Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Security -Related Information | | {{#Wiki_filter:Security - Related Information - Thomas D. Gatlin Withhold Under 10 CFR 2.390 Vice President,Nuclear Operations 803.345.4342 November 26, 2013 A SCANA COMPANY RC-1 3-0166 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attn: S. A. Williams |
| -Thomas D. Gatlin Withhold Under 10 CFR 2.390 Vice President, Nuclear Operations 803.345.4342 November 26, 2013 A SCANA COMPANY RC-1 3-0166 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attn: S. A. Williams | |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
Line 27: |
Line 26: |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk, License Amendment Request -LAR-06-00055, "License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" dated November 15, 2011 (RC-11-0149) | | : 1. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk, License Amendment Request - LAR-06-00055, "License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" dated November 15, 2011 (RC-11-0149) [ML11321A172] |
| [ML11321A172] | | : 2. Robert E. Martin, NRC, to Thomas D. Gatlin "Virgil C. Summer Nuclear Station Unit - 1 (VCSNS) - Request for Additional Information (TAC NO. ME7586)" |
| : 2. Robert E. Martin, NRC, to Thomas D. Gatlin "Virgil C. Summer Nuclear Station Unit -1 (VCSNS) -Request for Additional Information (TAC NO. ME7586)" dated August 28, 2013 [ML13234A442]3. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk," License Amendment Request -LAR-06-00055 License Amendment Request to Adopt NFPA 805 Response to Request for Additional Information" dated October 14, 2013 (RC-13-0142) | | dated August 28, 2013 [ML13234A442] |
| South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority pursuant to 10 CFR 50.90, submitted a License Amendment Request (LAR) per Reference I to adopt NFPA 805. NRC review and audit of this request determined that additional information was required and a Request for Additional Information (RAI) was issued per Reference 2.Attachment 1 of this letter provides SCE&G's response to the RAIs.In addition to responding to RAls, SCE&G has revised LAR Attachment S, which is included as Attachment 2 of this letter. This attachment replaces all previous versions in its entirety.When Separated from Attachments, this Transmittal Document is Decontrolled. | | : 3. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk," License Amendment Request - LAR-06-00055 License Amendment Request to Adopt NFPA 805 Response to Request for Additional Information" dated October 14, 2013 (RC-13-0142) |
| 00 Virgil C. Summer Station .Post Office Box 88. Jenkinsville, SC .29065 .F (803) 941-9776 V-1 Document Control Desk LAR-06-00055 RC-13-0166 Page 2 of 2 Attachment 3 "List of Commitments" reflects the due date for new Implementation Item 23, added per response to PRA 54.If you have any questions about this submittal, please contact Mr. Bruce L. Thompson at (803) 931-5042.I certify under penalty of perjury that the foregoing is correct and true.I //)z, /1 -5 Thomas D. Gatlin Executed on RLP/TDG/ts Attachments:
| | South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority pursuant to 10 CFR 50.90, submitted a License Amendment Request (LAR) per Reference I to adopt NFPA 805. NRC review and audit of this request determined that additional information was required and a Request for Additional Information (RAI) was issued per Reference 2. of this letter provides SCE&G's response to the RAIs. |
| : 1. Probabilistic Risk Assessment (PRA) Request for Additional Information (RAI)Responses 2. LAR Attachment S -Plant Modifications and Items to be Completed During Implementation. | | In addition to responding to RAls, SCE&G has revised LAR Attachment S, which is included as Attachment 2 of this letter. This attachment replaces all previous versions in its entirety. |
| : 3. List of Regulatory Commitments c: Without Attachments unless noted K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton J. W. Williams W. M. Cherry V. M. McCree (with Attachments) | | Document is Decontrolled. 00 When Separated from Attachments, this Transmittal Virgil C.Summer Station . Post Office Box 88. Jenkinsville, SC. 29065 . F (803) 941-9776 V-1 |
| S. A. Williams (with Attachments) | | |
| NRC Resident Inspector S. E. Jenkins Paulette Ledbetter K. M. Sutton NSRC RTS (CR-06-00055)
| | Document Control Desk LAR-06-00055 RC-13-0166 Page 2 of 2 Attachment 3 "List of Commitments" reflects the due date for new Implementation Item 23, added per response to PRA 54. |
