{{#Wiki_filter:}} | {{#Wiki_filter:hFCn)gfM 195 U.S. NUCLL'AR REGULATORY CC "IISSIO UMBER I2.70I ~ | ||
~ | |||
50-250 51/335 y~ | |||
FILE NUMBER NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL MONTHLY REPORT DATE OF DOCUMENT | |||
'LORIDA POWER 6('IGHT CO MIAMI, FLA 8-5-76 A D SCHMIDT DATE RECEIVED 8-13-76 LETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED gCI ORIGINAL | |||
@UN C LASS I F I E D 1 SIGNED | |||
'ONTHLY COPY DESCRIPTION I LETTER TRANS THE FOLLOWING: REPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY & | |||
AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~ | |||
NOTE: ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976.. | |||
PLANT NAME: ST LUCIE gl ACKNOVVLEBGE> | |||
TUlUQEY POINTS'03 & 54, gO NOT REMOVE FOR ACTION/INFO RMATION HXPC | |||
<r CYS FOR AC ON INTERNAL D IST Rl BUTION F&2JX N | |||
BRANCH CHIEF L EXTERNAL DISTRIBUTION CONTROL NUMBER | |||
\ ~~ ~~ | |||
Nnc roRM ioo Iwo) | |||
0 | |||
'Regoiatory Docket Fill'LORIDA POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen: nn Oy> | |||
Attached are the July, 1976 Operating Status Reports,. ' | |||
Turkey Point Unit Nos. 3 and 4 and St. Lucie U . 1. | |||
St. Lucie Unit No. 1 was previously reported to be in commercial operation, in error. We are attaching the corrected June, 1976 Operating Status Report for St. Lucie Unit No. l. | |||
We regret any inconvenience caused by this error. | |||
Very truly yours, t5t gpt,p~g(0 D.~ Sc midt | |||
~ | |||
P-(T-)~ | |||
Vice President ~~gg e}au}A10A, p)gMIss}ctH Power Resources gag foe}14JL VTC/pm Attachments ' }} | |||
cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA | |||
r N | |||
11 r | |||
II I | |||
II f | |||
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No. 3 DM'E Au . 5 1976 COMPLETED BY V. T. Chilson TELEPEONE (305) 552 - 3830 Non'8 Jul 1'976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 636 17 18 | |||
'43 (HWe-Net) 642 3 19 639 655 20 641 651 21 639 649 22 640 23 652 24 637 650 25 638 10 654 26 634 652 27 640 12 646 28 637 13 .644 29 636 14 644 30 632 15 639 31 632 16 641 NOTE: Daily average power level greater than 666 i%He due to cooler condenser cooling water. | |||
APPENDIX C | |||
~ "OPERATING DATA REPORT | |||
-JN)CKET NO., 50 - 250 | |||
..UNIT Turkey Point Unit No. 3 3)ATE Au . 5 1976 REPORT MONTH Jul 1976 | |||
.",COMPLETED BY V. T- Chilson OPERATING STATUS', | |||
REPORTING PERIODS)001 76,07 01 GROSS'HOURS IN REPORTING PERIODs 744.0 2400 76 07 31 26 THROUGH CURPiENTf ~02(IXr.~ ONER LEVc.L ((tfr1t): 2200 MAX. DEPEND. CAPACITY (A."Ne-Net): | |||
3~ PONER LEVEL TO WHICH RESTRICTED (ZF AVY) (M1(e-Net): NONE 4~ REASONS FOR RESTRICTION (ZF ANY): | |||
THIS MiQVTH YEAR TO DATE CUMULA¹'DE 5 N(LVBER OF HOURS REACTOR NAS CRZTXCAL ~ ~ 744-0 4 509.9 25 790.0 6~ REACTOR RESERVE SHUTDOAN HOURS ~ ~ ~ ~ ~ ~ ~ 64.2 7 HOURS GE"1ERATOR ON LINE. 744.0 4 437.6'4 807.6 8 ~ UNIT RESERVE SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 85.0 9D GROSS THER1(AL ENERGY GENERATED (Ã0() .....1 629 884 9 580 710 46 892 970 503 700 3 045 360 15''060 596 10, GROSS ELECTRICAL ENERGY GE:. RA -D (N'rTH) ~ . | |||
: 11. NET ELECTRICAL EVERGY GENERATED (MAH) ....'78 780 2 890 825 14'46 587 12 REACTOR SERVICE FACTOR. 100.0 88.2 ': 80.4 13D REACTOR AVAILABILITYFACTOR. ~ ~ ........ '00. 0 89.5 80. 6 14 ~ UNIT SERVICE FACTOR. 100.0 86.8 77.4 | |||
