{{#Wiki_filter:Pacif i c Gas and Electric Company Octob e r 2 7, 2 010 PG&E Letter DCL-1 0-134 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20852 Docket No. 50-275, OL-DPR-80 Docket No. 50-323 , OL-DPR-82 Diablo Canyon Un i ts 1 and 2 James R. B ecker S it e Vi ce Pres i dent D i ab lo Ca n yo n Power P l ant Mail Code 104/5/601 p. O. Bo x 56 A vil a Beach , C A 93 4 2 4 805.545.3 4 62 Internal:
{{#Wiki_filter:Pacific Gas and Electric Company                                                 James R. Becker    Diablo Canyon Power Plant Site Vice President Mail Code 104/ 5/ 601
691.3462 Fax: 80 5.545.6 44 5 Response to NRC Letter dated September
: p. O. Box 56 Avila Beach, CA93424 805.545.3462 October 27, 2010                                                                      Internal: 691.3462 Fax: 805.545. 6445 PG&E Letter DCL-10-134 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20852 Docket No. 50-275, OL-DPR-80 Docket No. 50-323 , OL-DPR-82 Diablo Canyon Un its 1 and 2 Response to NRC Letter dated September 28. 2010. Summary of Telephone Conference Call Held on September 2. 2010. Between the U.S. Nuclear Regulatory Commission and Pacific Gas and Electric Company Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant. Units 1 and 2. License Renewal Application
: 28. 2010. Summary of Telephone Conference Call Held on September
: 2. 2010. Between the U.S. Nuclear Regulatory Commission and Pacific Gas and Electric Company Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant. Units 1 and 2. License Renewal Application Dear Commissioners and Staff: By letter dated November 23, 2009, Pacific Gas and Electric Company (PG&E) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP) Units 1 and 2, respectively.
The application included the license renewal application (LRA) and Applicant's Environmental Report -Operating License Renewal Stage. By letter dated September 28 , 2010, the NRC staff sent a summary of a telephone conference between the NRC and representatives of Pacific Gas and Electric Company held on September 2, 2010. This telephone conference was to obtain clarification on the applicant's response to request for additional information (RAI) submitted to the NRC in letters dated June 3, 2010 , July 7, 2010, and August 17, 2010, regarding fire water and One-Time Inspection Aging Management Programs. PG&E's supplemental information to the RAI response for which the staff requested clarification is provided in Enclosure
: 1. LRA Amendment 23 resulting from the responses is included in Enclosure 2 showing the changed pages with line-in/lineout annotations.
Other follow-up RAls , determined by the NRC staff to be necessary will be issued separately by a formal letter. PG&E makes a commitment in revised LRA Table A4-1, License Renewal Commitments, shown in Enclosure
: 2. A member of the STARS (Strategic Teamin g and Resource Sharing) Alliance Callaway. Comanche Peak. Di a blo Canyon. Palo V e rd e. San Onofre. South Te xa s Proj e ct. Wolf Cree k Document Control Desk October 27,2010 Page 2 PG&E Letter DCL-10-134 If you have any questions regarding this response, p l ease contact Mr. Terence L. Grebel, License Renewal Project Manager , at (805) 545-4160.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October 27, 2010. Site Vice President TLG/50347222 Enclosures cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Regional Administrator Nathanial Ferrer, NRC Project Manager, License Renewal Kimberly J. Green, NRC Project Manager, License Renewal Fred Lyon, NRC Project Manager, Office of Nuclear Reactor Regulation Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRC Project Manager, License Renewal A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre
* South Te x as Project. Wolf Creek PG&E Letter DCL-10-134 Page 1 of 5 PG&E Response to NRC Letter dated September 28, 2010, Summary of Telephone Conference Call Held on September 2, 2010, Concerning Responses to Requests for Addi tional Information (Set 1, 4, and 12) Related to the Diablo Canyon License Renewal Application RAI B2.1.13-2 In its June 3, 2010, response to RAI B2.1.
13-2, the applicant prov ided details of the basis for maintaining the 18-month inspection frequency for Fire Water System Program. However, the staff was unclear how the operating experience was applied as part of the basis for the inspection frequency.


Discussion
==Dear Commissioners and Staff:==
:
PG&E agreed to supplement its response to RA I B2.1.13-2 to clarify how operating experience was considered as part of the basis for the 18-month inspection frequency. 


PG&E Supplemental Response to Question B2.1.13-2
By letter dated November 23, 2009, Pacific Gas and Electric Company (PG&E) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP) Units 1 and 2, respectively. The application included the license renewal application (LRA) and Applicant's Environmental Report - Operating License Renewal Stage.
By letter dated September 28 , 2010, the NRC staff sent a summary of a telephone conference between the NRC and representatives of Pacific Gas and Electric Company held on September 2, 2010. This telephone conference was to obtain clarification on the applicant's response to request for additional information (RAI) submitted to the NRC in letters dated June 3, 2010 , July 7, 2010, and August 17, 2010, regarding fire water and One-Time Inspection Aging Management Programs.
PG&E's supplemental information to the RAI response for which the staff requested clarification is provided in Enclosure 1. LRA Amendment 23 resulting from the responses is included in Enclosure 2 showing the changed pages with line-in/line-out annotations. Other follow-up RAls, determined by the NRC staff to be necessary will be issued separately by a formal letter.
PG&E makes a commitment in revised LRA Table A4-1, License Renewal Commitments, shown in Enclosure 2.
A member of the STARS (Strategic Teamin g and Resource Sharing) Alliance Callaway . Comanche Peak . Di ablo Canyon . Palo Ve rd e. San Onofre . South Te xa s Proj ect . Wolf Cree k


PG&E letter DCL-10-057 dated June 3, 2010, provided a response to NRC Request for Additional Information (RAI) B2
Document Control Desk                                            PG&E Letter DCL-10-134 October 27,2010 Page 2 If you have any questions regarding this response, please contact Mr. Terence L. Grebel, License Renewal Project Manager, at (805) 545-4160.
.1.13-2. The response to this RAI revises/supplements the previously prov ided information on inspection frequency for above grade fire water piping and below grade fire water piping.  
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 27, 2010.
Site Vice President TLG/50347222 Enclosures cc:      Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Regional Administrator Nathanial Ferrer, NRC Project Manager, License Renewal Kimberly J. Green, NRC Project Manager, License Renewal Fred Lyon, NRC Project Manager, Office of Nuclear Reactor Regulation Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRC Project Manager, License Renewal A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Comanche Peak. Diablo Canyon. Palo Verde. San Onofre
* South Te x as Project. Wolf Creek


Above grade Diablo Canyon Power Plant (DCPP) fire water piping is visually inspected  
Enclosure 1 PG&E Letter DCL-10-134 Page 1 of 5 PG&E Response to NRC Letter dated September 28, 2010, Summary of Telephone Conference Call Held on September 2, 2010, Concerning Responses to Requests for Additional Information (Set 1, 4, and 12)
Related to the Diablo Canyon License Renewal Application RAI B2.1.13-2 In its June 3, 2010, response to RAI B2.1.13-2, the applicant provided details of the basis for maintaining the 18-month inspection frequency for Fire Water System Program. However, the staff was unclear how the operating experience was applied as part of the basis for the inspection frequency.
Discussion:
PG&E agreed to supplement its response to RAI B2.1.13-2 to clarify how operating experience was considered as part of the basis for the 18-month inspection frequency.
PG&E Supplemental Response to Question B2.1.13-2 PG&E letter DCL-10-057 dated June 3, 2010, provided a response to NRC Request for Additional Information (RAI) B2.1.13-2. The response to this RAI revises/supplements the previously provided information on inspection frequency for above grade fire water piping and below grade fire water piping.
Above grade Diablo Canyon Power Plant (DCPP) fire water piping is visually inspected for early indications of aging effects (such as material wastage, pitting, blistering, or porosity) on an 18-month frequency. In addition, the firewater yard loop and underground feeds are flushed semi-annually. The flowing water removes accumulated debris and/or sediment which can be indicative of internal pipe aging. The firewater system is flow tested at least every three years in order to verify firewater system design and National Fire Protection Association test requirements.
These testing frequencies are performed to satisfy DCPP equipment control guidelines (ECGs), which were relocated from the DCPP Technical Specifications. Per License Amendments 74 and 75 for Units 1 and 2, respectively, NRC approved DCPP's request to relocate the fire protection Technical Specifications and associated bases to the ECGs. Therefore, DCPP's testing frequencies are in compliance with the licensing basis previously approved by NRC.
Plant procedures require that any degradation observed during inspection activities be entered into the corrective action program. As discussed in License Renewal Application Section B2.1.13, several examples of degradation or corrosion of fire water system including through wall leaks have occurred. These deficiencies were promptly


for early indications of aging effects (such as material wastage, pitting, blistering, or porosity) on an 18-month frequency. In addition, the firewater yard loop and  
Enclosure 1 PG&E Letter DCL-10-134 Page 2 of 5 corrected and did not affect the fire water system intended function. Corrective actions and preventive measures have been developed in response to plant-specific operating experience on firewater components to ensure their license renewal intended function is maintained. DCPP corrective actions taken to resolve above grade firewater piping/hydrant leakage operating experience include piping replacement with current design specified materials; for example, ductile iron replaces cast iron pipe, polyvinyl chloride pipe replaces asbestos cement pipe, and new fire hydrants installed when degradation is identified. Planned buried pipe replacement will evaluate use of cathodic protection based on pipe and soil excavation findings.
The plant specific visual inspection interval is determined by engineering evaluation of the fire protection piping to ensure that degradation is detected before the loss of intended function. As discussed above, the current DCPP above grade firewater piping visual inspection frequency is 18 months. The ability of the fire water system to perform its intended function is periodically reviewed as part of plant health review process. In accordance with NUREG-1801, XI.M27, Fire Water System, the above grade visual inspection frequency is evaluated in response to plant specific and industrial operating experience to ensure this frequency is adequate for the fire water system above grade piping to perform its intended function.
PG&E is currently revising the Buried and Underground Piping and Tanks Program as part of its response to the NRCs RAI Set 29, RAI B2.1.18-2 (Follow-up). This response will also address below grade fire water piping inspections and frequencies. This response will be submitted no later then November 30, 2010.


underground feeds are flushed semi-annually. The flowing water removes accumulated
Enclosure 1 PG&E Letter DCL-10-134 Page 3 of 5 RAI B2.1.13-4 In its August 17, 2010, response to RAI B2.1.13-4, the applicant provided details of the methodology and inspection techniques used for the firewater tank. However, the staff was unclear if the underside of the tank was accessible for the inspections described.
 
Discussion:
debris and/or sediment which can be indicati ve of internal pipe aging. The firewater system is flow tested at least every three year s in order to verify firewater system design and National Fire Protection Association test requirements.
PG&E agreed to supplement its response to RAI B2.1.13-4 to clarify how the underside of firewater tank will be inspected.
 
PG&E Supplemental Response to Question B2.1.13-4 The underside of the firewater tank is inaccessible for visual inspection. PG&E routinely performs visual inspections of the firewater tank internals, as stated previously in PG&E Letter DCL-10-101 dated August 17, 2010. Recent dive inspections have found the firewater tank bottom to be in good condition. PG&E is currently scheduled to refurbish the firewater tank in 2011. The tank refurbishment will perform ultrasonic thickness (UT) thickness measurements of the firewater tank bottom. PG&E will evaluate UT measurement results and take appropriate corrective action to manage aging effects.
These testing frequencies are performed to satisfy DCPP equipment control guidelines (ECGs), which were relocated from the DC PP Technical Specifications. Per License Amendments 74 and 75 for Units 1 and 2, re spectively, NRC approved DCPP's request to relocate the fire protection Technical Specifications and associated bases to the ECGs. Therefore, DCPP's testing frequenc ies are in compliance with the licensing basis previously approved by NRC.
PG&E will perform an additional one-time UT examination of the tank bottom during the 10 years period prior to entering the period of extended operation to confirm its integrity.
 
License Renewal Application (LRA) Table A4-1 has been revised to state that PG&E will perform a one-time inspection of the firewater tank bottom using non-intrusive volumetric examination technique. LRA Section B2.1.13 has been revised to clarify that the Fire Water System Aging Management Program will be used to manage the overall aging of the fire water tank. LRA Section B2.1.16, One-time Inspection, has been revised to include a one-time inspection of the firewater tank bottom using nonintrusive volumetric examination technique prior to the period of extended operation. See revised LRA Sections A1.13, A1.16, Table A4-1, B2.1.13, and B2.1.16 in Enclosure 2.
Plant procedures require that any degradation observed during inspection activities be entered into the corrective action program. As discussed in License Renewal
 
Application Section B2.1.13, several exampl es of degradation or corrosion of fire water system including through wall leaks have occurr ed. These deficiencies were promptly PG&E Letter DCL-10-134 Page 2 of 5 corrected and did not affect the fire water system intended function. Corrective actions and preventive measures have been developed in response to plant-specific operating experience on firewater components to ensure their license renewal intended function is maintained. DCPP corrective actions taken to resolve above grade firewater
 
piping/hydrant leakage operating experience include piping replacement with current design specified materials; for example, duc tile iron replaces cast iron pipe, polyvinyl chloride pipe replaces asbestos cement pi pe, and new fire hydrants installed when degradation is identified. Planned buried pipe replacement will evaluate use of cathodic protection based on pipe and soil excavation findings. 
 
The plant specific visual inspection interv al is determined by engineering evaluation of the fire protection piping to ensure that degradation is detected before the loss of intended function. As discussed above, the current DCPP above grade firewater piping visual inspection frequency is 18 months. The ability of the fire water system to perform
 
its intended function is periodically reviewed as part of plant health review process. In accordance with NUREG-1801, XI.M27, Fire Water System, the above grade visual inspection frequency is evaluated in response to plant specific and industrial operating experience to ensure this frequency is adequate for the fire water system above grade
 
piping to perform its intended function.
 
PG&E is currently revising the Buried and Underground Piping and Tanks Program as part of its response to the NRC's RAI Set 29, RAI B2.1.18-2 (Follow-up). This response
 
will also address below grade fire water piping inspections and frequencies. This
 
response will be submitted no later then November 30, 2010.
 
PG&E Letter DCL-10-134 Page 3 of 5 RAI B2.1.13-4
 
In its August 17, 2010, response to RAI B2.1.
13-4, the applicant prov ided details of the methodology and inspection techniques used for t he firewater tank. However, the staff was unclear if the underside of the tank wa s accessible for the inspections described.  
 
Discussion
:
PG&E agreed to supplement its response to RA I B2.1.13-4 to clarify how the underside of firewater tank will be inspected.  
 
