{{#Wiki_filter:December 30, 2013  
{{#Wiki_filter:December 30, 2013 Mr. Richard J. St. Onge, Director Nuclear Regulatory Affairs and Emergency Planning Southern California Edison Co.
 
P.O. Box 128 San Clemente, CA 92674
Mr. Richard J. St. Onge, Director  
 
Nuclear Regulatory Affairs and Emergency Planning  
 
Southern California Edison Co.
P.O. Box 128 San Clemente, CA 92674  


==SUBJECT:==
==SUBJECT:==
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. St. Onge:==
==Dear Mr. St. Onge:==


On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.  
On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
 
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.
If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.
Sincerely,
Sincerely,
 
                                                  /RA/
      /RA/ Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials and Environmental Management Programs  
Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-206
 
Docket No.: 50-206  


==Enclosure:==
==Enclosure:==
Request for Additional Information  
Request for Additional Information cc: San Onofre Nuclear Generating Station Unit 1 Service List
 
cc: San Onofre Nuclear Generating Station Unit 1 Service List Mr. Richard J. St. Onge, Director Nuclear Regulatory Affairs and Emergency Planning


Southern California Edison Co. P.O. Box 128 San Clemente, CA 92674  
Mr. Richard J. St. Onge, Director Nuclear Regulatory Affairs and Emergency Planning Southern California Edison Co.
P.O. Box 128 San Clemente, CA 92674


==SUBJECT:==
==SUBJECT:==
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. St. Onge:==
==Dear Mr. St. Onge:==


On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,                                              
If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.
/RA/ Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs  
Sincerely,
 
                                                  /RA/
Docket No.: 50-206  
Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-206


==Enclosure:==
==Enclosure:==
Request for Additional Information  
Request for Additional Information cc: San Onofre Nuclear Generating Station Unit 1 Service List DISTRIBUTION: BSpitzberg, RIV                 AKock, NRR             KLois, NRR ML13352A091 OFFICE       DWMEP:PM           DWMEP:LA           DWMEP:PM         DWMEP:BC         DWMEP:PM NAME         MVaaler           CHolston           JShepherd         BWatson         MVaaler DATE       12 /20/ 2013     12 /24 / 2013     12 /20 / 2013     12 / 30 / 2013   12 / 30 / 2013 OFFICIAL RECORD COPY
 
cc: San Onofre Nuclear Generating Station Unit 1 Service List  
 
DISTRIBUTION: BSpitzberg, RIV AKock, NRR   KLois, NRR ML13352A091 OFFICE DWMEP:PM DWMEP:LA DWMEP:PM DWMEP:BC DWMEP:PM NAME MVaaler CHolston JShepherd BWatson MVaaler DATE 12 /20/ 2013 12 /24 / 2013 12 /20 / 2013 12 / 30 / 2013 12 / 30 / 2013 OFFICIAL RECORD COPY  
 
San Onofre Nuclear Generating Station Service List
 
cc:  Thomas Palmisano , Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA  92674-0128 Robert B. Scholler Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA  92674-0128
 
Walker A Matthews III, Esq.
 
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA  91770 


Esther K. Park, Esq.
San Onofre Nuclear Generating Station Service List cc:
 
Thomas Palmisano, Chief Nuclear Officer            Gary L. Nolff Southern California Edison Company                Power Projects/Contracts Manager San Onofre Nuclear Generating Station              Riverside Public Utilities P.O. Box 128                                      2911 Adams Street San Clemente, CA 92674-0128                        Riverside, CA 92504 Robert B. Scholler                                Eileen M. Teichert, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA  91770 Mayor, City of San Clemente 100 Avenida Presidio San Clemente, CA  92672
Southern California Edison Company                Supervising Deputy City Attorney San Onofre Nuclear Generating Station              City of Riverside P.O. Box 128                                      3900 Main Street San Clemente, CA 92674-0128                        Riverside, CA 92522 Walker A Matthews III, Esq.                        David Spath, Chief Southern California Edison Company                Division of Drinking Water and 2244 Walnut Grove Avenue                            Environmental Management Rosemead, CA 91770                                California Department of Health Services P.O. Box 942732 Esther K. Park, Esq.                              Sacramento, CA 94234-7320 Southern California Edison Company 2244 Walnut Grove Avenue                          Ed Bailey, Chief Rosemead, CA 91770                                Radiologic Health Branch State Department of Health Services Mayor, City of San Clemente                        P.O. Box 997414 (MS 7610) 100 Avenida Presidio                              Sacramento, CA 95899-7414 San Clemente, CA 92672 James D. Boyd, Commissioner Chairman, Board of Supervisors                    California Energy Commission County of San Diego                                1516 Ninth Street (MS 34) 1600 Pacific Highway, Room 335                    Sacramento, CA 95814 San Diego, CA 92101
 
