{{#Wiki_filter:Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AC097 Equip. Class" 2 (20) Control Panels & Cabinets Equipment Description Diesel Generator OAG12 Control Panel Location:
{{#Wiki_filter:Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)
Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. 0AC097                               Equip. Class"2 (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOAG12 ControlPanel Location: Bldg. Diesel Generator                 Floor El. 127               Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage
Y)NE 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item one           Y)NE of the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y] NEI UE N/A[
: 3. Is the anchorage free of corrosion that is more than mild surface                       Y[O ND UED N/Al]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YP4 NEl UO N/AD
: 5. Is the anchorage configuration consistent with plant documentation?                   Y$ NE UE] N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y3NEI UE
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y] NEI UE N/A[Y[O ND UED N/Al]YP4 NEl UO N/AD Y$ NE UE] N/AU Y3NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3Nn* R.9-19-171 C-310 Sheet 2 of 2 Equipment IoD No. AC097 Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel Generator OA G12 Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
                                                              <C-3 >
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                              C-310
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yo NEI UEI N/A[3 YKJ] NIl U- N/AL-YK NEl UOI N/AU Y NO UU1 Other Adverse Conditions
.nrr*.nnnndi.nr, Nn* R.9-19-171
: 11. Have you looked for and found no other seismic conditions that could YW NEI U" adversely affect the safety functions of the equipment?
 
Sheet 2 of 2 Equipment IoD No.       AC097                   Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOA G12 ControlPanel Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Yo NEI UEI N/A[3
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YKJ] NIl U-    N/AL-and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YK NEl UOI N/AU
: 10. Based on the above seismic interaction evaluations, is equipment free     Y    NO UU1 of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YW NEI U" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
C- C , S..n2et- +LcZ Evaluated by:.Date: ? ,5"//-..461-1 !!&#xfd; 4 41--V/2.5-42-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (fnrrP.nnndpnr.P Nn
C-     C       ,   S..n2et-             +LcZ Evaluated by:.                                                                     Date:     ? ,5"//-..
* RR-19-17.1 C-311
461-1 !!&#xfd; 4 41--                                                     /2.5                                 V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                 C-311 (fnrrP.nnndpnr.P Nn
'-U 0 a.- 0)0. o* 0-0 c m-3 CD C)0 C-)CC)4I Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)Equipment ID No. OAGO12 Equip. Class'2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location:
* RR-19-17.1
Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
0
Additional space is provided at the end of this checklist for documenting other comments.Anchora2e 1. Is the anchorage configuration verification required (i.e., is the item one Y[& NEI of the 50% of SWEL items requiring such verification)?
'-U a.-   0)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidati'on?  
: 0. o
,, YPI NE UD N/AD YO NEI UD- N/AD3 4. Is the anchorage free of visible cracks in the concrete near the anchors? YO ND UDI N/A'-5. Is the anchorage configuration consistent with plant documentation?
* 0
YeN U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
  - 0 c
: 6. Based on the above anchorage evaluations, is the anchorage free of Y$ NO UD3 potentially adverse seismic conditions?
m
1 2 Enter the equipment class name from Appendix B: Classes of Equipment.
          -3 CD C) 0 C-)
<C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-313 f .nrrs nnnHPdnn.P.
CC) 4I
Nn
 
* RR-19-171 Sheet 2 of 2 Equipment ID No. OAGO12 Equip. Class 1 2 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)
Y[. NEI U-' N/All 8. re vereadequpmet, istibuionsysems celin ties nd ighing 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No. OAGO12                               Equip. Class' 2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location: Bldg. Diesel Generator                 Floor El. 127               Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
A'e ceU, 1 /,i oes or rnti tnr>. 6 IoWe,$,.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YJ2 NOI Urn N/Al]YA NEI Ul] N/Al]YQ&#xfd; NEI UF Other Adverse Conditions
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 11. Have you looked for and found no other seismic conditions that could YPO NOI U--1 adversely affect the safety functions of the equipment?
Anchora2e
Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A  
: 1. Is the anchorage configuration verification required (i.e., is the item one             Y[& NEI of the 50% of SWEL items requiring such verification)?
& V-eenp aVV /6 Me #uv ,4 //-e e,/ V~~~ ~1F4~l .4e;< / Av i4e il, /'~ 'Evaluated by: Date; )-?/'000Y ,;&#xfd;/zq &of -< C-4 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPmsnnnr1iP.ln Nn
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       YPI NE UD N/AD
* RRA-1-17 C-314 cl,-. 03'3 z 0n CA c m 30 CD C)G)C)  
: 3. Is the anchorage free of corrosion that is more than mild surface                       YO NEI UD- N/AD3 oxidati'on? ,,
'D*&#xfd; 0-CD 0 z 'm.0-*0 CD 53  
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YO ND UDI N/A'-
-3 0* 0 (A m CDCD K -0C O D~CD<. >0 3u C.) C 0 m 30 CD-.1 5-D&#xfd; -0 0 3)0 M " m 3o CD C)
: 5. Is the anchorage configuration consistent with plant documentation?                     YeN     U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. OAP060 Equip. Class" 2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil Transfer Pump Location:
: 6. Based on the above anchorage evaluations, is the anchorage free of                     Y$ NO UD3 potentially adverse seismic conditions?
Bldg. Diesel Generator Floor El. ,2aoIi/ia..Room, Area D/G-3 Building 2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)
2 1 Enter the equipment class name from Appendix B: Classes of Equipment.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
                                                              <C-3 >
Additional space is provided at the end of this checklist for documenting other comments.Anchorage.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-313 f .nrrs nnnHPdnn.P. Nn
I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
* RR-19-171
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
YONM Y1A NO UOI- N/AE Yf NEI UO N/AE 4. Is the anchorage free of visible cracks in the concrete near the anchors? NEI' UE N/AE 1V0 rh~..~ otm c- vcre-e-, 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Sheet 2 of 2 Equipment ID No. OAGO12                         Equip. Class12 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[. NEI U-' N/All
YE NE UE N/AI YNLIuEl 12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. re   vereadequpmet,celin ties nd ighing istibuionsysems
<C-3 >.Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (.nrrP.nnndlnr.P.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJ2 NOI Urn N/Al]
Nn RR-1 9-173 C-320 Sheet 2 of 2 Equipment ID No. OAP060 Equip. Class" (05) Horizontal Pu s Equipment Description El DIG Fuel Oil Transfer Pump Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
A'e ceU,/,i oes or rntitnr>. 6 IoWe,$,.
*%.") oe~bttr Or 4OvSCtr( --9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y4 NE UD N/AO Y[INUI UI N/Al Y$ NE UO N/AD YP NO U[-]Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?               YA NEI Ul] N/Al]
: 11. Have you looked for and found no other seismic conditions that could .YN NEI UD adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free       YQ&#xfd; NEI UF of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YPO NOI U--1 adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A         & V-eenp     aVV /6 Me #uv           ,4     //-e   e,/ V
                                      ~~~~1F4~l   .4e;< / Av   i4e il,           /'~   '
Evaluated by:                                                                       Date;           )-?/
                                '000Y                                                           ,;&#xfd;/zq of& -
                                                      < C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                       C-314 rnrrPmsnnnr1iP.ln Nn
* RRA-1-17
 
cl,
  -. 03
  '3 z     0n CA c
m 30 CD C)
G)
C)
 
'D
    *&#xfd;   0
  -   CD 0
z '
m
          .0
          -*0 CD 53
 
-3   0
* 0 (A
m CD 2*
CD
 
K -0C O   D
~CD
<. >
0 3u C.) C 0
m 30 CD
      -. 1 5-
 
-0 D&#xfd; 0 3) 0 M"
m 3o CD C)
 
Sheet 1 of 2 Status:     N U Seismic Walkdown Checklist (SWC)
Equipment ID No. OAP060                             Equip. Class"2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil TransferPump Location: Bldg. Diesel Generator Floor El. ,2aoIi/ia..Room, Area D/G-3 Building                                   2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage.
I. Is the anchorage configuration verification required (i.e., is the item one YONM of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y1A NO UOI- N/AE
: 3. Is the anchorage free of corrosion that is more than mild surface                   Yf     NEI UO N/AE oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           YI* NEI' UE     N/AE 1V0       rh~..~                     otm                                 vcre-e-,
c-
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NE UE N/AI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YNLIuEl potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          <C-3 >.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-320
(.nrrP.nnndlnr.P. Nn RR-1 9-173
 
Sheet 2 of 2 Equipment ID No. OAP060                         Equip. Class" (05) Horizontal Pu   s Equipment Description El DIG Fuel Oil TransferPump Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y4 NE UD N/AO
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[INUI UI N/Al and masonry block walls not likely to collapse onto the equipment?
        *%.")               oe~bttr Or     4OvSCtr(   --
: 9. Do attached lines have adequate flexibility to avoid damage?               Y$ NE    UO N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free       YP NO U[-]
of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     . YN NEI UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added, as necessary)
Comments (Additional pages may be added, as necessary)
_____M___
_____M___
ft Evaluated by: L#4EEZ Date: _____ ____.'1 .Z) /2-< C-4 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Nn
ft Evaluated by:         L**#4EEZ                                                     Date: _____       ____.
* RR-19-17.T C-321
                                                                                              '1 .Z) /2-
-u 0* 0 0~C cn CD 3 ()0 0 0 Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AP163 Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location:
                                                    < C-4 >
Bldg. Diesel Generator Floor El. ik211z_ p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-321 CnrrP.-nnnr-nr*. Nn
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults of judgments and findings.
* RR-19-17.T
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO NJ9 of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- u 0
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
* 0 0~C cn CD 3
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
()
YIr NE UE N/AO YE4 NEI Ul N/AL Ypa NEI UL N/AL YE NEI UE N/AI9 YN NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
0 0
<C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnnr1Pnrn Nn -RR-19-171 C-323 Sheet 2 of 2 Equipment ID No. 0AP163 Equip. Class 1 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
0
Y, NO UO N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?
 
