092430391 OFFICE OE:ES OE:BC NAME G. Gulla G. Bowman DATE 08/31/09 08/31/09 OFFICIAL RECORD COPY}}
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-044, August 31, 2009 OWFN                    OWFN              TWFN            Regional Offices Chairman Jaczko        EDO              OCFO            RI      RII Comm. Klein            DEDR              OP CENTER        RIII    RIV Comm. Svinicki          DEDMRT            NMSS SECY                    OE                OIG OCA                    OGC              OIS              MAIL OPA                    NRR              RES              PUBLIC OIP                    OI                ACRS            OE staff NSIR              FSME Electronic DISTRIBUTION:
C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092430391 OFFICE OE:ES                     OE:BC NAME         G. Gulla           G. Bowman DATE         08/31/09           08/31/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION}}

Revision as of 02:44, 14 November 2019

EN-09-044, Northern States Power Company
ML092430391
Person / Time
Site: Prairie Island 
Issue date: 08/31/2009
From: Gerald Gulla
NRC/OE
To:
Gulla G. 415-2872
References
EA-09-167 EN-09-044
Download: ML092430391 (2)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION August 31, 2009 EN-09-044 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Northern States Power Company - Minnesota (EA-09-167)

Prairie Island Nuclear Generating Plant, Unit 2 Docket No. 05000306

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 3, 2009, to Northern States Power Company - Minnesota as a result of inspections at the Prairie Island Nuclear Generating Plant, Unit 2. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the licensees failure to design the component cooling water system such that it would be protected from the impact of a high energy line break, seismic event, or tornado event.

On August 10, 2009, Northern States Power Company - Minnesota indicated they did not contest the characterization of the risk significance of this finding and they declined the opportunity to discuss this issue in a Regulatory Conference or to provide a written response.

Corrective actions are currently in place.

A Notice of Violation is included based on a violation of 10 CFR 50, Appendix B, Criterion III, Design Control, which requires, in part, that measures be established to assure that the design basis for safety-related functions of structures, systems, and components are correctly translated into specifications, drawings, procedures, and instructions. Further, Criterion III requires that the design control measures provide for verifying or checking the adequacy of designs.

Contrary to this requirement, the licensee failed to implement design control measures to ensure that the design basis for the component cooling water system was correctly translated into specifications, drawings, procedures, and instructions. Specifically, the licensee failed to ensure that the safety-related function of the component cooling water system was maintained following a high energy line break, seismic event, or tornado event in the turbine building.

It should be noted that the licensee has not been specifically informed of the enforcement action.

The schedule of issuance and notification is:

Mailing of Final Significance Determination September 3, 2009 Telephone Notification of Licensee September 3, 2009 The State of Minnesota will be notified.

Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-044, August 31, 2009 OWFN OWFN TWFN Regional Offices Chairman Jaczko EDO OCFO RI RII Comm. Klein DEDR OP CENTER RIII RIV Comm. Svinicki DEDMRT NMSS SECY OE OIG OCA OGC OIS MAIL OPA NRR RES PUBLIC OIP OI ACRS OE staff NSIR FSME Electronic DISTRIBUTION:

C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092430391 OFFICE OE:ES OE:BC NAME G. Gulla G. Bowman DATE 08/31/09 08/31/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION