ML111540341: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
Mr. Jon A. Franke | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | ||
Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street | ATLANTA, GEORGIA 30303-1257 | ||
Crystal River, FL 34428-6708 | June 2, 2011 | ||
Mr. Jon A. Franke | |||
Vice President, Crystal River Nuclear Plant | |||
Crystal River Nuclear Plant (NA2C) | |||
15760 W. Power Line Street | |||
Crystal River, FL 34428-6708 | |||
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION | |||
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011501 | |||
Dear Mr. Franke: | |||
During the period of June 27-July 1, 2011, the NRC will conduct baseline emergency | |||
preparedness inspection activities at the Crystal River 3 Nuclear Plant. The inspection will | |||
evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection | |||
Procedures (IP) 71114.02, 71114.03, 71114.04, and 71114.05. The inspection will also review | |||
the emergency preparedness performance indicators using IP 71151. | |||
To minimize the impact to your on-site resources and to ensure a productive inspection, we | |||
have enclosed a request for documents needed for this inspection. It is important that all of | |||
these documents are up to date and complete, thereby minimizing the number of additional | |||
documents requested during the preparation and/or the onsite portions of the inspection. The | |||
inspector has requested that the subject informational material be made available to the NRC | |||
staff upon arrival on June 27, 2011. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Dennis Herrin of your organization. If there | |||
are any questions about this inspection or the material requested, please contact the lead | |||
inspector, Mark Speck at (404) 997-4759. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
FPC 2 | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Brian Bonser, Chief | |||
Plant Support Branch 1 | |||
Division of Reactor Safety | |||
Docket No.: 50-302 | |||
License No.: DPR-72 | |||
Enclosure: | |||
Emergency Preparedness Inspection Document Request List | |||
cc w/encl.: (See page 3) | |||
License No.: | |||
FPC 3 | |||
cc w/encl: Daniel R. Westcott | |||
Kelvin Henderson Supervisor | |||
General Manager Licensing & Regulatory Programs | |||
Nuclear Fleet Operations Crystal River Nuclear Plant (NA1B) | |||
Progress Energy Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
Joseph W. Donahue | |||
Brian C. McCabe Vice President | |||
Manager, Nuclear Oversight Nuclear Oversight | |||
Shearon Harris Nuclear Power Plant Progress Energy | |||
Progress Energy Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
Jack E. Huegel | |||
James W. Holt Manager, Nuclear Oversight | |||
Plant General Manager Crystal River Nuclear Plant | |||
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
David T. Conley | |||
Stephen J. Cahill Senior Counsel | |||
Director - Engineering Nuclear Legal Department | |||
Crystal River Nuclear Plant (NA2C) Progress Energy | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
R. Alexander Glenn Mark Rigsby | |||
General Counsel Manager, Support Services - Nuclear | |||
Progress Energy Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Jeffrey R. Swartz Senior Resident Inspector | |||
Director Site Operations U.S. Nuclear Regulatory Commission | |||
Crystal River Nuclear Plant Crystal River Nuclear Generating Plant | |||
Electronic Mail Distribution U.S. NRC | |||
6745 N Tallahassee Rd | |||
Donna B. Alexander Crystal River, FL 34428 | |||
Manager, Nuclear Regulatory Affairs | |||
(interim) Attorney General | |||
Progress Energy Department of Legal Affairs | |||
Electronic Mail Distribution The Capitol PL-01 | |||
Tallahassee, FL 32399-1050 | |||
Thomas Sapporito | |||
Consulting Associate Bryan Koon | |||
(Public Correspondence Only) Director | |||
Post Office Box 8413 Florida Division of Emergency Management | |||
Jupiter, FL 33468 Electronic Mail Distribution | |||
William A. Passetti Chairman | |||
Chief Board of County Commissioners | |||
Florida Bureau of Radiation Control Citrus County | |||
Department of Health 110 N. Apopka Avenue | |||
Electronic Mail Distribution Inverness, FL 36250 | |||
ML111540341 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED | |||
OFFICE RII: DRS RII: DRS | |||
SIGNATURE RA RA | |||
NAME M. SPECK B. BONSER | |||
DATE 06/01/2011 06/02/2011 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
Document Request List | |||
Inspection Dates: June 27, 2011 - July 1, 2011 | |||
Inspection Procedures: IP 71114.02 Alert and Notification System Testing | |||
IP 71114.03 Emergency Response Organization Staffing | |||
and Augmentation System | |||
IP 71114.04 Emergency Action Level and Emergency | |||
Plan Changes | |||
IP 71114.05 Correction of Emergency Preparedness | |||
Weakness | |||
IP 71151 Performance Indicator Verification | |||
Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention: | |||
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or | |||