PG&E Supplemental Response to Question B2.1.13-4 The underside of the firewater tank is inaccessi ble for visual inspection. PG&E routinely performs visual inspections of the firewater t ank internals, as stated previously in PG&E Letter DCL-10-101 dated August 17, 2010. Rec ent dive inspections have found the firewater tank bottom to be in good condition.
PG&E is currently scheduled to refurbish the firewater tank in 2011. The tank re furbishment will perform ultrasonic thickness (UT) thickness measurements of the fire water tank bottom. PG&E will evaluate UT measurement results and take appropriate corre ctive action to manage aging effects.  
 
PG&E will perform an additional one-time UT exam ination of the tank bottom during the 10 years period prior to entering the period of extended operation to conf irm its integrity.
License Renewal Application (LRA) Table A4-1 has been revised to state that PG&E will  
 
perform a one-time inspection of the firewater tank bottom using non-intrusive  
 
volumetric examination technique. LRA Sect ion B2.1.13 has been revised to clarify that the Fire Water System Aging Management Program will be used to manage the overall aging of the fire water tank. LRA Secti on B2.1.16, One-time Inspection, has been revised to include a one-time inspection of t he firewater tank bottom using nonintrusive volumetric examination technique prior to the period of extended operation. See revised LRA Sections A1.13, A1.16, Table A4-1, B2.1.13, and B2.1.16 in Enclosure 2.
PG&E Letter DCL-10-134 Page 4 of 5 RAI B2.1.16-1
 
In its July 7, 2010, response to RAI B2.1.
16-1, the applicant provided details of the sampling procedure that will be used for the One-Time Inspection Program. However, the staff was unclear on the basis for the sampling sizes selected for the various aging
 
effects.
 
Discussion
:
PG&E agreed to supplement its response to RAI B2.1.16-1 to provide additional information on the basis for the sampling size and criteria for the program.  


Enclosure 1 PG&E Letter DCL-10-134 Page 4 of 5 RAI B2.1.16-1 In its July 7, 2010, response to RAI B2.1.16-1, the applicant provided details of the sampling procedure that will be used for the One-Time Inspection Program. However, the staff was unclear on the basis for the sampling sizes selected for the various aging effects.
Discussion:
PG&E agreed to supplement its response to RAI B2.1.16-1 to provide additional information on the basis for the sampling size and criteria for the program.
PG&E Supplemental Response to Question B2.1.16-1 PG&E letter DCL-10-073 dated June 7, 2010, provided a response to NRC Request for Additional Information (RAI) B2.1.16-1. The basis for the sampling size and criteria for the program are noted below.
PG&E Supplemental Response to Question B2.1.16-1 PG&E letter DCL-10-073 dated June 7, 2010, provided a response to NRC Request for Additional Information (RAI) B2.1.16-1. The basis for the sampling size and criteria for the program are noted below.
One-Time Inspection - Water Chemistry
One-Time Inspection - Water Chemistry The Diablo Canyon Power Plant (DCPP) One-Time Inspection (OTI) Program will verify the effectiveness of the Water Chemistry Program at managing material loss by identifying a population for each in-scope system based on the most susceptible material within the system (i.e. carbon steel in feedwater system, stainless steel in chemical and volume control system) at stagnant locations where the full effect of a Water Chemistry Program may not be achieved. A sample of 10 percent of the stagnant locations, with the most susceptible material type suitable for ultrasonic thickness examination will be selected for each in-scope system per unit. The OTI Program will take credit for volumetric examinations performed under other Aging Management Program (AMP), such as flow-accelerated corrosion, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation.
 
The DCPP OTI Program will verify the effectiveness of the Water Chemistry Program at managing cracking of stainless steel with temperatures greater than 140°F by identifying the population of components within in-scope systems that are at stagnant locations where the full benefit of effective Water Chemistry Program may not be achieved. A sample of 10 percent of this population of stainless steel greater than 140°F in stagnant to low flow locations will be inspected using ultrasonic techniques appropriate to detect cracking. The OTI Program will take credit for volumetric examinations performed under other AMPs, such as Class 1 small bore and in service inspection, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation. In addition to the 10 percent sample of stainless steel greater than 140°F in stagnant locations, DCPP OTI Program will
The Diablo Canyon Power Plant (DCPP) One-Time Inspection (OTI) Program will verify the effectiveness of the Water Chemistr y Program at managing material loss by identifying a population for each in-scope system based on the most susceptible material within the system (i.e. carbon steel in feedwater system, stainless steel in chemical and volume control system) at stagnant locations where the full effect of a Water Chemistry Program may not be achiev ed. A sample of 10 percent of the stagnant locations, with the most susceptible material type suitable for ultrasonic thickness examination will be selected for each in-scope system per unit. The OTI  
 
Program will take credit for volumetric examinations performed under other Aging Management Program (AMP), such as flow-accelerated corrosion, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation.  
 
The DCPP OTI Program will verify the effectiv eness of the Water Chemistry Program at managing cracking of stainless steel with temperatures greater than 140
°F by identifying the population of components within in-scope system s that are at stagnant locations where the full benefit of effect ive Water Chemistry Program may not be achieved. A sample of 10 percent of this population of stainless steel greater than 140°F in stagnant to low flow locations will be inspected using ultrasonic techniques appropriate to detect cracking. The OTI Program will take credit for volumetric  


examinations performed under other AMPs, su ch as Class 1 small bore and in service inspection, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation. In addition to the 10 percent sample of stainless steel greater than 140
Enclosure 1 PG&E Letter DCL-10-134 Page 5 of 5 perform 100 percent eddy current testing of stainless steel tubes in one nonregenerative heat exchanger.
°F in stagnant locations, DCPP OTI Program will PG&E Letter DCL-10-134 Page 5 of 5 perform 100 percent eddy current testing of stainless steel tubes in one nonregenerative heat exchanger.
The DCPP OTI Program will verify the effectiveness of the Water Chemistry Program at managing fouling of heat exchanger tubes exposed to treated water by performing a visual examination of one heat exchanger per in-scope system, function, and material/environment combination per unit. Consideration of inspectability and radiological concerns will factor into selecting heat exchangers for this sample.
One-Time Inspection - Fuel Oil Chemistry The DCPP OTI Program will verify the effectiveness of the Fuel Chemistry Program at managing material loss by identifying a population of components within the diesel generator system (DG) and DG fuel transfer system, which are stagnant at lower elevations that may permit the accumulation of water. A sample of 10 percent of carbon steel piping components identified in the DG system for each diesel as being stagnant and at a an elevation that would permit water accumulation will be examined using volumetric nondestructive examination techniques. In addition to the piping sample, stainless steel fuel oil priming tank bottoms will be volumetrically examined and carbon steel fuel oil day tanks that permit access to the inside surface of the tank bottom will be volumetrically examined to the extent accessible. A sample of 10 percent of carbon steel piping components identified in the DG fuel transfer system for each unit will be volumetrically inspected within the 10 years prior to the period of extended operation.
One-Time Inspection - Lubricating Oil Analysis The DCPP OTI Program will verify the effectiveness of the Lubricating Oil Analysis Program at managing material loss by performing volumetric or visual examinations of one heat exchanger per in-scope system and function per unit. For example, one copper alloy centrifugal charging pump lube oil cooler per unit out of a population of two coolers per unit will be examined. This sample selection would include aluminum, copper alloy, and carbon steel heat exchanger shells.