: 15. UNIT AVAILABILITYFACTOR.... ~ ............ 100.0 86.8 M2~ | |||
: 16. UNIT CAPACITY FACTOR (Using MDC)......... 96:6 84.9 67 7 | |||
: 17. UNIT CAPACITY FACTOR (Using Design MNe) .. ~ 92 ~ 9 81.6 64.1 18 'NIT FORCED OUTAGE RATE. ~ | |||
0.2 7 | |||
19 ~ SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES DAT, AND DURATION OF EACH): | |||
Refueling, maintenance, and inspections - Oc'tober 4 through November 14, 1076 ED, ZP SSIITDOIOI AT Ei'D OF REPORZ P RZODESTZAA,TED DATE OF STARTIIP: | |||
21 ~ UNZTS IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION): FORECAST ACHIEVED ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION | |||
APPENDIX D DOCKET NO. | |||
(I) REASON UNIT SHUTDOWNS AND POWER REDUCiIONS UNIT NAME Turkey Point Unit No. 3 e 3 A: EQUIPMENT FAILURE (EXPLAIN) | |||
Bd MAINT. OR TEST ~ DATE Au ust 5 1976 C: rzrUELINC D: REGULATORY RESTRICTION ~ COMPLETED BY V.T. Chilson E: OPERATOR TRAIHING AND LICENSE EXAIIINATION TFLEPHONE 305 552 - 3830 Fd ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) | |||
Hd OTHER (EXPLAIN). | |||
(2) METHOD METHOD OF I d MANUAL TYPE Fd FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM NO. Sg SCHEDULED (HOURS) REASON (ll REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 43 OTHER (EXPLAIN) | |||
NONE Ropmaarc 'Unit No. 3 operated at approximately 100 R R.p. dnripg month. | |||
~ l, | |||
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL | |||
,DocxET No. 50 251 | |||
.UNIT Turke Point Unit No. 4 DATE Au . 5 1976 COMPLETED BY V T. Chilson TELEPH0NE 305 552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 666 17 662 2 666 18 661 6 7 60 20 662 21 22 658 669 23 661 671 24 654 25 656 10 26 466 670 27 659 12 659 28 657 13 29 653 14 656 30 652 15 31 628 16 663 NOTE: Daily average power level greater than 666HWe due to cooler condense" cooling water. | |||
APPENDIX C | |||
~ OPERATING DATA REPORT DOCKET NO. 50 251 UNIT Turke Point Unit o. 4 | |||
.'DATEAug. 5 1976 REPORT MONTH Jul 1976 COt(PLETED BY V. T. Chilson | |||
~,'I 4 | |||
OPERATINC STATUS', | |||
Rl!PORTIHG PERZOD:0001,76 07 01 GRDSS HOUIIS Zll IIEPOEZZHG PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt) t 2200 3, POWER LEVEL TO NHICH RESTRZCTED (IF ANY) (M'rfe-Net}: NO E 4~ REASONS FOR RESTRICTZOAV (ZF ANY) 2 THIS MONTH YEAR TO DATE CUttULiTIVE 4 | |||
5 NUMBER OF HOURS REACTOR NAS CRITICAL.. ~ . ~ 741.3 3 627.4 ~/~4 6 i!EAOTOR IIESA'RPE SDZITDOAE HOUIIS.......... -0 7 HOURS GENERATOR ON LINE.... . . . ~ .. . 738.4 3 456.6'8 I'70.2 Si UNIT RESERVE SHUTDO'Nit HOURS . . . . P, GROSS THEUIAD 'ENERGY GEIIERATED I..IO!7..... 1~61 4 2 7 303 040 37 953 676 10* GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H) . ~ 511 520 2 345 221 12 324 298 11 ~ NET ELECTRICAL ENERGY CEttERATED (&S&) ~ ~ ~ ~ 487 16I 2 223 446 12 ~ REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~..... ~ 99. 6 71. 0 74.8 13G REACTOR AVAILABILITYFACTOR.. ~ .. ~ .4 99 ~ 6 71.0 75.2 14 ~ UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ . 99.2 67.6 70.5 | |||
...4 | |||
~ ~ ~ ~ | |||
15 ~ UNIT AVAILABILITYFACTOR. ~ ~ ~ 99.2 67.6 70.5 16 ~ UNIT CAPACITY FACTOR (Using MDC) ...., .~ 98.3 65.3 68.9 | |||