provided to the inspector upon arrival onsite for the inspection. The current version of these | |||
documents is expected unless specified otherwise. Electronic media is preferred, if readily | |||
available (the preferred file format is Word or searchable .pdf files on CDROM or thumb | |||
drive). Please organize the information as it is arranged below (e.g. a folder labeled | |||
Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose. | |||
This data will be inspected using original documentation. If there are questions regarding the | |||
documents requested, please do not hesitate to contact the inspector. | |||
EP2 Alert and Notification System (ANS) Testing | |||
Department of Homeland Security (DHS) approved Alert Notification System (ANS) report | |||
Alert Notification System Testing Procedure | |||
ANS equipment technical manual | |||
ANS equipment testing results (raw data) for two year inspection period | |||
ANS equipment maintenance records for two year inspection period | |||
Changes to the ANS system, testing procedures and the maintenance program including | |||
any supporting DHS approval letters | |||
Corrective action program entries related to the Alert and Notification System for the two | |||
year inspection period | |||
Copies of brochures/information provided to the public | |||
EP3 Emergency Response Organization (ERO) Staffing and Augmentation System | |||
Current ERO roster | |||
NUREG 0654 Table B1 site equivalent | |||
ERO training program procedure | |||
EP staff training program and qualification records | |||
ERO augmentation | |||
ERF activation, including backup, equipment initiation procedure | |||
ERO augmentation testing results | |||
Corrective action program entries related to the ERO staffing and augmentation for the two | |||
year inspection period | |||
Enclosure | |||
2 | |||
EP4 Emergency Action Level (EAL) and Emergency Plan Changes | |||
Governing document for 10 CFR 50.54(q) evaluation process | |||
10 CFR 50.54(q) evaluator training program and qualification records | |||
Changed procedure 10 CFR 50.54(q) evaluation | |||
Changed procedure current and immediately previous revisions | |||
Corrective action program entries related to Emergency Action Level and Emergency Plan | |||
changes for the two year inspection period | |||
EP5 Correction of Emergency Preparedness (EP) Weakness | |||
Governing document for the assessment process | |||
All EP program assessments, not including INPO performed assessments, for the two year | |||
inspection period | |||
10 CFR 50.54(t) audits and subsequent state/local correspondence for the two year | |||
inspection period | |||
Drill and exercise critiques for the two year inspection period | |||
Corrective action program entries, that is identifier and one line description, for the two year | |||
inspection period with the risk significant related entries separated | |||
EP01/EP02/EP03 Performance Indicators (PI) Verification | |||
Governing document for the performance indicator process | |||
Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert | |||
and Notification System (ANS) PI data submitted for the two year inspection period | |||
DEP documentation and evaluations for the two year inspection period | |||
Current ERO roster | |||
Corrective action program entries related to performance indicators, that is DEP, ERO | |||
training and participation, and ANS for the two year inspection period | |||
2 | |||
Miscellaneous Procedures | Miscellaneous Procedures | ||
Current Emergency Plan | |||
Safety Evaluation Report approved Emergency Plan | |||
Current Emergency Action Levels | |||
Safety Evaluation Report approved Emergency Action Levels | |||
Current Emergency Plan implementing procedures | |||
Corrective Action Program procedure | |||
Lead Inspector Contact Information: | Lead Inspector Contact Information: | ||
Mark E. Speck | |||
(404) 997-4759 | |||
Mark.Speck@nrc.gov | |||
Suite 1200 Atlanta, GA | Mailing Address | ||
US Nuclear Regulatory Commission, Region II | |||
ATTN: Mark Speck | |||
245 Peachtree Center Ave., NE | |||
Suite 1200 | |||
Atlanta, GA 30303-1257 | |||
Enclosure | |||
}} | }} | ||
Revision as of 18:58, 12 November 2019
| ML111540341 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/02/2011 |
| From: | Brian Bonser NRC/RGN-II/DRS/PSB1 |
| To: | Franke J Progress Energy Florida |
| References | |
| IR-11-501 | |
| Download: ML111540341 (6) | |
See also: IR 05000302/2011501
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
June 2, 2011
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011501
Dear Mr. Franke:
During the period of June 27-July 1, 2011, the NRC will conduct baseline emergency
preparedness inspection activities at the Crystal River 3 Nuclear Plant. The inspection will
evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection
Procedures (IP) 71114.02, 71114.03, 71114.04, and 71114.05. The inspection will also review
the emergency preparedness performance indicators using IP 71151.