tL(? Al, tFq 1 ct/eSsV ev ecvre,/y 4tfida6 /VO Me- cet/,r11 AD ,~C49e o-, Hkib~'~ ri not- ec~4 c&v-~ t~4e-It( i4:) 0/b f-a l /. 4 "--./S 'Ni -e 'entL, bio cei/at lh.o ..son1 ,-9. Do attached lines have adequate flexibility to avoid damage? P4 NEI U! N/A1 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?ANEIUO Other Adverse Conditions
Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no other seismic conditions that could YR NEI U-adversely affect the safety. functions of the equipment?
Equipment ID No. 0AP163                           Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location: Bldg. Diesel Generator           Floor El. ik211z_     p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         YO NJ9 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YIr NE UE N/AO
: 3. Is the anchorage free of corrosion that is more than mild surface                   YE4 NEI Ul N/AL oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           Ypa NEI UL N/AL
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NEI UE N/AI9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YN NEI UE potentially adverse seismic conditions?
12Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          <C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                         C-323 rnrrmnnnr1Pnrn Nn - RR-19-171
 
Sheet 2 of 2 Equipment ID No. 0AP163                       Equip. Class12 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y,   NO UO N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?
tL(? Al,             1 tFq ct/eSsV ev     ecvre,/y 4tfida6           /VO Me- cet/,r11 AD
                  ,~C49e         o-, Hkib~'~                 ri         not- ec~4     c&v-~             t~4e-
                                                                                                              ,-
It( i4:) 0/b     f-a l bio
                                    /.           4 "--./S 'Ni -e 'entL,       cei/at lh.oo*    .. son1
: 9. Do attached lines have adequate flexibility to avoid damage?               P4 NEI U! N/A1
: 10. Based on the above seismic interaction evaluations, is equipment free         ANEIUO of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YR NEI U-adversely affect the safety. functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                      Date:      9      '2 -
Q= &#xfd;Ab V
                                                    <C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                    C-324 rnrrPnnndPneP Nn
* R,-19-17.
 
~~U)fl 0
D D CD,
-4  0 3.
C/
m
        .0 c
        -4.
3 CD C)
 
-      o
:0
* 0
  -~C:
m 3o CD 0)
        -.0
 
Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)
OA-TO010 Equipment ID No. 4AT-W                IA T  */;i/i 2- Equip. Class". (21) Tanks or Heat Exchangers (Vertical)
Equipment Description E1 Diesel GeneratorFuel Oil Day Tank Location: Bldg. Diesel Generator                Floor El. 127              Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist fordocumenting other comments.
Anchorage
* 1. Is the anchorage configuration verification required (i.e., is the item one          Y[    NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                      Y[9 NEI UI N/A-
: 3. Is the anchorage free of corrosion that is more than mild surface                      Y[K NEI U-    N/ADl oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?              YK NEI UD- N/AD
: 5. Is the anchorage configuration consistent with plant documentation?                  YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.) 3 i/40-4n~4c~'(~~tf~v~ei 4            '~-Irs    ,
: 6. Based on the above anchorage evaluations, is the anchorage free of                    Y)NU potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                            < C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                              C-327 r.nrrPqnnndn1n'.P Nn
* RR-19-171
 
Sheet 2 of 2 Equipment ID No. OAT40                        Equip. Class 12 (21) Tanks or Heat Exchangers (Vertical)
Equipment Description El Diesel GeneratorFuel Oil Day Tank Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      YM NE Ur N/AEl
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  YP4 NE UD N/AD and masonry block walls not likely to collapse onto the equipment?
          ,0o 0qAf5bnPX                    r~ ct-i7 0.,415            ,e
: 9. Do attached lines have adequate flexibility to avoid damage?              YVI NO UO N/AU
: 10. Based on the above seismic interaction evaluations, is equipment free      YX NEI UD of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could      Y,    NO UE" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9 '2 -Q=&#xfd;Ab V<C-4 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPnnndPneP Nn
Evaluated by:         M      -r,*.
* R,-19-17.C-324
5t                                                  Date:   A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-328
~~U)fl 0 D D CD,-4 0 3.C/m.0 c-4.3 CD C)
.nrri-nnndPnr.P Nn
-o:0* 0-~C: m 3o CD 0)-.0 Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)OA-TO010 Equipment ID No. 4AT-W IA T 2- Equip. Class". (21) Tanks or Heat Exchangers (Vertical)
* RR-19-17R
Equipment Description E1 Diesel Generator Fuel Oil Day Tank Location:
 
Bldg. Diesel Generator Floor El. 127 Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
U) 0 m
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
30 CD
Additional space is provided at the end of this checklist fordocumenting other comments.Anchorage* 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Sheet 1 of 2
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[ NEI Y[9 NEI UI N/A-Y[K NEI U- N/ADl YK NEI UD- N/AD 5. Is the anchorage configuration consistent with plant documentation?
                                                                                                \          ~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096                                        Equip. Class"2 (21) Tanks or Heat Exchangers (Horizontal)
YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.)
Equipment Description El Diesel GeneratorLube Oil Storage Tank Location: Bldg. Diesel Generator                       Floor El. 127                   Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
3 i/40-4n~4c~'(~~tf~v~ei 4 '~-Irs , 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Y)NU 12 Enter the equipment class name from Appendix B: Classes of Equipment.
Anchorage
< C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnndn1n'.P Nn
: 1. Is the anchorage configuration verification required (i.e., is the item one                 YDN) of the 50% of SWEL items requiring such verification)?
* RR-19-171 C-327 Sheet 2 of 2 Equipment ID No. OAT40 Equip. Class 1 2 (21) Tanks or Heat Exchangers (Vertical)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Y;    NEI U-' N/ADl
Equipment Description El Diesel Generator Fuel Oil Day Tank Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 3. Is the anchorage free of corrosion that is more than mild surface                           YJI NDI- UD N/AED oxidation?
YM NE Ur N/AEl 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP4 NE and masonry block walls not likely to collapse onto the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Ypk NDI UD- N/ADl:
,0o 0qAf5bnPX 0.,415 r~ ct-i7 ,e UD N/AD 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YVI NO UO N/AU YX NEI UD Other Adverse Conditions
: 5. Is the anchorage configuration consistent with plant documentation?                         YDI NDI UD- N/As4.
: 11. Have you looked for and found no other seismic conditions that could Y, NO UE" adversely affect the safety functions of the equipment?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I            /7'   .1      A  e."r~~   21        %  ~ ,i A IL- ftv' AtOf e    60 n h PVP    -0'0          -   0 " W. el            7
: 6. Based on the above anchorage evaluations, is the anchorage free of                                 ND UD potentially adverse seismic conditions?
12Enter the equipment class name from Appendix B: Classes of Equipment.
4C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                     C-330 r.nrrmqnnndrnr.P.* Nn
* RR-19-171
 
Sheet 2 of 2 Equipment ID No. 0AT096                        Equip. Class12 (21) Tanks or Heat Exchangers (Horizontal)
Equipment Description El Diesel GeneratorLube Oil Storage Tank Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YX* NO UO N/AU
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Yo NEI UO N/AU
: 10. Based on the above seismic interaction evaluations, is equipment free     Y5 NE UO of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YA NOl UU adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: M 5t Date: A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3.nrri-nnndPnr.P Nn
Evaluated by:         44~z                                                        Date:
* RR-19-17R C-328 z U)0 m 30 CD Sheet 1 of 2\ ~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096 Equip. Class" 2 (21) Tanks or Heat Exchangers (Horizontal)
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-331 rTnrrP.AnnnrlAnr. Nn
Equipment Description El Diesel Generator Lube Oil Storage Tank Location:
* RR-19-173
Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
  -~0 z*0
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
* 0
YDN)2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
'33 cn m
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
n CD 0) co
I /7' .1 A e ."r~~ 21 % ~ ,i Y; NEI U-' N/ADl YJI NDI- UD N/AED Ypk NDI UD- N/ADl: YDI NDI UD- N/As4.ND UD A I L -ftv' AtOf e 60 n h PVP -0'0 -0 " W. el 7 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
Sh      t1of2 Status         N U Seismic WalkdownClieck1ist-(SWC)
Equipment ID No.               A 030 Equipment Description C.go vfr.e Equip. Classt 60h (P) F-.*
                                                                              *'*_Vi,*                .t      t7,/z    ,-*
Lcto:Bldg. 18                        Floor El. 1Z    (0S Rot'-A'ra                                                    "
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This chekdlist. may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings. Additional space is provided at the end of this checklist for docudtlenting -othercomments.
: 1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?
44&#xfd;I'd PVJr                          0 (o2,00'V"-5"-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YKQNI UF N/AO t-5k 4AA44            10."                t  4      ic    f/t
: 3. Is the ancShorage free of codrosion that is more than mild surface                     Y_.NI" UDI N/AD' oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YA'[3IUQI N/AQ
: 5. Is the anchorage configuration consistent with plant documentation?-                  Y&#xfd; N[3 UF3 N/A[r (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YXN[        UQ potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
12 Enter the equipment class name from Appendix B: Classes of Equipment.
4C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Nn
                                                                % C-3 >
* RR-19-171 C-330 Sheet 2 of 2 Equipment ID No. 0AT096 Equip. Class1 2 (21) Tanks or Heat Exchangers (Horizontal)
Peach Bottom Atomic Power Station Unit 3                                                                                 C-333 MPR-3812, Revision 3
Equipment Description El Diesel Generator Lube Oil Storage Tank Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?NO UO N/AU 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
(-nrr~mnnnrfP.nr&#xfd;n  Nn* R-19-171
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yo NEI UO N/AU Y5 NE UO Other Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could YA NOl UU adversely affect the safety functions of the equipment?
Sheet 2 of 2 Equipment ID No.             .(
Equipment Description Interaction Effects                 .  -
: 7. Are soft targets free. frn- immpact&#xfd; by nearby equipmejit or structures?. Yg NO3 UQ N/AO
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?
: 9. Do attachedlines have adequate flexibility to avoid damage?               yZ 41i U-I N/AO q      -
1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free.    -,        NO UOi of potentially adverse seismic interaction effects?
I.. .  ",.'," .      ......" _.              S,.  *:    ,                    '1    ,'--.'z Mk                      I,  .
* t'i( i ." .')
Other Adverne Conditions
: 11. Have you looked for and found no other seismic conditions that could       YJI'-NO UOI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: 44~z Date: Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rTnrrP.AnnnrlAnr.
Evaluated by:                                                                           Date:         I        -
Nn
( C4 >
* RR-19-173 C-331
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn         RR-19-17C-                                                                          C-334
-~0 z *0* 0'33 cn m n CD co 0)
 