: 17. UNZT CAPACITY FAC OR (Using Design MNe) .. ~ 94.5 62.8 65.4 18 'NIT FORCED OUTACE RAT ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 8 5.6 3.4) 19G SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}: | |||
NONE 2D. 17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP: | |||
210 UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt): FORECAST ACHI VED INITIAL CRITICALITY INITIAL ELECTRICITY COMt(ERCZAL OPERATION | |||
APPENDIX D DOCKET NO fil) REASON UNIT SHUTDOWNS AND PolKR REDUCTIONS UNIT NAME Turke Point Unit No. 4 As EQUIPMENT FAILURE (EXPLAIN) | |||
Bs= MAINT. OR TEST 4 ~ DATE u us 5 976 Cs REFUELING Ds PZGULATORY RESTRICTION CQMPrsmD BY v. T. chilson Es OPERATOR TRAINING AND LICENSFa EXAMINATION TELEPHONE 552 - 3830 . | |||
F6 ADMINISTRATIVE REPORT MDNTH JulY 1976 Gs OPERATIONAL ERROR (EXPI AIN) | |||
Hs OTHER (EXPLAIN) i (2) METHOD METHOD OF I s MANUAL TYPE Fs FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM NO. DATE Ss SCHEDULED (HOURS) REASON (I) REDVCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 4s OTHER (EXPLAIN) l 15 76-07-2 5.6 Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No. 77A when the pump low auction pressure trip actuated. | |||
Corrective action included testing and recalibrating the low suction pressure trip. (Non-nuclear System) | |||
Unit Ro. 4 operated at approximately 100 4 R.P. during month exceph for outage of July 26, 1976. | |||
et i | |||
APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO 50 - 335 UNIT St. Lucie Unit No. 1 DATE Au . 5 19'76 COHPLETED BY V. T. Chilson | |||
~ TELEPHONE (305) 552 3830 NONTH July'1976 DAY AVERAGE DAIIY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (NWe-Net) 58 17 2 75 18 3 561 19 4 | |||
' 563 20 566 21 531 22 23 334 24 10 94 26 27 12 28 13 29 14 30 31 16 | |||
P&7NYENHNMI 75 NL~NNN APPENDIX C | |||
~ OPERATZNC DATA REPORT DOCKET NO, 50 335 UNIT S REPORT MONTH Jul 1976 COMPLETED BY V. T Chilson | |||
'f OPERATING STATUS'- | |||
1 MAX. DEPEND. CAPACITY (Mde-Net) 5 timated) 3~ POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722 | |||
\ | |||
4 REASONS FOR RESTRICTION {ZF ANY): | |||
HOURS' "Temporary 90I restriction pending reactor coolant floe analysis" THIS MONTH YEAR TO DATE CUMULAT'VS 59 N(IFQ)ER OF HOURS REACTOR WAS CRITICAL.... 360.1 ' 1 366.6 1 366.6 | |||
~ REACTOR RESERVE SHUTDOWN ... ~ ~ ~ ~ ~ N/A (1) N/A Nfl4 7 HOURS G IIE(IATOR OM Z,ZNE.......,,....., 159.5 1 121.9 1 121.9 8~ UNIT RESERVE SHUTDOWN HOURS.... ~ ~ ~ ~ . ~ ~ ~ ~ ~ N/A (1) N/A (1). N/A (1) 9, CRONE TEENIAL EIIERGY G HE(IATEO (.. "I) ...... ZOE 0( '4((5() ~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~ . 89 830 418 670 418 670 | |||
: 11. NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~ ~ ~ ~ 52296 ~49 | |||
~ | |||
12 'EACTOR SERVICE FACTOP. ~ . ~ ~ 9' ~ 9 ~ ~ ~ . ~ ~ ~ ~ | |||
'48 ' 66.1 66.1 | |||
'13 ~ REACTOR AVAILABILITYFACTOR. ~ ~ ~ .4..4. 4.'8.4 '6.1 66.1 | |||
'NIT SERVICE FACTOR. .. .. | |||
~ | |||
14 . . ~ ~ 9. . .". 25.5 54.9 54.9 15, ill(ZT AYAZLAEZLZTYFACTOR .....,.....,...., 54 9 | |||
: 16. UNIT CAPACITY FACTOR (Using MDC)......... 13;8 22.8 22.8 | |||
: 17. UNIT CAPACI " FACTOR (Using Design MWc) .. ~ 13.8 22.8 22.8 | |||
: 15. (ft(IT FORCEO OUTAGE RATE,........ ~ ~ ~ ~ ~ ~ ~ ~ ~7 ~ | |||
~((.9 19 ~ SHUTDOWNS SCHEDULED OVER NET 6 MOANTHS {TYPEF DATEF AND DURATION OF EACH): | |||
N/A( ) | |||