To minimize the impact to your on-site resources and to ensure a productive inspection, we
have enclosed a request for documents needed for this inspection. It is important that all of
these documents are up to date and complete, thereby minimizing the number of additional
documents requested during the preparation and/or the onsite portions of the inspection. The
inspector has requested that the subject informational material be made available to the NRC
staff upon arrival on June 27, 2011.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Dennis Herrin of your organization. If there
are any questions about this inspection or the material requested, please contact the lead
inspector, Mark Speck at (404) 997-4759.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
FPC 2
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No.: 50-302
License No.: DPR-72
Enclosure:
Emergency Preparedness Inspection Document Request List
cc w/encl.: (See page 3)
FPC 3
cc w/encl: Daniel R. Westcott
Kelvin Henderson Supervisor
General Manager Licensing & Regulatory Programs
Nuclear Fleet Operations Crystal River Nuclear Plant (NA1B)
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Joseph W. Donahue
Brian C. McCabe Vice President
Manager, Nuclear Oversight Nuclear Oversight
Shearon Harris Nuclear Power Plant Progress Energy
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Jack E. Huegel
James W. Holt Manager, Nuclear Oversight
Plant General Manager Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
Electronic Mail Distribution
David T. Conley
Stephen J. Cahill Senior Counsel
Director - Engineering Nuclear Legal Department
Crystal River Nuclear Plant (NA2C) Progress Energy
Electronic Mail Distribution Electronic Mail Distribution
R. Alexander Glenn Mark Rigsby
General Counsel Manager, Support Services - Nuclear
Progress Energy Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Electronic Mail Distribution
Jeffrey R. Swartz Senior Resident Inspector
Director Site Operations U.S. Nuclear Regulatory Commission
Crystal River Nuclear Plant Crystal River Nuclear Generating Plant
Electronic Mail Distribution U.S. NRC
6745 N Tallahassee Rd
Donna B. Alexander Crystal River, FL 34428
Manager, Nuclear Regulatory Affairs
(interim) Attorney General
Progress Energy Department of Legal Affairs
Electronic Mail Distribution The Capitol PL-01
Tallahassee, FL 32399-1050
Thomas Sapporito
Consulting Associate Bryan Koon
(Public Correspondence Only) Director
Post Office Box 8413 Florida Division of Emergency Management
Jupiter, FL 33468 Electronic Mail Distribution
William A. Passetti Chairman
Chief Board of County Commissioners
Florida Bureau of Radiation Control Citrus County
Department of Health 110 N. Apopka Avenue
Electronic Mail Distribution Inverness, FL 36250
ML111540341 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
NAME M. SPECK B. BONSER
DATE 06/01/2011 06/02/2011
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Document Request List
Inspection Dates: June 27, 2011 - July 1, 2011
Inspection Procedures: IP 71114.02 Alert and Notification System Testing
IP 71114.03 Emergency Response Organization Staffing
and Augmentation System
IP 71114.04 Emergency Action Level and Emergency
Plan Changes
IP 71114.05 Correction of Emergency Preparedness
Weakness
IP 71151 Performance Indicator Verification
Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or
provided to the inspector upon arrival onsite for the inspection. The current version of these
documents is expected unless specified otherwise. Electronic media is preferred, if readily
available (the preferred file format is Word or searchable .pdf files on CDROM or thumb
drive). Please organize the information as it is arranged below (e.g. a folder labeled
Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.
This data will be inspected using original documentation. If there are questions regarding the
documents requested, please do not hesitate to contact the inspector.
EP2 Alert and Notification System (ANS) Testing
Department of Homeland Security (DHS) approved Alert Notification System (ANS) report
Alert Notification System Testing Procedure
ANS equipment technical manual
ANS equipment testing results (raw data) for two year inspection period
ANS equipment maintenance records for two year inspection period
Changes to the ANS system, testing procedures and the maintenance program including
any supporting DHS approval letters
Corrective action program entries related to the Alert and Notification System for the two
year inspection period
Copies of brochures/information provided to the public
EP3 Emergency Response Organization (ERO) Staffing and Augmentation System
Current ERO roster
NUREG 0654 Table B1 site equivalent
ERO training program procedure
EP staff training program and qualification records
ERO augmentation
ERF activation, including backup, equipment initiation procedure
ERO augmentation testing results
Corrective action program entries related to the ERO staffing and augmentation for the two
year inspection period
Enclosure
2
EP4 Emergency Action Level (EAL) and Emergency Plan Changes
Governing document for 10 CFR 50.54(q) evaluation process
10 CFR 50.54(q) evaluator training program and qualification records
Changed procedure 10 CFR 50.54(q) evaluation
Changed procedure current and immediately previous revisions
Corrective action program entries related to Emergency Action Level and Emergency Plan
changes for the two year inspection period
EP5 Correction of Emergency Preparedness (EP) Weakness
Governing document for the assessment process
All EP program assessments, not including INPO performed assessments, for the two year
inspection period
10 CFR 50.54(t) audits and subsequent state/local correspondence for the two year
inspection period
Drill and exercise critiques for the two year inspection period
Corrective action program entries, that is identifier and one line description, for the two year
inspection period with the risk significant related entries separated
EP01/EP02/EP03 Performance Indicators (PI) Verification
Governing document for the performance indicator process
Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert
and Notification System (ANS) PI data submitted for the two year inspection period
DEP documentation and evaluations for the two year inspection period
Current ERO roster
Corrective action program entries related to performance indicators, that is DEP, ERO
training and participation, and ANS for the two year inspection period
Miscellaneous Procedures
Current Emergency Plan
Safety Evaluation Report approved Emergency Plan
Current Emergency Action Levels
Safety Evaluation Report approved Emergency Action Levels
Current Emergency Plan implementing procedures
Corrective Action Program procedure
Lead Inspector Contact Information:
Mark E. Speck
(404) 997-4759
Mark.Speck@nrc.gov
Mailing Address
US Nuclear Regulatory Commission, Region II
ATTN: Mark Speck
245 Peachtree Center Ave., NE
Suite 1200
Atlanta, GA 30303-1257
Enclosure