Sh t1of2 Status N U Seismic WalkdownClieck1ist-(SWC)
0
Equipment ID No. A 030 Equip. Classt (P) Equipment Description C.go vfr.e 60h .t t7,/z Lcto:Bldg.
  '-
18 Floor El. S 1Z (0 Rot'-A'ra
z 'o
" Manufacturer, Model, Etc. (optional but recommended)
* 0
Instructions for Completing Checklist This chekdlist.
  . cn m
may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings.
        "0&deg; 3
Additional space is provided at the end of this checklist for docudtlenting -other comments.1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?
CD C
44&#xfd; I'd PVJr 0 (o 2,00'V"-5"-
0CA) 0 0
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
 
YKQNI UF N/AO t-5k 4AA44 10. " t 4 ic f/t 3. Is the ancShorage free of codrosion that is more than mild surface Y_.NI" UDI N/AD'oxidation?
    -~0 z*0 Z ;a
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
-3  CD 0 cn C.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
        "0 m
Y A'[3IUQI N/AQ Y&#xfd; N[3 UF3 N/A[r YXN[ UQ 12 Enter the equipment class name from Appendix B: Classes of Equipment.
CD 3
% C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (-nrr~mnnnrfP.nr&#xfd;n Nn* R-19-171 C-333 Sheet 2 of 2 Equipment ID No. .(Equipment Description Interaction Effects .-7. Are soft targets free. frn- immpact&#xfd; by nearby equipmejit or structures?.
C 2
Yg NO3 UQ N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?9. Do attachedlines have adequate flexibility to avoid damage? yZ 41i U-I N/AO q -1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free. -, NO UOi of potentially adverse seismic interaction effects?I.. ..... ...",.'," " _. S,. , Mk'1 ,'--.'z I,.t'i( i ." .')Other Adverne Conditions
0 0*
: 11. Have you looked for and found no other seismic conditions that could YJI'-NO UOI adversely affect the safety functions of the equipment?
0
 
Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AV036                            Equip. Class"2 (09) Fans Equipment Description Battery Room Exhaust FanA Location: Bldg. Radwaste                    Floor El. 165              Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YJMNEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YX    NO ULI N/All
: 3. Is the anchorage free of corrosion that is more than mild surface                   YXNO U!] N/Al]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   NO U! N/Al-
: 5. Is the anchorage configuration consistent with plant documentation?                 YV NO" ULI N/AL]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
COi-(,tR4eamna tr~ae-Me              t>,46    62&#xfd;'O-s-q-eO,IZLV.6
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YENO UO potentially adverse seismic conditions?
32Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          <KC-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-337 rnrrmnnndn-nrP Nn" RR-19-173
 
Sheet 2 of 2 Equipment ID No. 0AV036                        Equip. Class12 (09) Fans Equipment Description Battery Room Exhaust FanA Interaction Effects
: 7. Are softt                          by nearby equipment or structures?     YXND UQ N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YtKND U- N/AD and masonry block walls not likely to collapse onto the equipment?
YNearAY      6048cI'l-        olejidte ly        Vlo4A.
A0t499tOb'aOvOmr-&#xa3;.
urn+
: 9. Do attached lines have adequate flexibility to avoid damage?             Y)(NL- UD N/AE`
: 10. Based on the above seismic interaction evaluations, is equipment free     YX ND Ur of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could      Y    NEI U adversely affect the safety functions of the equipment?O          Ie'    or* .eac4 V'i viesul u ofpw            7T ent    1                    M-Comments .(Additional pages may be added as necessary)
Evaluated by:                                                                    Date:    __. /
o._I    _          I-'0X
                                                                                                !3-/    IZ
                                                    < C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                    C-338 rlnrrinnnrPnr.P NKn* R-1 9-171
 
  -~0 z    0 3
* 0
          ~~T-S CCD 00
 
  -  CD z  ~3 0
c m
        -5" 3CD
          -C C) 0 0
0)
 
-&#xfd;    02 z  0 CD 0 si >
: 0. 3 on, 5
R.
0 m
30 CD 0)
 
D3  3 CD 0
c m
30 CD CA 0)
 
Sheet 1 of 2 Status:)    N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AV064                                Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator                Floor El. 151              Room, Area D/G-P              g Building Manufacturer, Model, Etc. (optional but recommended)                  :Amtifl,    OLOW1aR *T*N        13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YT(NE of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                      YZIND UE" N/AD
: 3. Is the anchorage free of corrosion that is more than mild surface                      YE(NE] UD N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?              Y[f NDI UD' N/ADl
: 5. Is the anchorage configuration consistent with plant documentation?                    Ye/ND- UEI N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                    Y~dN[D ULI potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                              'C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                C-343 rnrrm..qnnnHP-nr.&#xfd;- Nn " RR-19-171
 
Sheet 2 of 2 Equipment ID No. 0AV064                        Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      YdfN5 UE] N/Al]
A)O ,Mr-v      TARO67,TS.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL- N/Al]
and masonry block walls not likely to collapse onto the equipment?
kIO    0v~
V6ZML2'OMC            l6i5'
: 9. Do attached lines have adequate flexibility to avoid damage?              Y[N'NOI UI0 N/Al]
: 10. Based on the above seismic interaction evaluations, is equipment free    Y[aNEI UE" of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[A' NEl U--
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: Date: I -( C4 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn RR-19-17C-C-334
VIA Evaluated by:.                                                                    Date: AbOW
'-0 z 'o* 0.cn m"0&deg;3 CD CA)C 0 0 0  
                                                                                          -1IZ8f/261 -
-~0 z *0 Z ;a-3 CD 0 cn C.)"0 m 3 CD C 2 00 Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AV036 Equip. Class" 2 (09) Fans Equipment Description Battery Room Exhaust Fan A Location:
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                               C-344 (lnrrm.*nnndHnr.P Nn - RR=19-171
Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
j3 0 z   o~
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
* 0 0
YJMNEI 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
c m
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CD
COi-(,tR4eamna tr~ae-Me t>,46 62&#xfd;'O-s-q-eO,IZLV.6
        .0
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
 
YX NO ULI N/All YXNO U!] N/Al]NO U! N/Al-YV NO" ULI N/AL]YENO UO 32 Enter the equipment class name from Appendix B: Classes of Equipment.
OgD
<KC-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndn-nrP Nn" RR-19-173 C-337 Sheet 2 of 2 Equipment ID No. 0AV036 Equip. Class 1 2 (09) Fans Equipment Description Battery Room Exhaust Fan A Interaction Effects 7. Are softt by nearby equipment or structures?
-. 0 0
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
C'.
YNearAY 6048cI'l-olejidte ly Vlo4A.A0t499tO urn+ b'aO vOmr-&#xa3;.9. Do attached lines have adequate flexibility to avoid damage?YXND UQ N/AD YtKND U- N/AD Y)(NL- UD N/AE`10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YX ND Ur Other Adverse Conditions
Z:-
: 11. Have you looked for and found no other seismic conditions that could Y NEI U adversely affect the safety functions of the equipment?O Ie' .eac 4 V'i ofpw viesul u ent 1 7T M-Comments .(Additional pages may be added as necessary)
m
Evaluated by: Date: o._I / __. _ I- '0X! 3-/ IZ< C-4 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rlnrrinnnrPnr.P NKn* R-1 9-171 C-338
        .0 C
-~0 z 0 3* 0~~T-S CCD 00
2 CD
-CD z ~3 0 c m-5" 3 CD-C C)0 0 0)
        ~0.
-&#xfd; 02 z 0 CD 0 si >0. 3 on, R. 5 0 m 30 CD 0)
0 0
D3 3 CD 0 c m 30 CD CA 0)
0)
Sheet 1 of 2 Status:) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AV064 Equip. Class 1 2 (09) Fans Equipment Description DIG Building Vent Supply Fan Location:
 