20 'F SHUTD(XIlN AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP: | |||
219 UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION): FORECAST A HIEVE INITIAL CRITICALITY 1 ~AYI 2, 1976 INITIAL ELECTRICITY M~976 | |||
~ COMA(ERCZAL OPERATION NOTE: (1) Unit in test status | |||
APPENDIX D DOCKET NO. 50 - 335 | |||
',1) REASON l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit No. 1 Af EQUIPMENT FAILURE {EXPLAIN) ~ | |||
By MAINT. OR TEST ~ DATE August 5, 1976 Cy PXPUELING Dz PZGULATORY RESTRICTION COMPLETED. BY V T Chilson E: OPEPATOR TRAINING AND LICE:hSE EXAMINATION TELEPHONE (305) 552 3830 Ff ADMINISTRATIVE REPORT MONTH JulY 1976 G: OPERATIONAL ERROR (EXPLAIN) | |||
H: OTHER (EXPLAIN) | |||
{2) METHOD METHOD OF 1: MM{UAL TYPE SHUTTING DOWN 2 s MANUAL SCRAM FI FORCED DURATION THE REACTOR OR 3: AUTOMATIC SCRAM, NO. DATE Sf SCHEDULED (HOURS) REASON (1) REDUCING POWER{2) CORRECTIVE ACTIONS COMMENTS 4: OTHER {EXPLAIN) | |||
Unit was removed from service to repair leak in the 12 76-07-0 29.2 generator hydrogen system. (Non-nuclear System) 13 76-07-0 3.8 3 Reactor was tripped by steam generator level trip during 9': | |||
return of unit to power operation after outage. | |||
(Non-nuclear System) 14 76-07-0 5.0 Unit was removed from service to investigate and correct problem with turbine control system. (Non-nuclear System) 15 76-07<6 B N/A Load reduction to clean condensate pump suction strainer. | |||
(Non-nuclear System) 16 76-07-1 516. 3 F Unit was.removed .from servic~ for reactor tests and inspection. (Nuclear System) sullllhnrhi Ut Lucia Unit No. 1 power Ascension Test program continued until July 10,. 1996 when the ~ft was removed from service for reactor tests and inspection. | |||
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 50 335 DNIT St. Lucie Unit No. 1 DATE Au . 5 1976 COHPLETED BY VS T. Chilson TELEPH0NE 305 552 - 3830 Noma June 1976 (Corrected) | |||
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWo-Not) (MWo-Not) 327 17 18 32 19 | |||
. 330 20 21 462 22 458 149 23 330 316 318 25 10 319 26 526 322 '27 322 12 22 28 410 13 29 541 14 30 546 15 16 NOTE Corrected - Unit No. '1 was previously reported to be in commercial operation, in error. The unit remained in test status. | |||
APPFNDZX C OPERATING DATA REPORT DOCKET NO. 50 - 335 | |||
=UNIT St. Lucie Unit No. 1 DATE Aug. 5, 1976 REPORT MONTH June 1976 . Corrected) COMPLETED BY V. T. Chilson 4 | |||
TELEPHONE 305 552-4 ~ | |||
OPERATING STATUS'-'e REPORTZNG PERIOD: 000 GROSS HOURS 20 REPORTZH PEIIZOD: 720.0 THROUGH 2400 76 0 2, CURRENTLY AUTHORIZED POWER LEVEL (MWt) t 2560 MAX. DEPEND. CAPAC TY (MWe-Net): stimated) | |||
DEszcN EI 0 REUAL RATANG IIUle Nee- | |||
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722 | |||
: 4. REASONS FOR RESTRICTION (ZF ANY) a restriction pending reactor coolant flow analysis" | |||
'4 "Temporary 90X THIS MONTH )EAR TO DATE CUMULATYV ( | |||
5, N(L2(BER OF HOURS REACTOR WAS CRITICAL .. 524.1 1.006.5 1 006.5 6 IIEACTOR IIESERUE SHNZDDAN HOllltS.....,...., ~NA 7, HOURS GENEIIATOR ON LZHE.. ~ ~ ~ ~ ~ ~ ~ ~ "~ . ~26.6 | |||
~ ~02.4 8~ UNIT RESERVE SHUTDOWN HOURS. .. ~ ~ ~ ~ ~ ~ ~ N/A(3) N/A(3). N/A (3) 9~ GROSS" THER(AL ENERGY GENERATED (Ã&).. ~.... 750 137 4 1 187 069' 187 069 100 GROSS ELECTRICAL ENERGY GEANERAT-D (M'8H) ~ ~ 211 690 328 840 328 840 lie NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~ .'89 436 291 784 291 784 12 REACTOR SERVICE FACTOR. | |||
13 'EACTOR AVAILABILZTYFACAOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ | |||
'2 72.8 71.8 8 | |||
76-2 76.2 71.8 | |||
~6 71.8 14 ~ UNIT SERVICF FACTOR 15 'NIT AVAILABILITYFACTOR. ~ .. ~ ~ ~ ~ ~ . .~ 71.8 71.8 7+8 | |||
: 16. UNZT CAPACITY FACTOR (Using MDC)......... 32:8 28.0 28.0 | |||
: 17. UNIT CAPACITY FACTOR (Using Design MWe) .. ~ 32.8 28.0 28.0 18 'NIT FORCED OUTAGE RATE.P .. ~ ....... ~ ~ 4.2 . 14.6 4 | |||
14.6 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E)2CH): | |||
N/A 20 ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD ESTZNli,ZED DATE OP 'STARTUP: | |||
21 UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION): FORECAST A HI VE INITZAL CRITICALITY April 22, 1976 IiVITZALELECTRICITY | |||
~ COME(ERCIAL OPERATION NOTE: (1) Corrected St. Lucie Unit No. 1 was previously reported to be in .commercial operation, in error. The unit remained in test- status. | |||
(2) Revised values, beginning with initial power generation-to-date. | |||
(3) Unit'n test status. | |||
AP1'L'ND1X u DOCKLT HO. 50 335 s | |||
(1) REASON UNIT SHUTDOWNS AND POWER REDUCAIONS "'NIT NAME St. Lucie Unit No. 1 A: EQUIPMENT FAILURE (EXPLAIN) l Bg MAINT. OR TEST ~ DATE August 5, 1976 Cs MFUELING DT REGULATORY ASTRICTION coMPLETED. BY V. T. Chilson Et OPERATOR TRAINING AND LICENSE EXAMINATION TELEPHONE (305) - 552 - 3830 F: ADMINISTRATIVE REPORT MONTH June 1976 (Corrected) | |||
Gg OPERATIONAL ERROR (EXPLAIN) | |||
Hs OTHER (EXPLAIN) | |||
(2) METHOD METHOD OF 11 MAHUAL TYPE SHUTTING DOWN 21 MANUAL SCRAM l Ft FORCED DURATION THE REACTOR OR 3 s AUTOMATIC SCRAM NO. DATE ST SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COMENTS 4g OTHER (EXPLAIN) ) | |||
08 76-06-07 10.1 Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System) 09 76-06-1 S, 180.5 B 3 Performing test, generator trip with shutdown outside control room. (Nuclear System) | |||
Outage continued for maintenance. (Nuclear and Non-nuclear Systems) 10 76-06-2 12.8 Reactor was,tripped during transient condition caused by closure- of a HSIV when power supply to a vi'tal instrument bus was lost. (Nuclear System) 11 76-06-2 B N/A Load reduction to clean condensate pump suction strainer. | |||
(Hon-nuclear System) smemsrc R: St. Annie Unit No. 1 Power Ascension Test Program continued.. | |||
NOTE: Corrected -. St. Lucie Unit No. 1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status. | |||
e~ | |||
~ ~ | |||
Z ,4 | |||
~, ~}} | |||
Revision as of 11:52, 28 October 2019
| ML18227B087 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 08/05/1976 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B087 (20) | |
Text
hFCn)gfM 195 U.S. NUCLL'AR REGULATORY CC "IISSIO UMBER I2.70I ~
~
50-250 51/335 y~
FILE NUMBER NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL MONTHLY REPORT DATE OF DOCUMENT
'LORIDA POWER 6('IGHT CO MIAMI, FLA 8-5-76 A D SCHMIDT DATE RECEIVED 8-13-76 LETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED gCI ORIGINAL
@UN C LASS I F I E D 1 SIGNED
'ONTHLY COPY DESCRIPTION I LETTER TRANS THE FOLLOWING: REPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~
NOTE: ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976..