The DCPP OTI Program will verify the effectiv eness of the Water Chemistry Program at managing fouling of heat exchanger tubes exposed to treated water by performing a visual examination of one heat exchanger per in-scope system, function, and material/environment combination per uni
PG&E Letter DCL-10-134 Page 1 of 8 LRA Amendment 23 LRA Section               RAI A1.13             B2.1.13-4 A1.16             B2.1.13-4 B2.1.13             B2.1.13-4 B2.1.16             B2.1.13-4 Table A4-1           B2.1.13-4 Appendix A PG&E Letter DCL-10-134                           Final Safety Analysis Report Supplement Page 2 of 8 A1.13           Fire Water System The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection systems. Internal and external inspections and tests of fire protection equipment are performed considering applicable National Fire Protection Association (NFPA) codes and standards. The fire water system is managed by performing routine preventive maintenance, inspections, and testing; operator rounds, performance monitoring, and reliance on the corrective action program; and system improvements to address aging and obsolescence issues.
: t. Consideration of inspectability and radiological concerns will factor into sele cting heat exchangers for this sample. 
The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide full coverage of the equipment it protects.
 
Either periodic non-intrusive volumetric examinations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confirm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and (2) the inner diameter of the piping as it applies to the design flow of the fire protection system. The volumetric examination technique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current.
One-Time Inspection - Fuel Oil Chemistry
Inspections of the firewater tank will be performed to detect loss of material.
 
Appendix A PG&E Letter DCL-10-134                         Final Safety Analysis Report Supplement Page 3 of 8 A1.16         One-Time Inspection The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (A1.2), Fire Water System program (A1.13), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer. The One-Time Inspection program determines non-destructive examination sample size for each material-environment group using an engineered sampling technique for each material-environment group based on criteria such as the longest service period, most severe operating conditions, lowest design margins, lowest or stagnant flow conditions, high flow conditions, and highest temperature. The One-Time Inspection program evaluates unacceptable inspection results using the corrective action program.
The DCPP OTI Program will verify the effectiv eness of the Fuel Chemistry Program at managing material loss by identifying a popul ation of components within the diesel generator system (DG) and DG fuel trans fer system, which are stagnant at lower elevations that may permit the accumulation of water. A sample of 10 percent of carbon steel  piping components identified in the DG system for each diesel as being stagnant and at a an elevation that would permit water accumulation will be examined using
This new program will be implemented and completed during the 10-year period prior to the period of extended operation. Industry and plant-specific operating experience will be evaluated in the development and implementation of this program.
 
Appendix B PG&E Letter DCL-10-134                             AGING MANAGEMENT PROGRAMS Page 4 of 8 B2.1.13 Fire Water System Program Description The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection systems. Internal and external inspections and tests of fire protection equipment are performed in accordance with applicable National Fire Protection Association (NFPA) codes and standards. The fire water system is managed by performing routine preventive maintenance, inspections, and testing; operator rounds, performance monitoring, and reliance on the corrective action program; and system improvements to address aging and obsolescence issues.
volumetric nondestructive examination techniques. In addition to the piping sample, stainless steel fuel oil priming tank botto ms will be volumetrically examined and carbon steel fuel oil day tanks that permit access to the inside surface of the tank bottom will be volumetrically examined to the extent acce ssible. A sample of 10 percent of carbon steel piping components identified in the DG fuel transfer system for each unit will be volumetrically inspected within the 10 year s prior to the period of extended operation.
The following are activities performed by the Fire Water System program:
 
Testing:
One-Time Inspection - Lubricating Oil Analysis
A fire water system flow test is performed at least every three years in accordance with plant procedures meeting requirements of NFPA 25. Hydraulic pump curves are obtained and compared with baseline curves to determine operability. During the Fire Water System flow test, parameters directly monitored are static pressure and velocity head.
 
The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide full coverage of the equipment it protects.
The DCPP OTI Program will verify the effe ctiveness of the Lubricating Oil Analysis Program at managing material loss by performing volumetric or visual examinations of one heat exchanger per in-scope system and function per unit. For example, one copper alloy centrifugal charging pump lube oil cooler per unit out of a population of two coolers per unit will be examined. This sa mple selection would include aluminum, copper alloy, and carbon steel heat exchanger shells. 
The Fire Water System program will be enhanced so sprinkler heads in service for 50 years will be replaced or representative samples from one or more sample areas will be tested in accordance with NFPA 25. Test procedures will be repeated at 10-year intervals during the period of extended operation, for sprinklers that were not replaced prior to being in service for 50 years to ensure that signs of degradation, such as corrosion, are detected prior to the loss of intended function.
 
The Fire Water System program conducts a water flow test through each open spray nozzle of the transformer deluge system periodically to verify that each nozzle is unobstructed. Water is flowed through the test valves of the deluge system periodically to ensure freedom from blockage.
PG&E Letter DCL-10-134  
Fire water is flowed from the Raw Water Storage Reservoir periodically to verify the system piping is capable of delivering the design flow rate.
 
Page 1 of 8  
 
LRA Amendment 23 LRA Section RAI A1.13 B2.1.13-4 A1.16 B2.1.13-4 B2.1.13 B2.1.13-4 B2.1.16 B2.1.13-4 Table A4-1 B2.1.13-4 PG&E Letter DCL-10-134  
 
Page 2 of 8 Appendix A Final Safety Analysis Report Supplement A1.13 Fire Water System The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection system
: s. Internal and external inspections and tests of fire protection equipment are per formed considering applicable National Fire Protection Association (NFPA) codes and standar ds. The fire water system is managed by performing routine preventive maintenanc e, inspections, and testing; operator rounds, performance monitoring, and relianc e on the corrective action program; and system improvements to address aging and obsolescence issues.
The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide fu ll coverage of the equipment it protects.
Either periodic non-intrusive volumetric ex aminations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confi rm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and  
 
(2) the inner diameter of the piping as it app lies to the design flow of the fire protection system. The volumetric examination te chnique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current. Inspections of the firewater tank will be performed to detect loss of material.
 
PG&E Letter DCL-10-134  
 
Page 3 of 8 Appendix A Final Safety Analysis Report Supplement A1.16 One-Time Inspection The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (A1.2), Fire Water System program (A1.13), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cra cking, and reduction of heat transfer. The One-Time Inspection program determines non-des tructive examination sample size for each material-environment group using an engineered sampling technique for each  
 
material-environment group based on criteria su ch as the longest service period, most severe operating conditions, lowest design marg ins, lowest or stagnant flow conditions, high flow conditions, and highest temperatur
: e. The One-Time Inspection program evaluates unacceptable inspection result s using the corrective action program.
This new program will be implemented and comple ted during the 10-year period prior to the period of extended operation. Industr y and plant-specific operating experience will be evaluated in the development and im plementation of this program.
PG&E Letter DCL-10-134  
 
Page 4 of 8 Appendix B AGING MANAGEMENT PROGRAMS B2.1.13 Fire Water System Program Description The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection system
: s. Internal and external inspections and tests of fire protection equipment are perfo rmed in accordance with applicable National Fire Protection Association (NFPA) codes and standards. The fire water system is  
 
managed by performing routine preventive ma intenance, inspections, and testing; operator rounds, performance monitoring, and reliance on the corrective action program; and system improvements to address aging and obsolescence issues.
The following are activities performed by the Fire Water System program:  
 
Testing: A fire water system flow test is performed at least every three years in accordance with plant procedures meeting requirements of NFPA 25. Hydraulic pump curves are obtained and compared with baseline curves to determine operability. During the Fire Water System flow test, parameters directly monitored are static pressure and velocity head. The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide fu ll coverage of the equipment it protects.
The Fire Water System program will be enhanced so sprinkler heads in service for 50  
 
years will be replaced or repres entative samples from one or more sample areas will be tested in accordance with NFPA 25. Te st procedures will be repeated at 10-year intervals during the period of extended operation, for sprinklers that were not replaced prior to being in service for 50 years to ensure that signs of degradation, such as corrosion, are detected prior to the loss of intended function.
The Fire Water System program conducts a water flow test through each open spray nozzle of the transformer deluge system periodically to verify that each nozzle is  
 
unobstructed. Water is flowed through the te st valves of the deluge system periodically to ensure freedom from blockage.
Fire water is flowed from the Raw Water St orage Reservoir periodically to verify the system piping is capable of delivering the design flow rate.
The portable diesel driven fire pumps are tested periodically under full load/full flow conditions.
The portable diesel driven fire pumps are tested periodically under full load/full flow conditions.
DCPP performs a hydrostatic test of its indoor fire hoses at least every three years, while outdoor fire hoses are tested at least annually. Fire hoses that are inaccessible  
DCPP performs a hydrostatic test of its indoor fire hoses at least every three years, while outdoor fire hoses are tested at least annually. Fire hoses that are inaccessible during normal plant operations are tested every refueling outage.
 