Chairman, Board of Supervisors County of San Diego
 
1600 Pacific Highway, Room 335 San Diego, CA  92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities  
 
2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.
Supervising Deputy City Attorney City of Riverside  
 
3900 Main Street Riverside, CA 92522  
 
David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320  
 
Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414  
 
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) UNIT 1
 
The requests for additional information (RAIs) provided are in response to the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1. On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI # 1: Decommissioning Costs In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.


REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) UNIT 1 The requests for additional information (RAIs) provided are in response to the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1. On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1, as required under Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI # 1: Decommissioning Costs In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Per 10 CFR 50.82(a)(8)(v):
Per 10 CFR 50.82(a)(8)(v):
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
Accordingly, please provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Accordingly, please provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
RAI # 2: Managing Irradiated Fuel  
RAI # 2: Managing Irradiated Fuel In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.
 
In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.  
 
Per 10 CFR 50.82 (a)(8)(v)-(vii):
Per 10 CFR 50.82 (a)(8)(v)-(vii):
The licensee must annually submit to the NRC, by March 31, a report on the status of its funding for managing irradiated fuel. The report must include the following information, current through the end of the previous calendar year: The amount of funds accumulated to cover the cost of managing the irradiated fuel; the projected cost of managing irradiated fuel until title to the fuel and possession of the fuel is transferred to the Secretary of Energy; and if the funds accumulated do not cover the projected cost, a plan to obtain additional funds to cover the cost.
The licensee must annually submit to the NRC, by March 31, a report on the status of its funding for managing irradiated fuel. The report must include the following information, current through the end of the previous calendar year: The amount of funds accumulated to cover the cost of managing the irradiated fuel; the projected cost of managing irradiated fuel until title to the fuel and possession of the fuel is transferred to the Secretary of Energy; and if the funds accumulated do not cover the projected cost, a plan to obtain additional funds to cover the cost.
Accordingly, please provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.  
Accordingly, please provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.
Enclosure


RAI #3: Decommissioning Costs  
RAI #3: Decommissioning Costs In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars spent on decommissioning over the previous calendar year.
 
Per 10 CFR 50.82(a)(8)(v):
In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars spent on decommissioning over the previous calendar year.  
the licensee must annually submit to the NRC, by March 31, a financial assurance status report. The report must include the following information, current through the end of the previous calendar year: The amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon.
 
Accordingly, please provide the total amount of dollars spent on decommissioning over the previous calendar year.}}
Per 10 CFR 50.82(a)(8)(v):  
 
-the licensee must annually submit to the NRC, by March 31, a financial assurance status report. The report must include the following information, current through the end of the previous calendar year: The amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon.
Accordingly, please provide the total amount of dollars spent on decommissioning over the  
 
previous calendar year.}}

Revision as of 10:08, 4 November 2019

Decommissioning Funding Status Report - Request for Additional Information
ML13352A091
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/30/2013
From: Vaaler M
NRC/FSME/DWMEP/DURLD/RDB
To: Onge R
Southern California Edison Co
Vaaler M
References
Download: ML13352A091 (5)


Text

December 30, 2013 Mr. Richard J. St. Onge, Director Nuclear Regulatory Affairs and Emergency Planning Southern California Edison Co.