PLANT NAME: ST LUCIE gl ACKNOVVLEBGE>
TUlUQEY POINTS'03 & 54, gO NOT REMOVE FOR ACTION/INFO RMATION HXPC
<r CYS FOR AC ON INTERNAL D IST Rl BUTION F&2JX N
BRANCH CHIEF L EXTERNAL DISTRIBUTION CONTROL NUMBER
\ ~~ ~~
Nnc roRM ioo Iwo)
0
'Regoiatory Docket Fill'LORIDA POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen: nn Oy>
Attached are the July, 1976 Operating Status Reports,. '
Turkey Point Unit Nos. 3 and 4 and St. Lucie U . 1.
St. Lucie Unit No. 1 was previously reported to be in commercial operation, in error. We are attaching the corrected June, 1976 Operating Status Report for St. Lucie Unit No. l.
We regret any inconvenience caused by this error.
Very truly yours, t5t gpt,p~g(0 D.~ Sc midt
~
P-(T-)~
Vice President ~~gg e}au}A10A, p)gMIss}ctH Power Resources gag foe}14JL VTC/pm Attachments ' cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA
r N 11 r II I II f
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No. 3 DM'E Au . 5 1976 COMPLETED BY V. T. Chilson TELEPEONE (305) 552 - 3830 Non'8 Jul 1'976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 636 17 18
'43 (HWe-Net) 642 3 19 639 655 20 641 651 21 639 649 22 640 23 652 24 637 650 25 638 10 654 26 634 652 27 640 12 646 28 637 13 .644 29 636 14 644 30 632 15 639 31 632 16 641 NOTE: Daily average power level greater than 666 i%He due to cooler condenser cooling water.
APPENDIX C
~ "OPERATING DATA REPORT
-JN)CKET NO., 50 - 250
..UNIT Turkey Point Unit No. 3 3)ATE Au . 5 1976 REPORT MONTH Jul 1976
.",COMPLETED BY V. T- Chilson OPERATING STATUS',
REPORTING PERIODS)001 76,07 01 GROSS'HOURS IN REPORTING PERIODs 744.0 2400 76 07 31 26 THROUGH CURPiENTf ~02(IXr.~ ONER LEVc.L ((tfr1t): 2200 MAX. DEPEND. CAPACITY (A."Ne-Net): 3~ PONER LEVEL TO WHICH RESTRICTED (ZF AVY) (M1(e-Net): NONE 4~ REASONS FOR RESTRICTION (ZF ANY): THIS MiQVTH YEAR TO DATE CUMULA¹'DE 5 N(LVBER OF HOURS REACTOR NAS CRZTXCAL ~ ~ 744-0 4 509.9 25 790.0 6~ REACTOR RESERVE SHUTDOAN HOURS ~ ~ ~ ~ ~ ~ ~ 64.2 7 HOURS GE"1ERATOR ON LINE. 744.0 4 437.6'4 807.6 8 ~ UNIT RESERVE SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 85.0 9D GROSS THER1(AL ENERGY GENERATED (Ã0() .....1 629 884 9 580 710 46 892 970 503 700 3 045 360 15060 596 10, GROSS ELECTRICAL ENERGY GE:. RA -D (N'rTH) ~ .