Appendix B PG&E Letter DCL-10-134                               AGING MANAGEMENT PROGRAMS Page 5 of 8 Inspections:
during normal plant operations ar e tested every refueling outage.
Either periodic non-intrusive volumetric examinations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confirm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and (2) the inner diameter of the piping as it applies to the design flow of the fire protection system. The volumetric examination technique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current.
PG&E Letter DCL-10-134  
The Fire Water System program performs periodic visual inspections of main fire system piping, yard loop fire hydrants, hose reel headers, hose stations, portable diesel driven fire pump hoses, fire hoses, gaskets, water spray headers, sprinkler system headers, water spray nozzles, and sprinkler heads, and tank to verify they are free of significant corrosion, foreign materials, biofouling, and physical damage. Tank internal inspection is performed by divers using video and the tank is cleaned as needed at five year frequency. A one-time UT examination of the fire water tank bottom will be performed as part of the One-Time Inspection aging management program, LRA Section B2.1.16.
 
DCPP performs a visual inspection of its indoor hose station gaskets once every 18 months, except hose stations in high radiation areas and the containment buildings which are tested during refueling outages. This inspection ensures that the gaskets have a satisfactory fit with no defects.
Page 5 of 8 Appendix B AGING MANAGEMENT PROGRAMS Inspections:
Fire detection instruments located in safety related power block structures, which are accessible during plant operation, are demonstrated to be operable at least once per six months by testing and surveillance activities. For fire detection instruments located in safety related power block structures which are not accessible during plant operation, operability is demonstrated during each cold shutdown exceeding 24 hours, unless performed in the last six months.
Either periodic non-intrusive volumetric ex aminations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confi rm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and  
Appendix B PG&E Letter DCL-10-134                             AGING MANAGEMENT PROGRAMS Page 6 of 8 B2.1.16 One-Time Inspection Program Description The One-Time Inspection (OTI) program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (B2.1.2), Fire Water System program (B2.1.13), Fuel Oil Chemistry program (B2.1.14),
 
and Lubricating Oil Analysis program (B2.1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer.
(2) the inner diameter of the piping as it app lies to the design flow of the fire protection system. The volumetric examination tec hnique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current.
The DCPP OTI Program is a new program that will be implemented by DCPP prior to the period of extended operation. The DCPP OTI Program provides measures for detecting the aging effects prior to loss of intended function, but does not prevent degradation due to aging effects.
The Fire Water System program performs per iodic visual inspections of main fire system piping, yard loop fire hydrants, hose reel headers, hose stations, portable diesel driven fire pump hoses, fire hoses, gaske ts, water spray headers, sprinkler system headers, water spray nozzles, and sprinkler heads , and tank to verify they are free of significant corrosion, foreign materi als, biofouling, and physical damage.
Plant system piping and components identified in the OTI procedure will be subject to OTI using inspection personnel qualified consistent with the ASME Section XI Code and 10 CFR 50, Appendix B. These inspection personnel will follow American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code, Section V, Nondestructive Examination (NDE), using NDE techniques appropriate to each inspection. NDE acceptance criteria will be consistent with the design codes/standards or ASME Section XI as applicable to the component for each one-time inspection.
Tank internal inspection is performed by divers using video and the tank is cleaned as needed at five year frequency. A one
Inspection sample sizes will be determined based on an assessment of materials of fabrication, environment, plausible aging effects and mechanisms, and operating experience. The OTI program determines NDE sample size for each material-environment group using an engineered sampling technique for each material-environment group based on criteria such as the longest service period, most severe operating conditions, lowest design margins, lowest or stagnant flow conditions, high flow conditions, and highest temperature. Component selection will be performed by the system engineer or other knowledgeable personnel. When evidence of an aging effect is revealed by a one-time inspection, the engineering evaluation of the inspection results would identify appropriate corrective actions.
-time UT examination of the fire water tank bottom will be performed as part of the One-Time Inspection aging management program, LRA Section B2.1.16.
The OTI inspections will be performed during the 10 years prior to the period of extended operation. All one-time inspections will be completed prior to the period of extended operation. Completion of the OTI Program in this time period will ensure that confirmation of the absence of aging effects is based upon inspection of components that have aged for at least 30 years.
DCPP performs a visual inspection of its indoor hose station gaskets once every 18 months, except hose stations in high radi ation areas and the containment buildings which are tested during refueling outages. Th is inspection ensures that the gaskets have a satisfactory fit with no defects.
Major elements of the DCPP OTI Program will include:
Fire detection instruments located in safety related power block structures, which are accessible during plant operation, are demonstr ated to be operable at least once per six months by testing and surveillance activities.
a) Identifying piping and component populations subject to OTI based on common materials and environments, Appendix B PG&E Letter DCL-10-134                           AGING MANAGEMENT PROGRAMS Page 7 of 8 b) Determining the sample size of components to inspect for each material-environment group, c) Selecting piping and components within the material-environment groups for inspection based on service period, plausible aging effects, operating conditions and design margins, d) Conducting one-time inspections of the selected components using ASME Code Section V NDE inspection techniques and acceptance criteria effective in detecting aging effects of interest, e) An one time UT examination of the firewater tank bottom will be performed.
For fire detection instruments located in safety related power block structures whic h are not accessible during plant operation, operability is demonstrated during each cold shutdown exceeding 24 hours, unless performed in the last six months.
ef) Evaluating unacceptable inspection results using the corrective action program.
PG&E Letter DCL-10-134  
Table A4-1 PG&E Letter DCL-10-134                                               License Renewal Commitments Page 8 of 8 Table A4-1 License Renewal Commitments Item #                     Commitment                       LRA     Implementati Section   on Schedule A one time UT examination of the firewater                 During the 10 tank bottom will be performed as part of the               years prior to the 51                                                        B2.1.16 period of One-Time Inspection aging management                       extended program, LRA Section B2.1.16.                             operation}}
 