Bldg. Diesel Generator Floor El. 151 Room, Area D/G-P g Building Manufacturer, Model, Etc. (optional but recommended)
Sheet 1 of 2 Status: )N U Seismic Walkdown Checklist (SWC)
:Amtifl, OLOW1aR 13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Equipment ID No. 0BK032                            Equip. Class1 2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location: Bldg. Emergency                    Floor El. 195                Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is the anchorage configuration verification required (i.e., is the item one Y4 NEI of the 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YRj NEI U'      N/AEl
YT(NE YZIND YE(NE]UE" N/AD UD N/AD Y[f NDI UD' N/ADl Ye/ND- UEI N/AD Y~dN[D ULI 12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y[K NEI UI] N/Al]
'C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm..qnnnHP-nr.&#xfd;-
oxidation?
Nn " RR-19-171 C-343 Sheet 2 of 2 Equipment ID No. 0AV064 Equip. Class 1 2 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             Y/9] NEIl UI' N/ALl
A)O , Mr-v TARO67,TS.
: 5. Is the anchorage configuration consistent with plant documentation?                   YI/"NOl UI- N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)
YdfN5 UE] N/Al]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL- N/Al]and masonry block walls not likely to collapse onto the equipment?
r4otr Anrtvra                            Iv~                        -oA~
kIO 0v~ V6ZML2'OMC l 6i5'9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y[N'NOI UI0 N/Al]Y[aNEI UE" Other Adverse Conditions
M4                    ~   /r-
: 11. Have you looked for and found no other seismic conditions that could Y[A' NEl U--adversely affect the safety functions of the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y1. NEI UEl potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          "C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                             C-347 Cnrrqnnnr1PnrP. Nn ' Rq-19-173
 
Sheet 2 of 2 Equipment ID No. 0BK032                          Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower FanB Interaction Effects
: 7. Are soft targets free from impact by, nearby equipment or structures?         YMNEI Ur- N/AEl
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y&#xfd;(NO U-1 N/AU and masonry block walls not likely to collapse onto the equipment?
LC.ceA C.           6&#xfd;, .. L    ldO  E rT. Tlvvm'C&#xfd;rt, no ove, 44Se"le--6'4 J 1 b t4te          Syst-,C4
                                                .L"40  Vti -S Xt &#xfd;-Z3-A
: 9. Do attached lines have adequate flexibility to avoid damage?               Y7(NEI Ur' N/A[l
: 10. Based on the above seismic interaction evaluations, is equipment free       YpqNEIUUO of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YL NO Url adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
V I A Evaluated by:.Date: AbOW-1IZ8f/ 261 -Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Nn -RR=19-171 C-344 j3 0 z o~* 0 0 c m CD.0 OgD-.0 0 C'.Z:-m.0 C 2 CD~0.0 0 0)
L41A4&#xfd; 0, l-.y Moa'1,~r ynot'W/              (e,(fryv    /D L6M/t4~                              g  ~  t Evaluated by:           &-?,ja C-Jr k1or Date:         2-/2-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                 C-348 rnrrmnnndrInri. Nn" R,-19-17.1
Sheet 1 of 2 Status: ) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0BK032 Equip. Class 1 2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location:
 
Bldg. Emergency Floor El. 195 Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)
S~0 3
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
z   o*
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
0 3) 0~
Y4 NEI 2. Is the anchorage free of bent, broken, missing or loose hardware?
0 S
YRj NEI U' N/AEl 3. Is the anchorage free of corrosion that is more than mild surface Y[K NEI UI] N/Al]oxidation?
c) m CD CI
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y/9] NEIl UI' N/ALl 5. Is the anchorage configuration consistent with plant documentation?
 
YI/"NOl UI- N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)
Sheet 1 of 2 Status:     )N U Seismic Walkdown Checklist (SWC)
r4otr A nrtvra Iv~ -oA~ M4 ~ /r-6. Based on the above anchorage evaluations, is the anchorage free of Y1. NEI UEl potentially adverse seismic conditions?
Equipment ID No. 0BP057                                Equip. Class12 (06) Vertical Pumps P.niiinmr~iit Th  ~rint~nn Rmi~rcpnri,       S'orui,'o Wator  Pmnn R                                  A A.( A/%(IAAI~A Location: Bldg. Pump Structure                  Floor El. 112              Room, Area P/H-*      Vg.--
12 Enter the equipment class name from Appendix B: Classes of Equipment."C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Cnrrqnnnr1PnrP.
Manufacturer, Model, Etc. (optional but recommended)
Nn ' Rq-19-173 C-347 Sheet 2 of 2 Equipment ID No. 0BK032 Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Interaction Effects 7. Are soft targets free from impact by, nearby equipment or structures?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Anchorage
C. LC.ceA 6&#xfd;, ..L ldO E rT. Tlvvm'C&#xfd;rt, no ove, 44Se"le--6'4 J t4 1 b te Syst-,C4 .L"40 Vti -S Xt &#xfd;-Z3-A 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YMNEI Y&#xfd;(NO Y7(NEI Ur- N/AEl U-1 N/AU Ur' N/A[l YpqNEIUUO Other Adverse Conditions
: 1. Is the anchorage configuration verification required (i.e., is the item one             YIIN5 of the 50% of SWEL items requiring such verification)?
: 11. Have you looked for and found no other seismic conditions that could YL NO Url adversely affect the safety functions of the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y'   NE UD N/AE
Comments (Additional pages may be added as necessary)
: 3. Is the anchorage free of corrosion that is more than mild surface                       YXNO UO N/Aii oxidation?
Moa'1,~r ynot'W/ (e,(fryv /D L6M/t4~L 4 1A4&#xfd; 0, l-.y g ~ t Evaluated by:&- ?,j a C-k1or Date: 2-/2-Jr Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndrInri.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Nn" R,-19-17.1 C-348 S~0 3 z o*0 3)0~0 S c)m CD CI Sheet 1 of 2 Status: )N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0BP057 Equip. Class 1 2 (06) Vertical Pumps P.niiinmr~iit Th ~rint~nn Rmi~rcpnri, S'orui,'o Wator Pmnn R A A.( A/%(IAAI~A Location:
: 5. Is the anchorage configuration consistent with plant documentation?                     YW NE UE N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).
Bldg. Pump Structure Floor El. 112 Room, Area Vg.--Manufacturer, Model, Etc. (optional but recommended)
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YNEI UE potentially adverse seismic conditions?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
12 Enter the equipment class name from Appendix B: Classes of Equipment.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
                                                            <&#xfd;C-3 >
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                 C-350 C.nrrP.nnndlPnrP. Nn - R.-19-17.1
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).
 
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Sheet 2 of 2 Equipment ID No. 0BP057                        Equip. Class 12 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects
YIIN5 Y ' NE UD N/AE YXNO UO N/Aii YW NE UE N/AD YNEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 7. Are soft targets free from impact by nearby equipment or structures?       Y<NLI- UFII N/Af
<&#xfd; C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C.nrrP.nnndlPnrP.
        ,No        5'~OnA
Nn -R.-19-17.1 C-350 Sheet 2 of 2 Equipment ID No. 0BP057 Equip. Class 1 2 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?,No 5'~ OnA 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YR NEI U[t N/Al and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines.have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y<NLI- UFII N/Af YR NEI U[t N/Al YX Nil U-1 N/All YX NO UD Other Adverse Conditions
: 9. Do attached lines.have adequate flexibility to avoid damage?              YX Nil U-1 N/All
: 11. Have you looked for and found no other seismic conditions that could Yd ND U'adversely affect the safety functions of the equ&#xfd;ipment?, .N ,U" Comments.(Additional pages may be added as necessary)
: 10. Based on the above seismic interaction evaluations, is equipment free     YX NO UD of potentially adverse seismic interaction effects?
.IC- C G ._ ,-P F poop Evaluated by:.I"r --4 Date: q/11 /qlidiorz< C-4>Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm-nnndr.nr.P.
Other Adverse Conditions
Nn
: 11. Have you looked for and found no other seismic conditions that could       Yd ND U'
* PS-19-171 C-351 I z oD 0~ 0* 0 M -cD m.M C.-D CD 0-4 CO 0 3 0 c)
                                                                              .        N                  ,U" adversely affect the safety functions of the equ&#xfd;ipment?,
Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)Equipment ID No. OBV030 Equip. Class" 2 (09) Fans Equipment Description Control Room Emergeny Ventilation Supply Fan B Location:
Comments.(Additional pages may be added as necessary)                                                   .
Bldg. Turbine Floor El. liJf . Room, Area"?f2.-
C GIC-                  ,-P._Fpoop Evaluated by:.        I"r - -4                                                    Date:  q/11 /
Fi-It Manufacturer, Model, Etc. (optional but recommended)
qlidiorz
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment.
                                                    < C-4>
on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                              C-351 rnrrm-nnndr.nr.P. Nn
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
* PS-19-171
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I z    oD 0~ 0
Y&#xfd;&sect;NEj Y,% NEI UE N/A[l Y&#xfd;O NEI UO N/Af]YIN NEI UO N/AEJ Ypn NEI UEI N/AE]a nd t oraqe 6,sx/'oo'
* 0
/b 5-- ~779--0 5k/-J eef /taA-- 0 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
    -
YO NEI E 12 Enter the equipment class name from Appendix B: Classes of Equipment.
M cD m
<C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (ThrrP&#xfd;nnnrin&#xfd;np-Nn
          .M C.
* R.q-12-17.*l C-354 Sheet 2 of 2 Equipment ID No. OBV030 Equip. Class" 2 (09) Fans Equipment Description Control Room Emergency Ventilation Supply Fan B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
          -D CD 0
AID' 6 0 F&- kuyelt/ZNEI UEJ N/AEI-8. Are-overhead equipment, distribution systems, ceiling tiles and lighting, NJ-- N] UEi N/A[ -'and masonry block walls not likely to collaps onto the equipment?  
            -4
/-,t~~~~~o~~~4,>,~~~) "Iv1 /~4 VV ~ coJ~ D~,~~~e d/ue 7')Gd&#xfd;r 9. Do attached lines have adequate flexibility.
 