- 11. NET ELECTRICAL EVERGY GENERATED (MAH) ....'78 780 2 890 825 14'46 587 12 REACTOR SERVICE FACTOR. 100.0 88.2 ': 80.4 13D REACTOR AVAILABILITYFACTOR. ~ ~ ........ '00. 0 89.5 80. 6 14 ~ UNIT SERVICE FACTOR. 100.0 86.8 77.4
- 15. UNIT AVAILABILITYFACTOR.... ~ ............ 100.0 86.8 M2~
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 96:6 84.9 67 7
- 17. UNIT CAPACITY FACTOR (Using Design MNe) .. ~ 92 ~ 9 81.6 64.1 18 'NIT FORCED OUTAGE RATE. ~
0.2 7 19 ~ SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES DAT, AND DURATION OF EACH): Refueling, maintenance, and inspections - Oc'tober 4 through November 14, 1076 ED, ZP SSIITDOIOI AT Ei'D OF REPORZ P RZODESTZAA,TED DATE OF STARTIIP: 21 ~ UNZTS IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION): FORECAST ACHIEVED ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION
APPENDIX D DOCKET NO. (I) REASON UNIT SHUTDOWNS AND POWER REDUCiIONS UNIT NAME Turkey Point Unit No. 3 e 3 A: EQUIPMENT FAILURE (EXPLAIN) Bd MAINT. OR TEST ~ DATE Au ust 5 1976 C: rzrUELINC D: REGULATORY RESTRICTION ~ COMPLETED BY V.T. Chilson E: OPERATOR TRAIHING AND LICENSE EXAIIINATION TFLEPHONE 305 552 - 3830 Fd ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) Hd OTHER (EXPLAIN). (2) METHOD METHOD OF I d MANUAL TYPE Fd FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM NO. Sg SCHEDULED (HOURS) REASON (ll REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 43 OTHER (EXPLAIN) NONE Ropmaarc 'Unit No. 3 operated at approximately 100 R R.p. dnripg month.
~ l,
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
,DocxET No. 50 251
.UNIT Turke Point Unit No. 4 DATE Au . 5 1976 COMPLETED BY V T. Chilson TELEPH0NE 305 552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 666 17 662 2 666 18 661 6 7 60 20 662 21 22 658 669 23 661 671 24 654 25 656 10 26 466 670 27 659 12 659 28 657 13 29 653 14 656 30 652 15 31 628 16 663 NOTE: Daily average power level greater than 666HWe due to cooler condense" cooling water.
APPENDIX C
~ OPERATING DATA REPORT DOCKET NO. 50 251 UNIT Turke Point Unit o. 4
.'DATEAug. 5 1976 REPORT MONTH Jul 1976 COt(PLETED BY V. T. Chilson
~,'I 4
OPERATINC STATUS', Rl!PORTIHG PERZOD:0001,76 07 01 GRDSS HOUIIS Zll IIEPOEZZHG PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt) t 2200 3, POWER LEVEL TO NHICH RESTRZCTED (IF ANY) (M'rfe-Net}: NO E 4~ REASONS FOR RESTRICTZOAV (ZF ANY) 2 THIS MONTH YEAR TO DATE CUttULiTIVE 4 5 NUMBER OF HOURS REACTOR NAS CRITICAL.. ~ . ~ 741.3 3 627.4 ~/~4 6 i!EAOTOR IIESA'RPE SDZITDOAE HOUIIS.......... -0 7 HOURS GENERATOR ON LINE.... . . . ~ .. . 738.4 3 456.6'8 I'70.2 Si UNIT RESERVE SHUTDO'Nit HOURS . . . . P, GROSS THEUIAD 'ENERGY GEIIERATED I..IO!7..... 1~61 4 2 7 303 040 37 953 676 10* GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H) . ~ 511 520 2 345 221 12 324 298 11 ~ NET ELECTRICAL ENERGY CEttERATED (&S&) ~ ~ ~ ~ 487 16I 2 223 446 12 ~ REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~..... ~ 99. 6 71. 0 74.8 13G REACTOR AVAILABILITYFACTOR.. ~ .. ~ .4 99 ~ 6 71.0 75.2 14 ~ UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ . 99.2 67.6 70.5