Page 6 of 8 Appendix B AGING MANAGEMENT PROGRAMS B2.1.16 One-Time Inspection Program Description The One-Time Inspection (OTI) program conduc ts one-time inspections of plant system piping and components to verify the effect iveness of the Water Chemistry program (B2.1.2), Fire Water System program (B2.1.13), Fuel Oil Chemistry program (B2.1.14), and Lubricating Oil Analysis program (B2.1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer.
The DCPP OTI Program is a new program that will be implemented by DCPP prior to the period of extended operation. The DC PP OTI Program provides measures for detecting the aging effects prior to loss of intended function, but does not prevent degradation due to aging effects.
Plant system piping and components identified in the OTI procedure will be subject to OTI using inspection personnel qualified cons istent with the ASME Section XI Code and 10 CFR 50, Appendix B. These inspection personnel will follow American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code, Section V, Nondestructive Examination (NDE), us ing NDE techniques appropriate to each inspection. NDE acceptance criteria will be consistent with the design codes/standards or ASME Section XI as applicable to t he component for each one-time inspection.
Inspection sample sizes will be determined based on an assessment of materials of fabrication, environment, plausible agi ng effects and mechanisms, and operating experience. The OTI program determines NDE sample size for each material-environment group using an engineered sampling technique for each material-
 
environment group based on criteria such as the longest service period, most severe operating conditions, lowest design margins, lowest or stagnant flow conditions, high flow conditions, and highest temperature.
Component selection will be performed by the system engineer or other knowledgeable per sonnel. When evidence of an aging effect is revealed by a one-time inspection, the engineering evaluation of the inspection results would identify appropriate corrective actions.
The OTI inspections will be performed during the 10 years prior to the period of extended operation. All one-time inspections will be completed prior to the period of extended operation. Completion of the OTI Pr ogram in this time period will ensure that confirmation of the absence of aging effe cts is based upon inspection of components that have aged for at least 30 years.
Major elements of the DCPP OTI Program will include:  
 
a) Identifying piping and component populat ions subject to OTI based on common materials and environments, PG&E Letter DCL-10-134  
 
Page 7 of 8 Appendix B AGING MANAGEMENT PROGRAMS b) Determining the sample size of components to inspect for each material-environment group, c) Selecting piping and components within the material-environment groups for inspection based on service period, plausible aging effects, operating conditions and design margins, d) Conducting one-time inspections of the selected components using ASME Code Section V NDE inspection techniques and acc eptance criteria effective in detecting aging effects of interest, e) An one time UT examination of the firewater tank bottom will be performed.
e f) Evaluating unacceptable inspection result s using the corrective action program.  
 
PG&E Letter DCL-10-134  
 
Page 8 of 8 Table A4-1 License Renewal Commitments Table A4-1 License Renewal Commitments Item # Commitment LRA Section Implementati on Schedule 51 A one time UT examination of the firewater tank bottom will be performed as part of the One-Time Inspection aging management program, LRA Section B2.1.16.
B2.1.16 During the 10 years prior to the period of extended operation}}

Revision as of 06:59, 13 November 2019

Response to NRC Letter 09/28/2010, Summary of Telephone Conference Call Held on 09/02/2010, Between NRC & Pacific Gas and Electric Company Concerning Responses to Requests for Additional Information Related to License Renewal
ML103020164
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/27/2010
From: Becker J
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
DCL-10-134
Download: ML103020164 (15)


Text

Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/ 5/ 601

p. O. Box 56 Avila Beach, CA93424 805.545.3462 October 27, 2010 Internal: 691.3462 Fax: 805.545. 6445 PG&E Letter DCL-10-134 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20852 Docket No. 50-275, OL-DPR-80 Docket No. 50-323 , OL-DPR-82 Diablo Canyon Un its 1 and 2 Response to NRC Letter dated September 28. 2010. Summary of Telephone Conference Call Held on September 2. 2010. Between the U.S. Nuclear Regulatory Commission and Pacific Gas and Electric Company Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant. Units 1 and 2. License Renewal Application

Dear Commissioners and Staff:

By letter dated November 23, 2009, Pacific Gas and Electric Company (PG&E) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP) Units 1 and 2, respectively. The application included the license renewal application (LRA) and Applicant's Environmental Report - Operating License Renewal Stage.

By letter dated September 28 , 2010, the NRC staff sent a summary of a telephone conference between the NRC and representatives of Pacific Gas and Electric Company held on September 2, 2010. This telephone conference was to obtain clarification on the applicant's response to request for additional information (RAI) submitted to the NRC in letters dated June 3, 2010 , July 7, 2010, and August 17, 2010, regarding fire water and One-Time Inspection Aging Management Programs.

PG&E's supplemental information to the RAI response for which the staff requested clarification is provided in Enclosure 1. LRA Amendment 23 resulting from the responses is included in Enclosure 2 showing the changed pages with line-in/line-out annotations. Other follow-up RAls, determined by the NRC staff to be necessary will be issued separately by a formal letter.

PG&E makes a commitment in revised LRA Table A4-1, License Renewal Commitments, shown in Enclosure 2.

A member of the STARS (Strategic Teamin g and Resource Sharing) Alliance Callaway . Comanche Peak . Di ablo Canyon . Palo Ve rd e. San Onofre . South Te xa s Proj ect . Wolf Cree k

Document Control Desk PG&E Letter DCL-10-134 October 27,2010 Page 2 If you have any questions regarding this response, please contact Mr. Terence L. Grebel, License Renewal Project Manager, at (805) 545-4160.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 27, 2010.

Site Vice President TLG/50347222 Enclosures cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Regional Administrator Nathanial Ferrer, NRC Project Manager, License Renewal Kimberly J. Green, NRC Project Manager, License Renewal Fred Lyon, NRC Project Manager, Office of Nuclear Reactor Regulation Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRC Project Manager, License Renewal A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Comanche Peak. Diablo Canyon. Palo Verde. San Onofre

  • South Te x as Project. Wolf Creek

Enclosure 1 PG&E Letter DCL-10-134 Page 1 of 5 PG&E Response to NRC Letter dated September 28, 2010, Summary of Telephone Conference Call Held on September 2, 2010, Concerning Responses to Requests for Additional Information (Set 1, 4, and 12)

Related to the Diablo Canyon License Renewal Application RAI B2.1.13-2 In its June 3, 2010, response to RAI B2.1.13-2, the applicant provided details of the basis for maintaining the 18-month inspection frequency for Fire Water System Program. However, the staff was unclear how the operating experience was applied as part of the basis for the inspection frequency.

Discussion:

PG&E agreed to supplement its response to RAI B2.1.13-2 to clarify how operating experience was considered as part of the basis for the 18-month inspection frequency.

PG&E Supplemental Response to Question B2.1.13-2 PG&E letter DCL-10-057 dated June 3, 2010, provided a response to NRC Request for Additional Information (RAI) B2.1.13-2. The response to this RAI revises/supplements the previously provided information on inspection frequency for above grade fire water piping and below grade fire water piping.

Above grade Diablo Canyon Power Plant (DCPP) fire water piping is visually inspected for early indications of aging effects (such as material wastage, pitting, blistering, or porosity) on an 18-month frequency. In addition, the firewater yard loop and underground feeds are flushed semi-annually. The flowing water removes accumulated debris and/or sediment which can be indicative of internal pipe aging. The firewater system is flow tested at least every three years in order to verify firewater system design and National Fire Protection Association test requirements.

These testing frequencies are performed to satisfy DCPP equipment control guidelines (ECGs), which were relocated from the DCPP Technical Specifications. Per License Amendments 74 and 75 for Units 1 and 2, respectively, NRC approved DCPP's request to relocate the fire protection Technical Specifications and associated bases to the ECGs. Therefore, DCPP's testing frequencies are in compliance with the licensing basis previously approved by NRC.