to avoid damage?10. Based on the above seismic interaction evaluations,.
CO 03 0
is equipment free of potentially adverse seismic interaction effects?Y$M N[l UrI N/AEI YM NINUUE Other Adverse Conditions
c)
: 11. Have you looked for and found no other seismic conditions that could Y[X NEI UE]adversely affect the safety functions of the equipment?.rj, 4..r_/ r' far Flow, 5 /uv ,4-OA f" dy /e '/,' , ai 4k Fa. 0- ?~k 9 1 eead,,61/f fv- yesWO~ 4 61-es t'e/ -mA- -~/Date: ?12h-/0 P//V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm'qnnn'in.P Nn
 
* RR-19-1773 C-355
Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)
-w!.0'3--J cn m-o 2 3 CD C,, 0
Equipment ID No. OBV030                                Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergeny Ventilation Supply Fan B Location: Bldg. Turbine                        Floor El. liJf    .*    Room, Area"?f2.-       Fi-It Manufacturer, Model, Etc. (optional but recommended)
., w~~ CA ,~~~z ~* ~~CA~ -u CD'3 -Lw-J ~r~0 C=CA m.0 C CD~6-5 0 w 0 C,, 0 A =r z ~3 *m 3 CD C)0 0
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment. on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
-.0 0< >u 0 CA m-D 00 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0BV035 Equip. Class 1 2 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Location:
Anchorage
Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
: 1. Is the anchorage configuration verification required (i.e., is the item one             Y&#xfd;&sect;NEj of the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y,% NEI UE N/A[l
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface                       Y&#xfd;O NEI UO N/Af]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YIN NEI UO N/AEJ
eOJJFi6'4UA'noN M-1-CHes I)YC 62 &#xfd;6 --&#xfd; q 7 S&-d izt>,/. d 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?                     Ypn NEI UEI N/AE]
YI4NO Y)'ND UD N/AD Y NI- UEI N/AD.NA NEUI DN/A[1NEI UEI N/AE.Y~f NEI UED 12 Enter the equipment class name from Appendix B: Classes of Equipment.>Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrmqnnndPnc.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
In
a nd t oraqe    6,sx/'oo'    /b 5-- ~779--0 5k/-Jeef              /taA--  0
* R-12-17.C-360 Sheet 2 of 2 Equipment ID No. 0BV035 Equip. Class 1 2 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Interaction Effects.7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of                       YO  NEI E potentially adverse seismic conditions?
8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
* .5 ::..J~45 i~~r~ be+ ol w/9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?XjNEI U" N/AU YX NEl U- N/AUl Y)NI- UEJ N/AUU..Other Adverse Conditions
                                                              <C-3 >
: 11. Have you looked for and found no other seismic conditions that could YP(NE U --adversely affiet the safety. functions of the equipment?
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-354 (ThrrP&#xfd;nnnrin&#xfd;np- Nn
%I le3O~ I9Ydwn Ov'ej 5 sWcoc* f/-O , ,,'(n .5 0/ .A *olj TbreotleA J~ ~~A r-e~ .yA~VI"OJ Ve 'Q Af -Comments (Additional pages may be added as necessary) 4l/A Evaluated by: Date: (_6/ N_ 1WI__4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (.nrrA-nnnriP.nr.
* R.q-12-17.*l
Nn
 
* RR-19-171 C-361 OD j3 0 0~ 3 z 0 M -0 0-4 L43 m.0-, 3 C)C)w 0 C, Stattt&#xfd;JYN U Seismic Walkdown Checklist (SWC).A Equipment ID No. C, / VO 3 A, Equip. Class'2 ..(4 Equipment Description 6 t9'414*( ROO& P A!2,,-f 07) 15014&#xfd;vlr Location:
Sheet 2 of 2 Equipment ID No. OBV030                          Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergency Ventilation Supply FanB Interaction Effects
Bldg. -'Manufacturer, Model, Etc. (op Floor El. L&T Room, Area 'FA,' Oe0A (A. a/s coss'e,'/
: 7. Are soft targets free from impact by nearby equipment or structures?           /ZNEI UEJ N/AEI AID' 6 0 F&-    kuyelt
h tional but recommended)
    -8. Are-overhead equipment, distribution systems, ceiling tiles and lighting,       N] UEi N/A[ -'
/  Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
NJ--
Additionil space is provided at the end of this checklist for documenting other comments.Anchorawe 1. Is the anchorage configuration verification required (i.e., is the item one Y NiNO of the 50% of SWEL items requiring such verification)?
and masonry block walls not likely to collaps onto the equipment?           /-
: 2. Is the anchage free of bent, broken, missing or loose hardware?Isthanc 4 5gea C49 YJANO UI- N/A-3. Is the anchorage free of corrosion that is more than mild surface oxidation?
                                ,t~~~~~o~~~4,>,~~~)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
                                            /~4    VV        ~    coJ~      D~,~~~e        "Iv1 d/ue 7')Gd&#xfd;r
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 9. Do attached lines have adequate flexibility.to avoid damage?                Y$M N[l UrI N/AEI
YRNO UCr N/A-YANOI YAjNC UCI N/Ar-UI- N/A['V4&#xfd;NO UO 12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations,. is equipment free      YM NINUUE of potentially adverse seismic interaction effects?
< C-3>Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f Nn ' RR-19-A7.C-363 Sheet 2 of 2 Equipment ID No.Equipment Descript t?6V OS Equip. Classi2W .L+/-ion F4c- t, Interaction Effects 7. Are soft targets free from impact by Rearby equipment or structures?
Other Adverse Conditions
NO Y%9-r[l U- N/ACI 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no other seismic conditions that could        Y[X NEI UE]
No~Pi 604' :- ,le.UO Is N/ACI hoo 0.6 9. Do attached lines have adequate flexibility to avoid damage?10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free of potentially adverse seismic interaction effects?Y5E4O UQI N/ACI Y~fNC Urj Other Adverse Conditions
adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y5,,N-J Ur adversely affect the safety functions of the equipment?
          .rj,          4..r_/         r'    far Flow, 5 /uv ,4-OA F5-*        f" dy      /e      '/,'      ,
ai4k Fa.             ?~k 0-9 1 eead,,61/f fv-  yesWO~    4 61-es-~/ t'e/
                                                                              -mA-Date:        ?12h-
                                                                                                /0P//
V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                    C-355 rnrrm'qnnn'in.P Nn
* RR-19-1773
 
  -    w
    !.0
  '3-
-J cn m
          -o 2
3 CD C,,
0
 
.,    w
~
~ CA
,
~
~
~
z  ~* ~
  ~
CA
~    -u CD
'3    -
Lw
-J
~    ~r 0
C
      =
CA m
        .0 C
CD
          ~6-5 0
w 0
C,,
0
 
A  =r z ~
3*
m CD C) 3 0
0
 
-. 0 0
< >u 0
CA m
      -D 0
w*
0
 
Sheet 1 of 2 Status:    N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0BV035                            Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Location: Bldg. Radwaste                    Floor El. 165                Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one          YI4NO of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y)'ND UD N/AD
: 3. Is the anchorage free of corrosion that is more than mild surface                    Y    NI- UEI N/AD.
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?              NA NEUI    DN/A[1
: 5. Is the anchorage configuration consistent with plant documentation?                 Y*f NEI UEI N/AE.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
eOJJFi6'4UA'noN      M-1-CHes      I)YC      62 &#xfd;6  -  -&#xfd; q7 S&-d    izt>,/. d
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y~f NEI UED potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          *C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                            C-360 r.nrrmqnnndPnc. In
* R-12-17.
 
Sheet 2 of 2 Equipment ID No. 0BV035                          Equip. Class1 2 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Interaction Effects.
: 7. Are soft targets free from impact by nearby equipment or structures?          XjNEI U" N/AU 8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, YX NEl U-         N/AUl and masonry block walls not likely to collapse onto the equipment?
        *. 5::..J~45                                    i~~r~ be+      ol      w/
: 9. Do attached lines have adequate flexibility to avoid damage?                  Y)NI- UEJ N/AU
: 10. Based on the above seismic interaction evaluations, is equipment free        Y)*N    U..
of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could          YP(NE    U      --
adversely affiet the safety. functions of the equipment?
                  %Ile3O~f/-O                        I9Ydwn          Ov'ej        5    sWcoc
                *                        , ,,'(n  .5  0/    .A            *olj TbreotleAJ~          Ao*    VI"OJ      Ve          -  'Q
                                                                          ~~A        r-e~  Af
                                                                                                    .yA~
Comments (Additional pages may be added as necessary) 4l/A Evaluated by:                                                                          Date:  (_6/N_1WI__
4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                    C-361
(.nrrA-nnnriP.nr. Nn
* RR-19-171
 
OD j3 0 0
  ~  3 z    0 M    -0 0
  -4 L43 m
        .0
        -,
3C)
C) w 0C,
 
Stattt&#xfd;JYN U Seismic Walkdown Checklist (SWC).
A Equipment IDNo.                   C, VO / 3 A,           Equip. Class'2      .. (4 07)    15014&#xfd;vlr Equipment Description              6    t9'414(     ROO&          P    A!2,,-f Location: Bldg.           -'               Floor El. L&T          Room, Area      'FA,' Oe0A        (A. a/s coss'e,'/ h Manufacturer, Model, Etc. (op tional but recommended)                                                                        / /*//:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.
Anchorawe
: 1. Is the anchorage configuration verification required (i.e., is the item one              Y    NiNO of the 50% of SWEL items requiring such verification)?
: 2. Is the anchage free of bent, broken, missing or loose hardware?                           YJANO UI- N/A-5gea          C49 Isthanc4
: 3. Is the anchorage free of corrosion that is more than mild surface                        YRNO UCr N/A-oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          UCI N/Ar-YANOI
: 5. Is the anchorage configuration consistent with plant documentation?                     YAjNC      UI- N/A['
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                        V4&#xfd;NO UO potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                                  < C-3>
Peach Bottom Atomic Power Station Unit 3                                                                              C-363 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f  Nn ' RR-19-A7.
 
