L-17-297, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FE NOCŽ RrstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B. Bezilla Vice President, Nuclear -SAFEGUARDS INFORMATION  
{{#Wiki_filter:FENOC'                                                                                            5501 North State Route 2 Oak Harbor. Ohio 43449 RrstEnergy Nuclear Operating Company Mark B. Bezilla                                                                                             419-321-7676 Vice President, Nuclear
-WHEN.SEPARATED FROM ENCLOSURE, HANDLE THIS -DOCUMENT AS DECONTROLLED October 30, 2017 L-17-297 ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001  
                                            - SAFEGUARDS INFORMATION
                          -   WHEN.SEPARATED FROM ENCLOSURE, HANDLE THIS                       -
DOCUMENT AS DECONTROLLED October 30, 2017 10 CFR 50.4 L-17-297                                                                 10 CFR _50.54(p)
ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001


==SUBJECT:==
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 10 CFR 50.4 10 CFR _50.54(p)
 
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) .
: 21) . 419-321-7676 The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure).
The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is b~ing submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan.
The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is submitted in accordance with provisions of 10 CFR 50.54(p)(2).
The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.
A report of the changes made is included with the revised plan. The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.  
                          '                         . .
' . . There are no regulatory commitments contained in this letter. If there are any questions . . or if additional information is required, please contact Mr. W. Lee Willis, Manager; Site Protection, at (419) 321-7253.
There are no regulatory commitments contained . in. this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager; Site Protection, at (419) 321-7253.
Sincerely, . * . /I _l/l . '/2 *it ii l1 t/lli Iv !)Al Mark B. Bezilla / SAFEGUARDS INFORMATION  
Sincerely, .     *     . /I _l/l
-WHEN SEPARATED FROM ENCLOSURE,*HANDLE THIS -DOCUMENT AS DECdNTROLLED SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2  
          . '/2       *it ii         l1 t/lliIv !)Al Mark B. Bezilla       /
SAFEGUARDS INFORMATION
                        -     WHEN SEPARATED FROM ENCLOSURE,*HANDLE THIS                       -
DOCUMENT AS DECdNTROLLED
 
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2


==Enclosure:==
==Enclosure:==


Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) cc:   NRG Region Ill Administrator DB-1 NRG Resident Inspector (w/o Enclosures)
: 21) cc: NRG Region Ill Administrator DB-1 NRG Resident Inspector (w/o Enclosures)
DB-1 NRR Project Manager (w/o Enclosures)
DB-1 NRR Project Manager (w/o Enclosures)
Utility Radiological Safety Board-(w/o Enclosures)
Utility Radiological Safety Board- (w/o Enclosures)
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -DOCUMENT AS DECONTROLLED SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS                 -
: 21) SAFEGUARDS INFORMATION . WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -DOCUMENT AS DECONTROLLED}}
DOCUMENT AS DECONTROLLED
 
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS       -
DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21)
SAFEGUARDS INFORMATION
. WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS     -
DOCUMENT AS DECONTROLLED}}

Revision as of 09:15, 29 October 2019

Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21)
ML17306A075
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/2017
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-17-297
Download: ML17306A075 (3)


Text

FENOC' 5501 North State Route 2 Oak Harbor. Ohio 43449 RrstEnergy Nuclear Operating Company Mark B. Bezilla 419-321-7676 Vice President, Nuclear

- SAFEGUARDS INFORMATION

- WHEN.SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED October 30, 2017 10 CFR 50.4 L-17-297 10 CFR _50.54(p)

ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) .

The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is b~ing submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan.

The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.

' . .

There are no regulatory commitments contained . in. this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager; Site Protection, at (419) 321-7253.

Sincerely, . * . /I _l/l

. '/2 *it ii l1 t/lliIv !)Al Mark B. Bezilla /

SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ENCLOSURE,*HANDLE THIS -

DOCUMENT AS DECdNTROLLED

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2

Enclosure:

Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) cc: NRG Region Ill Administrator DB-1 NRG Resident Inspector (w/o Enclosures)

DB-1 NRR Project Manager (w/o Enclosures)

Utility Radiological Safety Board- (w/o Enclosures)

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21)

SAFEGUARDS INFORMATION

. WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED