|
|
Line 19: |
Line 19: |
| {{#Wiki_filter:Attachment 2 W3F1-2012-0049 Proposed Waterford 3 Operating License Change (mark-up) | | {{#Wiki_filter:Attachment 2 W3F1-2012-0049 Proposed Waterford 3 Operating License Change (mark-up) |
| (contains 1 page) | | (contains 1 page) |
| AMENDMENT NO. 171, 218, 234 Revised by letter dated July 26, 2007 (a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
| | |
| (b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. | | (a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. |
| (c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously. | | (b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. |
| D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. | | (c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously. |
| | D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. |
| E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004. | | E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004. |
| EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx. | | EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx . |
| | AMENDMENT NO. 171, 218, 234 Revised by letter dated July 26, 2007 |
|
| |
|
| Attachment 3 W3F1-2012-0049 Revised Waterford 3 Operating License Page (contains 1 page) | | Attachment 3 W3F1-2012-0049 Revised Waterford 3 Operating License Page (contains 1 page) |
| AMENDMENT NO. 171, 218, 234, xxx Revised by letter dated July 26, 2007 (a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
| | |
| (b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. | | (a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. |
| (c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously. | | (b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. |
| D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. | | (c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously. |
| | D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. |
| E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004. | | E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004. |
| EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx.}} | | EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx. |
| | AMENDMENT NO. 171, 218, 234, xxx Revised by letter dated July 26, 2007}} |
|
---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21175A3622021-06-24024 June 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0027, Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0808 April 2021 Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0073, (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements2019-10-24024 October 2019 (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 W3F1-2018-0043, Amendment 2 to License Renewal Application2018-07-30030 July 2018 Amendment 2 to License Renewal Application W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-05-17017 May 2018 (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-03-26026 March 2018 License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0011, License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event2018-03-0808 March 2018 License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event W3F1-2017-0067, License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K3132017-12-0606 December 2017 License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K313 W3F1-2017-0065, License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations2017-11-28028 November 2017 License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations W3F1-2017-0081, Amendment 1 to License Renewal Application (Laa)2017-11-15015 November 2017 Amendment 1 to License Renewal Application (Laa) ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments W3F1-2017-0025, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2017-03-28028 March 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2016-0055, License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program2016-09-0101 September 2016 License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program W3F1-2016-0036, Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-25025 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code W3F1-2016-0049, Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-07-12012 July 2016 Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML16088A3312016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 1 of 9) ML16088A3252016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 3 of 9) W3F1-2016-0012, License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9)2016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9) ML16088A3292016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 7 of 9) ML16088A3282016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 6 of 9) ML16088A3262016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 4 of 9) ML16088A3272016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 5 of 9) W3F1-2015-0040, License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-07-0202 July 2015 License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 W3F1-2015-0037, License Amendment Request, Cyber Security Plan Implementation Schedule2015-06-29029 June 2015 License Amendment Request, Cyber Security Plan Implementation Schedule ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 2024-05-08
[Table view] |
Text
Attachment 2 W3F1-2012-0049 Proposed Waterford 3 Operating License Change (mark-up)
(contains 1 page)
(a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
(b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
(c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously.
D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004.
EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx .
AMENDMENT NO. 171, 218, 234 Revised by letter dated July 26, 2007
Attachment 3 W3F1-2012-0049 Revised Waterford 3 Operating License Page (contains 1 page)
(a) The first performance of SR 6.5.17, in accordance with Specification 6.5.17.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
(b) The first performance of the periodic assessment of CRE habitability, Specification 6.5.17.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from April 17, 2004, the date of the most recent successful tracer gas test, as stated in the October 8, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
(c) The first performance of the periodic measurement of CRE pressure, Specification 6.5.17.d, shall be within 18 months, plus the 138 days allowed by SR 4.0.2, as measured from August 13, 2008, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously.
D. The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan,@ and was submitted on October 4, 2004.
EOI shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The EOI CSP was approved by License Amendment No. 234 and supplemented by a change approved by License Amendment No. xxx.
AMENDMENT NO. 171, 218, 234, xxx Revised by letter dated July 26, 2007