Sheet 2 of 2 Equipment ID No.                  t?6V OS        Equip. Classi2W        .L+/-
Equipment Descript ion                      t,                         F4c-Interaction Effects
: 7. Are soft targets free from impact by Rearby equipment or structures?      Y%9-r[l U-   N/ACI NO
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI UO N/ACI and masonry block walls not likely to collapse onto the equipment?                      hoo0.6 No~Pi      604'  :-                                    ,le.         Is
: 9. Do attached lines have adequate flexibility to avoid damage?              Y5E4O UQI N/ACI
: 10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free   Y~fNC Urj of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y5,,N-J Ur adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Date: q//( 2- .Evaluated 21& 1 ZZ L -- -,< C-4 )>Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n Rn.-1-9-171-C-364  
Evaluated                                                                        Date:   q//( 2-       .
-0w* 0 z 0g 0 CD 0, m 1.0-o 3 CD 2 (D'-4  
21& 1ZZ L -- -
-fl j&#xfd; 0~z 04!* 0 T-m m C CD 0 C)
                                                      ,< C-4 )>
Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)* Equipment ID No. 0DE377 Equip. Class" 2 (21) Tanks or Heat Exchangers L t (I4r, o'20,-0 Equipment Description E4 Diesel Generator Lube Oil Cooler Location:
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n   Rn.-1-9-171-                                                                   C-364
Bldg. Diesel Generator Floor El. 127 Room, Area .()/6 Building Manufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
  -0w
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YX NEI of the 50% of SWEL items requiring such verification)?
* 0 z       0g 0
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
CD 0,
YI?1'N- ULI N/AD Y[E/NI- UED N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? YENI- U00 N/AD 5. Is the anchorage configuration consistent with plant documentation?
m 1.0
Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)
          -o 3
dw%, cv1 1>1-. colcu(&o-w Alo. 6 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
CD 2
YX NDI UD-12 Enter the equipment class name from Appendix B: Classes of Equipment.
(D
< C-3 >Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 CnrrmP.nnndPnr'.P Nn" PW-R -17.C-367 Sheet 2 of 2 EquipmentI No. 0DE377 Equip. Class 1 2 (21) Tanks or Heat Exehangers! ( ,0 Equipment Description E4 Diesel Generator Lube Oil Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
            '-4 5*
YIE1'NO UO N/AO 00 ,'919OT, 8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.and masonry block walls not likely to collapse onto the equipment?
 
U f qlA36n. -9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE3"NE] UD N/AEl Yg NE ULI Other Adverse Conditions
  - fl j&#xfd; 0~
: 11. Have you looked for and found no other seismic conditions that could Y[R(NU UU adversely affect the safety functions of the equipment?
z   04!
* 0 T-m C
m CD 0
C)
 
Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)
*Equipment ID No. 0DE377                               Equip. Class"2 (21) Tanks or Heat Exchangers           L     t (I4r, o'20,-0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Location: Bldg. Diesel Generator               Floor El. 127           Room, Area     .         ()/6 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one           YX NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YI?1'N-    ULI N/AD
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y[E/NI-     UED N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             YENI- U00 N/AD
: 5. Is the anchorage configuration consistent with plant documentation?                   Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)
dw%,cv1                                 1         >1-. colcu(&o-w Alo. 6
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YX NDI UD-potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                            < C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-367 CnrrmP.nnndPnr'.P Nn" PW-R -17.
 
Sheet 2 of 2 EquipmentI       No. 0DE377                     Equip. Class12 (21) Tanks or Heat Exehangers!           (   ,0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YIE1'NO UO N/AO 00                   ,'919OT,
: 8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.
and masonry block walls not likely to collapse onto the equipment?
U qlA36n.
f                -
: 9. Do attached lines have adequate flexibility to avoid damage?               YE3"NE] UD N/AEl
: 10. Based on the above seismic interaction evaluations, is equipment free     Yg NE ULI of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[R(NU UU adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
NAl/Evaluated by: Date: fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrP.nnndi-nrP Nn
NAl/
* RR-19-17.1 C-368 a).-3 0 z *0" 0 5.m-D C 2 CD=.-4.0 m ('3-4-.1  
Evaluated by:                                                                     Date:     9(h*hQ)1-fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-368 r.nrrP.nnndi-nrP Nn
;o C', 00 C&#xfd;a.-m 3a CD C)0 m-.4  
* RR-19-17.1
.-. 0 0-. 0 cn a 0O m-4}}
 
a)
.-3 0 z *0 0
    "
5.
m
        -D C
2 CD
        =
        .- 4.
0 m
('3
        -4
        -.1
 
;o C',
00 C&#xfd; a.-
m 3a CD C) 0 m
      -.4
 
.-. 0 0
-. 0 cn a
0O m
      -4}}

Revision as of 16:54, 11 November 2019

Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-310 Through Page C-371
ML13003A038
Person / Time
Site: Peach Bottom 
Issue date: 11/16/2012
From: Schlaseman C
MPR Associates
To:
Office of Nuclear Reactor Regulation, Exelon Generation Co
References
RS-12-173 MPR-3812, Rev 3
Download: ML13003A038 (62)


Text

Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AC097 Equip. Class"2 (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOAG12 ControlPanel Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y)NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y] NEI UE N/A[
3. Is the anchorage free of corrosion that is more than mild surface Y[O ND UED N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YP4 NEl UO N/AD
5. Is the anchorage configuration consistent with plant documentation? Y$ NE UE] N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y3NEI UE

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-310

.nrr*.nnnndi.nr, Nn* R.9-19-171

Sheet 2 of 2 Equipment IoD No. AC097 Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOA G12 ControlPanel Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yo NEI UEI N/A[3
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YKJ] NIl U- N/AL-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YK NEl UOI N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y NO UU1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YW NEI U" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

C- C , S..n2et- +LcZ Evaluated by:. Date:  ? ,5"//-..

461-1 !!ý 4 41-- /2.5 V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-311 (fnrrP.nnndpnr.P Nn

  • RR-19-17.1

0

'-U a.- 0)

0. o
  • 0

- 0 c

m

-3 CD C) 0 C-)

CC) 4I

Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAGO12 Equip. Class' 2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one Y[& NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YPI NE UD N/AD
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UD- N/AD3 oxidati'on? ,,
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO ND UDI N/A'-
5. Is the anchorage configuration consistent with plant documentation? YeN U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y$ NO UD3 potentially adverse seismic conditions?

2 1 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-313 f .nrrs nnnHPdnn.P. Nn

  • RR-19-171

Sheet 2 of 2 Equipment ID No. OAGO12 Equip. Class12 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[. NEI U-' N/All
8. re vereadequpmet,celin ties nd ighing istibuionsysems
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJ2 NOI Urn N/Al]

and masonry block walls not likely to collapse onto the equipment?

A'e ceU,/,i 1 oes or rntitnr>. 6 IoWe,$,.