Plant procedures require that any degradation observed during inspection activities be entered into the corrective action program. As discussed in License Renewal Application Section B2.1.13, several examples of degradation or corrosion of fire water system including through wall leaks have occurred. These deficiencies were promptly

Enclosure 1 PG&E Letter DCL-10-134 Page 2 of 5 corrected and did not affect the fire water system intended function. Corrective actions and preventive measures have been developed in response to plant-specific operating experience on firewater components to ensure their license renewal intended function is maintained. DCPP corrective actions taken to resolve above grade firewater piping/hydrant leakage operating experience include piping replacement with current design specified materials; for example, ductile iron replaces cast iron pipe, polyvinyl chloride pipe replaces asbestos cement pipe, and new fire hydrants installed when degradation is identified. Planned buried pipe replacement will evaluate use of cathodic protection based on pipe and soil excavation findings.

The plant specific visual inspection interval is determined by engineering evaluation of the fire protection piping to ensure that degradation is detected before the loss of intended function. As discussed above, the current DCPP above grade firewater piping visual inspection frequency is 18 months. The ability of the fire water system to perform its intended function is periodically reviewed as part of plant health review process. In accordance with NUREG-1801, XI.M27, Fire Water System, the above grade visual inspection frequency is evaluated in response to plant specific and industrial operating experience to ensure this frequency is adequate for the fire water system above grade piping to perform its intended function.

PG&E is currently revising the Buried and Underground Piping and Tanks Program as part of its response to the NRCs RAI Set 29, RAI B2.1.18-2 (Follow-up). This response will also address below grade fire water piping inspections and frequencies. This response will be submitted no later then November 30, 2010.

Enclosure 1 PG&E Letter DCL-10-134 Page 3 of 5 RAI B2.1.13-4 In its August 17, 2010, response to RAI B2.1.13-4, the applicant provided details of the methodology and inspection techniques used for the firewater tank. However, the staff was unclear if the underside of the tank was accessible for the inspections described.

Discussion:

PG&E agreed to supplement its response to RAI B2.1.13-4 to clarify how the underside of firewater tank will be inspected.

PG&E Supplemental Response to Question B2.1.13-4 The underside of the firewater tank is inaccessible for visual inspection. PG&E routinely performs visual inspections of the firewater tank internals, as stated previously in PG&E Letter DCL-10-101 dated August 17, 2010. Recent dive inspections have found the firewater tank bottom to be in good condition. PG&E is currently scheduled to refurbish the firewater tank in 2011. The tank refurbishment will perform ultrasonic thickness (UT) thickness measurements of the firewater tank bottom. PG&E will evaluate UT measurement results and take appropriate corrective action to manage aging effects.

PG&E will perform an additional one-time UT examination of the tank bottom during the 10 years period prior to entering the period of extended operation to confirm its integrity.

License Renewal Application (LRA) Table A4-1 has been revised to state that PG&E will perform a one-time inspection of the firewater tank bottom using non-intrusive volumetric examination technique. LRA Section B2.1.13 has been revised to clarify that the Fire Water System Aging Management Program will be used to manage the overall aging of the fire water tank. LRA Section B2.1.16, One-time Inspection, has been revised to include a one-time inspection of the firewater tank bottom using nonintrusive volumetric examination technique prior to the period of extended operation. See revised LRA Sections A1.13, A1.16, Table A4-1, B2.1.13, and B2.1.16 in Enclosure 2.

Enclosure 1 PG&E Letter DCL-10-134 Page 4 of 5 RAI B2.1.16-1 In its July 7, 2010, response to RAI B2.1.16-1, the applicant provided details of the sampling procedure that will be used for the One-Time Inspection Program. However, the staff was unclear on the basis for the sampling sizes selected for the various aging effects.

Discussion:

PG&E agreed to supplement its response to RAI B2.1.16-1 to provide additional information on the basis for the sampling size and criteria for the program.

PG&E Supplemental Response to Question B2.1.16-1 PG&E letter DCL-10-073 dated June 7, 2010, provided a response to NRC Request for Additional Information (RAI) B2.1.16-1. The basis for the sampling size and criteria for the program are noted below.

One-Time Inspection - Water Chemistry The Diablo Canyon Power Plant (DCPP) One-Time Inspection (OTI) Program will verify the effectiveness of the Water Chemistry Program at managing material loss by identifying a population for each in-scope system based on the most susceptible material within the system (i.e. carbon steel in feedwater system, stainless steel in chemical and volume control system) at stagnant locations where the full effect of a Water Chemistry Program may not be achieved. A sample of 10 percent of the stagnant locations, with the most susceptible material type suitable for ultrasonic thickness examination will be selected for each in-scope system per unit. The OTI Program will take credit for volumetric examinations performed under other Aging Management Program (AMP), such as flow-accelerated corrosion, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation.

The DCPP OTI Program will verify the effectiveness of the Water Chemistry Program at managing cracking of stainless steel with temperatures greater than 140°F by identifying the population of components within in-scope systems that are at stagnant locations where the full benefit of effective Water Chemistry Program may not be achieved. A sample of 10 percent of this population of stainless steel greater than 140°F in stagnant to low flow locations will be inspected using ultrasonic techniques appropriate to detect cracking. The OTI Program will take credit for volumetric examinations performed under other AMPs, such as Class 1 small bore and in service inspection, when the above criteria is met and the exams are performed within the 10 years prior to the period of extended operation. In addition to the 10 percent sample of stainless steel greater than 140°F in stagnant locations, DCPP OTI Program will

Enclosure 1 PG&E Letter DCL-10-134 Page 5 of 5 perform 100 percent eddy current testing of stainless steel tubes in one nonregenerative heat exchanger.

The DCPP OTI Program will verify the effectiveness of the Water Chemistry Program at managing fouling of heat exchanger tubes exposed to treated water by performing a visual examination of one heat exchanger per in-scope system, function, and material/environment combination per unit. Consideration of inspectability and radiological concerns will factor into selecting heat exchangers for this sample.

One-Time Inspection - Fuel Oil Chemistry The DCPP OTI Program will verify the effectiveness of the Fuel Chemistry Program at managing material loss by identifying a population of components within the diesel generator system (DG) and DG fuel transfer system, which are stagnant at lower elevations that may permit the accumulation of water. A sample of 10 percent of carbon steel piping components identified in the DG system for each diesel as being stagnant and at a an elevation that would permit water accumulation will be examined using volumetric nondestructive examination techniques. In addition to the piping sample, stainless steel fuel oil priming tank bottoms will be volumetrically examined and carbon steel fuel oil day tanks that permit access to the inside surface of the tank bottom will be volumetrically examined to the extent accessible. A sample of 10 percent of carbon steel piping components identified in the DG fuel transfer system for each unit will be volumetrically inspected within the 10 years prior to the period of extended operation.

One-Time Inspection - Lubricating Oil Analysis The DCPP OTI Program will verify the effectiveness of the Lubricating Oil Analysis Program at managing material loss by performing volumetric or visual examinations of one heat exchanger per in-scope system and function per unit. For example, one copper alloy centrifugal charging pump lube oil cooler per unit out of a population of two coolers per unit will be examined. This sample selection would include aluminum, copper alloy, and carbon steel heat exchanger shells.

PG&E Letter DCL-10-134 Page 1 of 8 LRA Amendment 23 LRA Section RAI A1.13 B2.1.13-4 A1.16 B2.1.13-4 B2.1.13 B2.1.13-4 B2.1.16 B2.1.13-4 Table A4-1 B2.1.13-4 Appendix A PG&E Letter DCL-10-134 Final Safety Analysis Report Supplement Page 2 of 8 A1.13 Fire Water System The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection systems. Internal and external inspections and tests of fire protection equipment are performed considering applicable National Fire Protection Association (NFPA) codes and standards. The fire water system is managed by performing routine preventive maintenance, inspections, and testing; operator rounds, performance monitoring, and reliance on the corrective action program; and system improvements to address aging and obsolescence issues.