P.O. Box 128 San Clemente, CA 92674

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. St. Onge:

On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-206

Enclosure:

Request for Additional Information cc: San Onofre Nuclear Generating Station Unit 1 Service List

Mr. Richard J. St. Onge, Director Nuclear Regulatory Affairs and Emergency Planning Southern California Edison Co.

P.O. Box 128 San Clemente, CA 92674

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1, 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. St. Onge:

On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the San Onofre Nuclear Generating Station Unit 1 (SONGS Unit 1), as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning the above, please contact me at (301) 415-3178 or via email at Marlayna.Vaaler@nrc.gov.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-206

Enclosure:

Request for Additional Information cc: San Onofre Nuclear Generating Station Unit 1 Service List DISTRIBUTION: BSpitzberg, RIV AKock, NRR KLois, NRR ML13352A091 OFFICE DWMEP:PM DWMEP:LA DWMEP:PM DWMEP:BC DWMEP:PM NAME MVaaler CHolston JShepherd BWatson MVaaler DATE 12 /20/ 2013 12 /24 / 2013 12 /20 / 2013 12 / 30 / 2013 12 / 30 / 2013 OFFICIAL RECORD COPY

San Onofre Nuclear Generating Station Service List cc:

Thomas Palmisano, Chief Nuclear Officer Gary L. Nolff Southern California Edison Company Power Projects/Contracts Manager San Onofre Nuclear Generating Station Riverside Public Utilities P.O. Box 128 2911 Adams Street San Clemente, CA 92674-0128 Riverside, CA 92504 Robert B. Scholler Eileen M. Teichert, Esq.

Southern California Edison Company Supervising Deputy City Attorney San Onofre Nuclear Generating Station City of Riverside P.O. Box 128 3900 Main Street San Clemente, CA 92674-0128 Riverside, CA 92522 Walker A Matthews III, Esq. David Spath, Chief Southern California Edison Company Division of Drinking Water and 2244 Walnut Grove Avenue Environmental Management Rosemead, CA 91770 California Department of Health Services P.O. Box 942732 Esther K. Park, Esq. Sacramento, CA 94234-7320 Southern California Edison Company 2244 Walnut Grove Avenue Ed Bailey, Chief Rosemead, CA 91770 Radiologic Health Branch State Department of Health Services Mayor, City of San Clemente P.O. Box 997414 (MS 7610) 100 Avenida Presidio Sacramento, CA 95899-7414 San Clemente, CA 92672 James D. Boyd, Commissioner Chairman, Board of Supervisors California Energy Commission County of San Diego 1516 Ninth Street (MS 34) 1600 Pacific Highway, Room 335 Sacramento, CA 95814 San Diego, CA 92101

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) UNIT 1 The requests for additional information (RAIs) provided are in response to the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1. On March 27, 2013, Southern California Edison and San Diego Gas & Electric submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for SONGS Unit 1, as required under Title 10 of the Code of Federal Regulations (10 CFR)

Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI # 1: Decommissioning Costs In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Per 10 CFR 50.82(a)(8)(v):

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

Accordingly, please provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

RAI # 2: Managing Irradiated Fuel In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.

Per 10 CFR 50.82 (a)(8)(v)-(vii):

The licensee must annually submit to the NRC, by March 31, a report on the status of its funding for managing irradiated fuel. The report must include the following information, current through the end of the previous calendar year: The amount of funds accumulated to cover the cost of managing the irradiated fuel; the projected cost of managing irradiated fuel until title to the fuel and possession of the fuel is transferred to the Secretary of Energy; and if the funds accumulated do not cover the projected cost, a plan to obtain additional funds to cover the cost.

Accordingly, please provide the total amount of dollars accumulated at the end of the appropriate year designated for managing irradiated fuel.

Enclosure

RAI #3: Decommissioning Costs In its March 27, 2013, letter, Southern California Edison and San Diego Gas & Electric did not provide the total amount of dollars spent on decommissioning over the previous calendar year.

Per 10 CFR 50.82(a)(8)(v):

the licensee must annually submit to the NRC, by March 31, a financial assurance status report. The report must include the following information, current through the end of the previous calendar year: The amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon.

Accordingly, please provide the total amount of dollars spent on decommissioning over the previous calendar year.