9. Do attached lines have adequate flexibility to avoid damage? YA NEI Ul] N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YQý NEI UF of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YPO NOI U--1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A & V-eenp aVV /6 Me #uv ,4 //-e e,/ V

~~~~1F4~l .4e;< / Av i4e il, /'~ '

Evaluated by: Date; )-?/

'000Y ,;ý/zq of& -

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-314 rnrrPmsnnnr1iP.ln Nn

  • RRA-1-17

cl,

-. 03

'3 z 0n CA c

m 30 CD C)

G)

C)

'D

  • ý 0

- CD 0

z '

m

.0

-*0 CD 53

-3 0

  • 0 (A

m CD 2*

CD

K -0C O D

~CD

<. >

0 3u C.) C 0

m 30 CD

-. 1 5-

-0 Dý 0 3) 0 M"

m 3o CD C)

Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAP060 Equip. Class"2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil TransferPump Location: Bldg. Diesel Generator Floor El. ,2aoIi/ia..Room, Area D/G-3 Building 2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage.

I. Is the anchorage configuration verification required (i.e., is the item one YONM of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y1A NO UOI- N/AE
3. Is the anchorage free of corrosion that is more than mild surface Yf NEI UO N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI* NEI' UE N/AE 1V0 rh~..~ otm vcre-e-,

c-

5. Is the anchorage configuration consistent with plant documentation? YE NE UE N/AI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YNLIuEl potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >.

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-320

(.nrrP.nnndlnr.P. Nn RR-1 9-173

Sheet 2 of 2 Equipment ID No. OAP060 Equip. Class" (05) Horizontal Pu s Equipment Description El DIG Fuel Oil TransferPump Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y4 NE UD N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[INUI UI N/Al and masonry block walls not likely to collapse onto the equipment?
  • %.") oe~bttr Or 4OvSCtr( --
9. Do attached lines have adequate flexibility to avoid damage? Y$ NE UO N/AD
10. Based on the above seismic interaction evaluations, is equipment free YP NO U[-]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could . YN NEI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added, as necessary)

_____M___

ft Evaluated by: L**#4EEZ Date: _____ ____.

'1 .Z) /2-

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-321 CnrrP.-nnnr-nr*. Nn

  • RR-19-17.T

- u 0

  • 0 0~C cn CD 3

()

0 0

0

Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AP163 Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location: Bldg. Diesel Generator Floor El. ik211z_ p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NJ9 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIr NE UE N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE4 NEI Ul N/AL oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Ypa NEI UL N/AL
5. Is the anchorage configuration consistent with plant documentation? YE NEI UE N/AI9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-323 rnrrmnnnr1Pnrn Nn - RR-19-171

Sheet 2 of 2 Equipment ID No. 0AP163 Equip. Class12 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y, NO UO N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?

tL(? Al, 1 tFq ct/eSsV ev ecvre,/y 4tfida6 /VO Me- cet/,r11 AD

,~C49e o-, Hkib~'~ ri not- ec~4 c&v-~ t~4e-

,-

It( i4:) 0/b f-a l bio

/. 4 "--./S 'Ni -e 'entL, cei/at lh.oo* .. son1

9. Do attached lines have adequate flexibility to avoid damage? P4 NEI U! N/A1
10. Based on the above seismic interaction evaluations, is equipment free ANEIUO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YR NEI U-adversely affect the safety. functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9 '2 -

Q= ýAb V

<C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-324 rnrrPnnndPneP Nn

  • R,-19-17.

~~U)fl 0

D D CD,

-4 0 3.

C/

m

.0 c

-4.

3 CD C)

- o

0
  • 0

-~C:

m 3o CD 0)

-.0

Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)

OA-TO010 Equipment ID No. 4AT-W IA T */;i/i 2- Equip. Class". (21) Tanks or Heat Exchangers (Vertical)

Equipment Description E1 Diesel GeneratorFuel Oil Day Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist fordocumenting other comments.

Anchorage

  • 1. Is the anchorage configuration verification required (i.e., is the item one Y[ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[9 NEI UI N/A-
3. Is the anchorage free of corrosion that is more than mild surface Y[K NEI U- N/ADl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YK NEI UD- N/AD
5. Is the anchorage configuration consistent with plant documentation? YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.) 3 i/40-4n~4c~'(~~tf~v~ei 4 '~-Irs ,
6. Based on the above anchorage evaluations, is the anchorage free of Y)NU potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-327 r.nrrPqnnndn1n'.P Nn

  • RR-19-171

Sheet 2 of 2 Equipment ID No. OAT40 Equip. Class 12 (21) Tanks or Heat Exchangers (Vertical)

Equipment Description El Diesel GeneratorFuel Oil Day Tank Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NE Ur N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP4 NE UD N/AD and masonry block walls not likely to collapse onto the equipment?

,0o 0qAf5bnPX r~ ct-i7 0.,415 ,e

9. Do attached lines have adequate flexibility to avoid damage? YVI NO UO N/AU
10. Based on the above seismic interaction evaluations, is equipment free YX NEI UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y, NO UE" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: M -r,*.

5t Date: A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-328

.nrri-nnndPnr.P Nn

  • RR-19-17R

z U) 0 m

30 CD

Sheet 1 of 2

\ ~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096 Equip. Class"2 (21) Tanks or Heat Exchangers (Horizontal)

Equipment Description El Diesel GeneratorLube Oil Storage Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YDN) of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y; NEI U-' N/ADl
3. Is the anchorage free of corrosion that is more than mild surface YJI NDI- UD N/AED oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Ypk NDI UD- N/ADl:
5. Is the anchorage configuration consistent with plant documentation? YDI NDI UD- N/As4.

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

I /7' .1 A e."r~~ 21  % ~ ,i A IL- ftv' AtOf e 60 n h PVP -0'0 - 0 " W. el 7

6. Based on the above anchorage evaluations, is the anchorage free of ND UD potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

4C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-330 r.nrrmqnnndrnr.P.* Nn

  • RR-19-171

Sheet 2 of 2 Equipment ID No. 0AT096 Equip. Class12 (21) Tanks or Heat Exchangers (Horizontal)

Equipment Description El Diesel GeneratorLube Oil Storage Tank Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YX* NO UO N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yo NEI UO N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y5 NE UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YA NOl UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: 44~z Date:

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-331 rTnrrP.AnnnrlAnr. Nn

  • RR-19-173

-~0 z*0

  • 0

'33 cn m

n CD 0) co

Sh t1of2 Status N U Seismic WalkdownClieck1ist-(SWC)

Equipment ID No. A 030 Equipment Description C.go vfr.e Equip. Classt 60h (P) F-.*

  • '*_Vi,* .t t7,/z ,-*

Lcto:Bldg. 18 Floor El. 1Z (0S Rot'-A'ra "

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This chekdlist. may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings. Additional space is provided at the end of this checklist for docudtlenting -othercomments.

1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?

44ýI'd PVJr 0 (o2,00'V"-5"-

2. Is the anchorage free of bent, broken, missing or loose hardware? YKQNI UF N/AO t-5k 4AA44 10." t 4 ic f/t
3. Is the ancShorage free of codrosion that is more than mild surface Y_.NI" UDI N/AD' oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YA'[3IUQI N/AQ
5. Is the anchorage configuration consistent with plant documentation?- Yý N[3 UF3 N/A[r (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YXN[ UQ potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

% C-3 >

Peach Bottom Atomic Power Station Unit 3 C-333 MPR-3812, Revision 3

(-nrr~mnnnrfP.nrýn Nn* R-19-171

Sheet 2 of 2 Equipment ID No. .(

Equipment Description Interaction Effects . -

7. Are soft targets free. frn- immpactý by nearby equipmejit or structures?. Yg NO3 UQ N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?
9. Do attachedlines have adequate flexibility to avoid damage? yZ 41i U-I N/AO q -

1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free. -, NO UOi of potentially adverse seismic interaction effects?

I.. . ",.'," . ......" _. S,. *: , '1 ,'--.'z Mk I, .

  • t'i( i ." .')

Other Adverne Conditions

11. Have you looked for and found no other seismic conditions that could YJI'-NO UOI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: I -

( C4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn RR-19-17C- C-334

0

'-

z 'o

  • 0

. cn m

"0° 3

CD C

0CA) 0 0

-~0 z*0 Z ;a

-3 CD 0 cn C.)

"0 m

CD 3

C 2

0 0*

0

Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AV036 Equip. Class"2 (09) Fans Equipment Description Battery Room Exhaust FanA Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YJMNEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YX NO ULI N/All
3. Is the anchorage free of corrosion that is more than mild surface YXNO U!] N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? NO U! N/Al-
5. Is the anchorage configuration consistent with plant documentation? YV NO" ULI N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

COi-(,tR4eamna tr~ae-Me t>,46 62ý'O-s-q-eO,IZLV.6

6. Based on the above anchorage evaluations, is the anchorage free of YENO UO potentially adverse seismic conditions?

32Enter the equipment class name from Appendix B: Classes of Equipment.

<KC-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-337 rnrrmnnndn-nrP Nn" RR-19-173

Sheet 2 of 2 Equipment ID No. 0AV036 Equip. Class12 (09) Fans Equipment Description Battery Room Exhaust FanA Interaction Effects

7. Are softt by nearby equipment or structures? YXND UQ N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YtKND U- N/AD and masonry block walls not likely to collapse onto the equipment?

YNearAY 6048cI'l- olejidte ly Vlo4A.

A0t499tOb'aOvOmr-£.

urn+

9. Do attached lines have adequate flexibility to avoid damage? Y)(NL- UD N/AE`
10. Based on the above seismic interaction evaluations, is equipment free YX ND Ur of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y NEI U adversely affect the safety functions of the equipment?O Ie' or* .eac4 V'i viesul u ofpw 7T ent 1 M-Comments .(Additional pages may be added as necessary)

Evaluated by: Date: __. /

o._I _ I-'0X

!3-/ IZ

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-338 rlnrrinnnrPnr.P NKn* R-1 9-171

-~0 z 0 3

  • 0

~~T-S CCD 00

- CD z ~3 0

c m

-5" 3CD

-C C) 0 0

0)

-ý 02 z 0 CD 0 si >

0. 3 on, 5

R.

0 m

30 CD 0)

D3 3 CD 0

c m

30 CD CA 0)

Sheet 1 of 2 Status:) N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-P g Building Manufacturer, Model, Etc. (optional but recommended) :Amtifl, OLOW1aR *T*N 13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YT(NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZIND UE" N/AD
3. Is the anchorage free of corrosion that is more than mild surface YE(NE] UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[f NDI UD' N/ADl
5. Is the anchorage configuration consistent with plant documentation? Ye/ND- UEI N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y~dN[D ULI potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