The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide full coverage of the equipment it protects.

Either periodic non-intrusive volumetric examinations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confirm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and (2) the inner diameter of the piping as it applies to the design flow of the fire protection system. The volumetric examination technique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current.

Inspections of the firewater tank will be performed to detect loss of material.

Appendix A PG&E Letter DCL-10-134 Final Safety Analysis Report Supplement Page 3 of 8 A1.16 One-Time Inspection The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (A1.2), Fire Water System program (A1.13), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer. The One-Time Inspection program determines non-destructive examination sample size for each material-environment group using an engineered sampling technique for each material-environment group based on criteria such as the longest service period, most severe operating conditions, lowest design margins, lowest or stagnant flow conditions, high flow conditions, and highest temperature. The One-Time Inspection program evaluates unacceptable inspection results using the corrective action program.

This new program will be implemented and completed during the 10-year period prior to the period of extended operation. Industry and plant-specific operating experience will be evaluated in the development and implementation of this program.

Appendix B PG&E Letter DCL-10-134 AGING MANAGEMENT PROGRAMS Page 4 of 8 B2.1.13 Fire Water System Program Description The Fire Water System program manages loss of material due to corrosion, MIC, or biofouling for water-based fire protection systems. Internal and external inspections and tests of fire protection equipment are performed in accordance with applicable National Fire Protection Association (NFPA) codes and standards. The fire water system is managed by performing routine preventive maintenance, inspections, and testing; operator rounds, performance monitoring, and reliance on the corrective action program; and system improvements to address aging and obsolescence issues.

The following are activities performed by the Fire Water System program:

Testing:

A fire water system flow test is performed at least every three years in accordance with plant procedures meeting requirements of NFPA 25. Hydraulic pump curves are obtained and compared with baseline curves to determine operability. During the Fire Water System flow test, parameters directly monitored are static pressure and velocity head.

The Fire Water System program conducts a water flow test through each open spray nozzle to verify that deluge systems provide full coverage of the equipment it protects.

The Fire Water System program will be enhanced so sprinkler heads in service for 50 years will be replaced or representative samples from one or more sample areas will be tested in accordance with NFPA 25. Test procedures will be repeated at 10-year intervals during the period of extended operation, for sprinklers that were not replaced prior to being in service for 50 years to ensure that signs of degradation, such as corrosion, are detected prior to the loss of intended function.

The Fire Water System program conducts a water flow test through each open spray nozzle of the transformer deluge system periodically to verify that each nozzle is unobstructed. Water is flowed through the test valves of the deluge system periodically to ensure freedom from blockage.

Fire water is flowed from the Raw Water Storage Reservoir periodically to verify the system piping is capable of delivering the design flow rate.

The portable diesel driven fire pumps are tested periodically under full load/full flow conditions.

DCPP performs a hydrostatic test of its indoor fire hoses at least every three years, while outdoor fire hoses are tested at least annually. Fire hoses that are inaccessible during normal plant operations are tested every refueling outage.

Appendix B PG&E Letter DCL-10-134 AGING MANAGEMENT PROGRAMS Page 5 of 8 Inspections:

Either periodic non-intrusive volumetric examinations or visual inspections will be performed on firewater piping. Non-intrusive volumetric examinations would detect loss of material due to corrosion, and would confirm wall thickness is within acceptable limits so that aging will be detected before the loss of intended function. Visual inspections would evaluate (1) wall thickness as it applies to avoidance of catastrophic failure, and (2) the inner diameter of the piping as it applies to the design flow of the fire protection system. The volumetric examination technique employed will be one that is generally accepted in the industry, such as ultrasonic or eddy current.

The Fire Water System program performs periodic visual inspections of main fire system piping, yard loop fire hydrants, hose reel headers, hose stations, portable diesel driven fire pump hoses, fire hoses, gaskets, water spray headers, sprinkler system headers, water spray nozzles, and sprinkler heads, and tank to verify they are free of significant corrosion, foreign materials, biofouling, and physical damage. Tank internal inspection is performed by divers using video and the tank is cleaned as needed at five year frequency. A one-time UT examination of the fire water tank bottom will be performed as part of the One-Time Inspection aging management program, LRA Section B2.1.16.

DCPP performs a visual inspection of its indoor hose station gaskets once every 18 months, except hose stations in high radiation areas and the containment buildings which are tested during refueling outages. This inspection ensures that the gaskets have a satisfactory fit with no defects.

Fire detection instruments located in safety related power block structures, which are accessible during plant operation, are demonstrated to be operable at least once per six months by testing and surveillance activities. For fire detection instruments located in safety related power block structures which are not accessible during plant operation, operability is demonstrated during each cold shutdown exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless performed in the last six months.

Appendix B PG&E Letter DCL-10-134 AGING MANAGEMENT PROGRAMS Page 6 of 8 B2.1.16 One-Time Inspection Program Description The One-Time Inspection (OTI) program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (B2.1.2), Fire Water System program (B2.1.13), Fuel Oil Chemistry program (B2.1.14),

and Lubricating Oil Analysis program (B2.1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer.

The DCPP OTI Program is a new program that will be implemented by DCPP prior to the period of extended operation. The DCPP OTI Program provides measures for detecting the aging effects prior to loss of intended function, but does not prevent degradation due to aging effects.

Plant system piping and components identified in the OTI procedure will be subject to OTI using inspection personnel qualified consistent with the ASME Section XI Code and 10 CFR 50, Appendix B. These inspection personnel will follow American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section V, Nondestructive Examination (NDE), using NDE techniques appropriate to each inspection. NDE acceptance criteria will be consistent with the design codes/standards or ASME Section XI as applicable to the component for each one-time inspection.

Inspection sample sizes will be determined based on an assessment of materials of fabrication, environment, plausible aging effects and mechanisms, and operating experience. The OTI program determines NDE sample size for each material-environment group using an engineered sampling technique for each material-environment group based on criteria such as the longest service period, most severe operating conditions, lowest design margins, lowest or stagnant flow conditions, high flow conditions, and highest temperature. Component selection will be performed by the system engineer or other knowledgeable personnel. When evidence of an aging effect is revealed by a one-time inspection, the engineering evaluation of the inspection results would identify appropriate corrective actions.

The OTI inspections will be performed during the 10 years prior to the period of extended operation. All one-time inspections will be completed prior to the period of extended operation. Completion of the OTI Program in this time period will ensure that confirmation of the absence of aging effects is based upon inspection of components that have aged for at least 30 years.

Major elements of the DCPP OTI Program will include:

a) Identifying piping and component populations subject to OTI based on common materials and environments, Appendix B PG&E Letter DCL-10-134 AGING MANAGEMENT PROGRAMS Page 7 of 8 b) Determining the sample size of components to inspect for each material-environment group, c) Selecting piping and components within the material-environment groups for inspection based on service period, plausible aging effects, operating conditions and design margins, d) Conducting one-time inspections of the selected components using ASME Code Section V NDE inspection techniques and acceptance criteria effective in detecting aging effects of interest, e) An one time UT examination of the firewater tank bottom will be performed.

ef) Evaluating unacceptable inspection results using the corrective action program.

Table A4-1 PG&E Letter DCL-10-134 License Renewal Commitments Page 8 of 8 Table A4-1 License Renewal Commitments Item # Commitment LRA Implementati Section on Schedule A one time UT examination of the firewater During the 10 tank bottom will be performed as part of the years prior to the 51 B2.1.16 period of One-Time Inspection aging management extended program, LRA Section B2.1.16. operation