| File (813.20)PRSF (RC-13-0166) (with Attachments)
| | If you have any questions about this submittal, please contact Mr. Bruce L. Thompson at (803) 931-5042. |
| | I certify under penalty of perjury that the foregoing is correct and true. |
| | I//)z, /1-5 Executed on Thomas D. Gatlin RLP/TDG/ts Attachments: |
| | : 1. Probabilistic Risk Assessment (PRA) Request for Additional Information (RAI) |
| | Responses |
| | : 2. LAR Attachment S - Plant Modifications and Items to be Completed During Implementation. |
| | : 3. List of Regulatory Commitments c: Without Attachments unless noted NRC Resident Inspector K. B. Marsh S. E. Jenkins S. A. Byrne Paulette Ledbetter J. B. Archie K. M. Sutton N. S. Cams NSRC J. H. Hamilton RTS (CR-06-00055) |
| | J. W. Williams File (813.20) |
| | W. M. Cherry PRSF (RC-13-0166) (with V. M. McCree (with Attachments) Attachments) |
| | S. A. Williams (with Attachments) |
| When Separated from Attachments, this Transmittal Document is Decontrolled.}} | | When Separated from Attachments, this Transmittal Document is Decontrolled.}} |
|
---|
Category:Fire Protection Plan
MONTHYEARML20324A7372020-11-19019 November 2020 (Vcsns), Unit 1 - License Renewal Commitment Fire Protection Program - Sprinkler Head Inspection Date Change RC-13-0166, License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information2013-11-26026 November 2013 License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information ML11332A0782011-11-15015 November 2011 License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2 ML11332A0772011-11-15015 November 2011 License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 1 of 2 2020-11-19
[Table view] Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Security - Related Information - Thomas D. Gatlin Withhold Under 10 CFR 2.390 Vice President,Nuclear Operations 803.345.4342 November 26, 2013 A SCANA COMPANY RC-1 3-0166 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Attn: S. A. Williams
Dear Sir or Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NFP-12 LICENSE AMENDMENT REQUEST- LAR-06-00055 LICENSE AMENDMENT REQUEST TO ADOPT NFPA 805 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
References:
- 1. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk, License Amendment Request - LAR-06-00055, "License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" dated November 15, 2011 (RC-11-0149) [ML11321A172]
- 2. Robert E. Martin, NRC, to Thomas D. Gatlin "Virgil C. Summer Nuclear Station Unit - 1 (VCSNS) - Request for Additional Information (TAC NO. ME7586)"
dated August 28, 2013 [ML13234A442]
- 3. Thomas D. Gatlin, SCE&G, Letter to NRC Document Control Desk," License Amendment Request - LAR-06-00055 License Amendment Request to Adopt NFPA 805 Response to Request for Additional Information" dated October 14, 2013 (RC-13-0142)
South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority pursuant to 10 CFR 50.90, submitted a License Amendment Request (LAR) per Reference I to adopt NFPA 805. NRC review and audit of this request determined that additional information was required and a Request for Additional Information (RAI) was issued per Reference 2. of this letter provides SCE&G's response to the RAIs.
In addition to responding to RAls, SCE&G has revised LAR Attachment S, which is included as Attachment 2 of this letter. This attachment replaces all previous versions in its entirety.
Document is Decontrolled. 00 When Separated from Attachments, this Transmittal Virgil C.Summer Station . Post Office Box 88. Jenkinsville, SC. 29065 . F (803) 941-9776 V-1
Document Control Desk LAR-06-00055 RC-13-0166 Page 2 of 2 Attachment 3 "List of Commitments" reflects the due date for new Implementation Item 23, added per response to PRA 54.
If you have any questions about this submittal, please contact Mr. Bruce L. Thompson at (803) 931-5042.
I certify under penalty of perjury that the foregoing is correct and true.
I//)z, /1-5 Executed on Thomas D. Gatlin RLP/TDG/ts Attachments:
- 1. Probabilistic Risk Assessment (PRA) Request for Additional Information (RAI)
Responses
- 2. LAR Attachment S - Plant Modifications and Items to be Completed During Implementation.
- 3. List of Regulatory Commitments c: Without Attachments unless noted NRC Resident Inspector K. B. Marsh S. E. Jenkins S. A. Byrne Paulette Ledbetter J. B. Archie K. M. Sutton N. S. Cams NSRC J. H. Hamilton RTS (CR-06-00055)
J. W. Williams File (813.20)
W. M. Cherry PRSF (RC-13-0166) (with V. M. McCree (with Attachments) Attachments)
S. A. Williams (with Attachments)