'C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-343 rnrrm..qnnnHP-nr.ý- Nn " RR-19-171

Sheet 2 of 2 Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YdfN5 UE] N/Al]

A)O ,Mr-v TARO67,TS.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL- N/Al]

and masonry block walls not likely to collapse onto the equipment?

kIO 0v~

V6ZML2'OMC l6i5'

9. Do attached lines have adequate flexibility to avoid damage? Y[N'NOI UI0 N/Al]
10. Based on the above seismic interaction evaluations, is equipment free Y[aNEI UE" of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[A' NEl U--

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

VIA Evaluated by:. Date: AbOW

-1IZ8f/261 -

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-344 (lnrrm.*nnndHnr.P Nn - RR=19-171

j3 0 z o~

  • 0 0

c m

CD

.0

OgD

-. 0 0

C'.

Z:-

m

.0 C

2 CD

~0.

0 0

0)

Sheet 1 of 2 Status: )N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BK032 Equip. Class1 2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location: Bldg. Emergency Floor El. 195 Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y4 NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YRj NEI U' N/AEl
3. Is the anchorage free of corrosion that is more than mild surface Y[K NEI UI] N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y/9] NEIl UI' N/ALl
5. Is the anchorage configuration consistent with plant documentation? YI/"NOl UI- N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)

r4otr Anrtvra Iv~ -oA~

M4 ~ /r-

6. Based on the above anchorage evaluations, is the anchorage free of Y1. NEI UEl potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

"C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-347 Cnrrqnnnr1PnrP. Nn ' Rq-19-173

Sheet 2 of 2 Equipment ID No. 0BK032 Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower FanB Interaction Effects

7. Are soft targets free from impact by, nearby equipment or structures? YMNEI Ur- N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yý(NO U-1 N/AU and masonry block walls not likely to collapse onto the equipment?

LC.ceA C. 6ý, .. L ldO E rT. Tlvvm'Cýrt, no ove, 44Se"le--6'4 J 1 b t4te Syst-,C4

.L"40 Vti -S Xt ý-Z3-A

9. Do attached lines have adequate flexibility to avoid damage? Y7(NEI Ur' N/A[l
10. Based on the above seismic interaction evaluations, is equipment free YpqNEIUUO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YL NO Url adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

L41A4ý 0, l-.y Moa'1,~r ynot'W/ (e,(fryv /D L6M/t4~ g ~ t Evaluated by: &-?,ja C-Jr k1or Date: 2-/2-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-348 rnrrmnnndrInri. Nn" R,-19-17.1

S~0 3

z o*

0 3) 0~

0 S

c) m CD CI

Sheet 1 of 2 Status: )N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BP057 Equip. Class12 (06) Vertical Pumps P.niiinmr~iit Th ~rint~nn Rmi~rcpnri, S'orui,'o Wator Pmnn R A A.( A/%(IAAI~A Location: Bldg. Pump Structure Floor El. 112 Room, Area P/H-* Vg.--

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YIIN5 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y' NE UD N/AE
3. Is the anchorage free of corrosion that is more than mild surface YXNO UO N/Aii oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation? YW NE UE N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).
6. Based on the above anchorage evaluations, is the anchorage free of YNEI UE potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<ýC-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-350 C.nrrP.nnndlPnrP. Nn - R.-19-17.1

Sheet 2 of 2 Equipment ID No. 0BP057 Equip. Class 12 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y<NLI- UFII N/Af

,No 5'~OnA

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YR NEI U[t N/Al and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines.have adequate flexibility to avoid damage? YX Nil U-1 N/All
10. Based on the above seismic interaction evaluations, is equipment free YX NO UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yd ND U'

. N ,U" adversely affect the safety functions of the equýipment?,

Comments.(Additional pages may be added as necessary) .

C GIC- ,-P._Fpoop Evaluated by:. I"r - -4 Date: q/11 /

qlidiorz

< C-4>

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-351 rnrrm-nnndr.nr.P. Nn

  • PS-19-171

I z oD 0~ 0

  • 0

-

M cD m

.M C.

-D CD 0

-4

CO 03 0

c)

Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergeny Ventilation Supply Fan B Location: Bldg. Turbine Floor El. liJf .* Room, Area"?f2.- Fi-It Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment. on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Yý§NEj of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y,% NEI UE N/A[l
3. Is the anchorage free of corrosion that is more than mild surface YýO NEI UO N/Af]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YIN NEI UO N/AEJ
5. Is the anchorage configuration consistent with plant documentation? Ypn NEI UEI N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

a nd t oraqe 6,sx/'oo' /b 5-- ~779--0 5k/-Jeef /taA-- 0

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI E potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-354 (ThrrPýnnnrinýnp- Nn

  • R.q-12-17.*l

Sheet 2 of 2 Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergency Ventilation Supply FanB Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? /ZNEI UEJ N/AEI AID' 6 0 F&- kuyelt

-8. Are-overhead equipment, distribution systems, ceiling tiles and lighting, N] UEi N/A[ -'

NJ--

and masonry block walls not likely to collaps onto the equipment? /-

,t~~~~~o~~~4,>,~~~)

/~4 VV ~ coJ~ D~,~~~e "Iv1 d/ue 7')Gdýr

9. Do attached lines have adequate flexibility.to avoid damage? Y$M N[l UrI N/AEI
10. Based on the above seismic interaction evaluations,. is equipment free YM NINUUE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[X NEI UE]

adversely affect the safety functions of the equipment?

.rj, 4..r_/ r' far Flow, 5 /uv ,4-OA F5-* f" dy /e '/,' ,

ai4k Fa.  ?~k 0-9 1 eead,,61/f fv- yesWO~ 4 61-es-~/ t'e/

-mA-Date: ?12h-

/0P//

V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-355 rnrrm'qnnn'in.P Nn

  • RR-19-1773

- w

!.0

'3-

-J cn m

-o 2

3 CD C,,

0

., w

~

~ CA

,

~

~

~

z ~* ~

~

CA

~ -u CD

'3 -

Lw

-J

~ ~r 0

C

=

CA m

.0 C

CD

~6-5 0

w 0

C,,

0

A =r z ~

3*

m CD C) 3 0

0

-. 0 0

< >u 0

CA m

-D 0

w*

0

Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BV035 Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI4NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y)'ND UD N/AD
3. Is the anchorage free of corrosion that is more than mild surface Y NI- UEI N/AD.

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? NA NEUI DN/A[1
5. Is the anchorage configuration consistent with plant documentation? Y*f NEI UEI N/AE.

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

eOJJFi6'4UA'noN M-1-CHes I)YC 62 ý6 - -ý q7 S&-d izt>,/. d

6. Based on the above anchorage evaluations, is the anchorage free of Y~f NEI UED potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

  • C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-360 r.nrrmqnnndPnc. In

  • R-12-17.

Sheet 2 of 2 Equipment ID No. 0BV035 Equip. Class1 2 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Interaction Effects.

7. Are soft targets free from impact by nearby equipment or structures? XjNEI U" N/AU 8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, YX NEl U- N/AUl and masonry block walls not likely to collapse onto the equipment?
  • . 5::..J~45 i~~r~ be+ ol w/
9. Do attached lines have adequate flexibility to avoid damage? Y)NI- UEJ N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y)*N U..

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YP(NE U --

adversely affiet the safety. functions of the equipment?

%Ile3O~f/-O I9Ydwn Ov'ej 5 sWcoc

  • , ,,'(n .5 0/ .A *olj TbreotleAJ~ Ao* VI"OJ Ve - 'Q

~~A r-e~ Af

.yA~

Comments (Additional pages may be added as necessary) 4l/A Evaluated by: Date: (_6/N_1WI__

4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-361

(.nrrA-nnnriP.nr. Nn

  • RR-19-171

OD j3 0 0

~ 3 z 0 M -0 0

-4 L43 m

.0

-,

3C)

C) w 0C,

StatttýJYN U Seismic Walkdown Checklist (SWC).

A Equipment IDNo. C, VO / 3 A, Equip. Class'2 .. (4 07) 15014ývlr Equipment Description 6 t9'414( ROO& P A!2,,-f Location: Bldg. -' Floor El. L&T Room, Area 'FA,' Oe0A (A. a/s coss'e,'/ h Manufacturer, Model, Etc. (op tional but recommended) / /*//:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.

Anchorawe

1. Is the anchorage configuration verification required (i.e., is the item one Y NiNO of the 50% of SWEL items requiring such verification)?
2. Is the anchage free of bent, broken, missing or loose hardware? YJANO UI- N/A-5gea C49 Isthanc4
3. Is the anchorage free of corrosion that is more than mild surface YRNO UCr N/A-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? UCI N/Ar-YANOI
5. Is the anchorage configuration consistent with plant documentation? YAjNC UI- N/A['

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of V4ýNO UO potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3>

Peach Bottom Atomic Power Station Unit 3 C-363 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f Nn ' RR-19-A7.

Sheet 2 of 2 Equipment ID No. t?6V OS Equip. Classi2W .L+/-

Equipment Descript ion t, F4c-Interaction Effects

7. Are soft targets free from impact by Rearby equipment or structures? Y%9-r[l U- N/ACI NO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI UO N/ACI and masonry block walls not likely to collapse onto the equipment? hoo0.6 No~Pi 604'  :- ,le. Is
9. Do attached lines have adequate flexibility to avoid damage? Y5E4O UQI N/ACI
10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free Y~fNC Urj of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y5,,N-J Ur adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated Date: q//( 2- .

21& 1ZZ L -- -

,< C-4 )>

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n Rn.-1-9-171- C-364

-0w

  • 0 z 0g 0

CD 0,

m 1.0

-o 3

CD 2

(D

'-4 5*

- fl jý 0~

z 04!

  • 0 T-m C

m CD 0

C)

Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)

  • Equipment ID No. 0DE377 Equip. Class"2 (21) Tanks or Heat Exchangers L t (I4r, o'20,-0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Location: Bldg. Diesel Generator Floor El. 127 Room, Area . ()/6 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YX NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI?1'N- ULI N/AD
3. Is the anchorage free of corrosion that is more than mild surface Y[E/NI- UED N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YENI- U00 N/AD
5. Is the anchorage configuration consistent with plant documentation? Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)

dw%,cv1 1 >1-. colcu(&o-w Alo. 6

6. Based on the above anchorage evaluations, is the anchorage free of YX NDI UD-potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-367 CnrrmP.nnndPnr'.P Nn" PW-R -17.

Sheet 2 of 2 EquipmentI No. 0DE377 Equip. Class12 (21) Tanks or Heat Exehangers! ( ,0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIE1'NO UO N/AO 00 ,'919OT,
8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.

and masonry block walls not likely to collapse onto the equipment?

U qlA36n.

f -

9. Do attached lines have adequate flexibility to avoid damage? YE3"NE] UD N/AEl
10. Based on the above seismic interaction evaluations, is equipment free Yg NE ULI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[R(NU UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NAl/

Evaluated by: Date: 9(h*hQ)1-fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-368 r.nrrP.nnndi-nrP Nn

  • RR-19-17.1

a)

.-3 0 z *0 0

"

5.

m

-D C

2 CD

=

.- 4.

0 m

('3

-4

-.1

o C',

00 Cý a.-

m 3a CD C) 0 m

-.4

.-. 0 0

-. 0 cn a

0O m

-4