...4
~ ~ ~ ~
15 ~ UNIT AVAILABILITYFACTOR. ~ ~ ~ 99.2 67.6 70.5 16 ~ UNIT CAPACITY FACTOR (Using MDC) ...., .~ 98.3 65.3 68.9
- 17. UNZT CAPACITY FAC OR (Using Design MNe) .. ~ 94.5 62.8 65.4 18 'NIT FORCED OUTACE RAT ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 8 5.6 3.4) 19G SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}:
NONE 2D. 17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP: 210 UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt): FORECAST ACHI VED INITIAL CRITICALITY INITIAL ELECTRICITY COMt(ERCZAL OPERATION
APPENDIX D DOCKET NO fil) REASON UNIT SHUTDOWNS AND PolKR REDUCTIONS UNIT NAME Turke Point Unit No. 4 As EQUIPMENT FAILURE (EXPLAIN) Bs= MAINT. OR TEST 4 ~ DATE u us 5 976 Cs REFUELING Ds PZGULATORY RESTRICTION CQMPrsmD BY v. T. chilson Es OPERATOR TRAINING AND LICENSFa EXAMINATION TELEPHONE 552 - 3830 . F6 ADMINISTRATIVE REPORT MDNTH JulY 1976 Gs OPERATIONAL ERROR (EXPI AIN) Hs OTHER (EXPLAIN) i (2) METHOD METHOD OF I s MANUAL TYPE Fs FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM NO. DATE Ss SCHEDULED (HOURS) REASON (I) REDVCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 4s OTHER (EXPLAIN) l 15 76-07-2 5.6 Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No. 77A when the pump low auction pressure trip actuated. Corrective action included testing and recalibrating the low suction pressure trip. (Non-nuclear System) Unit Ro. 4 operated at approximately 100 4 R.P. during month exceph for outage of July 26, 1976. et i
APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO 50 - 335 UNIT St. Lucie Unit No. 1 DATE Au . 5 19'76 COHPLETED BY V. T. Chilson
~ TELEPHONE (305) 552 3830 NONTH July'1976 DAY AVERAGE DAIIY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (NWe-Net) 58 17 2 75 18 3 561 19 4
' 563 20 566 21 531 22 23 334 24 10 94 26 27 12 28 13 29 14 30 31 16
P&7NYENHNMI 75 NL~NNN APPENDIX C
~ OPERATZNC DATA REPORT DOCKET NO, 50 335 UNIT S REPORT MONTH Jul 1976 COMPLETED BY V. T Chilson
'f OPERATING STATUS'-
1 MAX. DEPEND. CAPACITY (Mde-Net) 5 timated) 3~ POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
\
4 REASONS FOR RESTRICTION {ZF ANY): HOURS' "Temporary 90I restriction pending reactor coolant floe analysis" THIS MONTH YEAR TO DATE CUMULAT'VS 59 N(IFQ)ER OF HOURS REACTOR WAS CRITICAL.... 360.1 ' 1 366.6 1 366.6
~ REACTOR RESERVE SHUTDOWN ... ~ ~ ~ ~ ~ N/A (1) N/A Nfl4 7 HOURS G IIE(IATOR OM Z,ZNE.......,,....., 159.5 1 121.9 1 121.9 8~ UNIT RESERVE SHUTDOWN HOURS.... ~ ~ ~ ~ . ~ ~ ~ ~ ~ N/A (1) N/A (1). N/A (1) 9, CRONE TEENIAL EIIERGY G HE(IATEO (.. "I) ...... ZOE 0( '4((5() ~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~ . 89 830 418 670 418 670
- 11. NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~ ~ ~ ~ 52296 ~49
~
12 'EACTOR SERVICE FACTOP. ~ . ~ ~ 9' ~ 9 ~ ~ ~ . ~ ~ ~ ~
'48 ' 66.1 66.1
'13 ~ REACTOR AVAILABILITYFACTOR. ~ ~ ~ .4..4. 4.'8.4 '6.1 66.1
'NIT SERVICE FACTOR. .. ..
~
14 . . ~ ~ 9. . .". 25.5 54.9 54.9 15, ill(ZT AYAZLAEZLZTYFACTOR .....,.....,...., 54 9
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 13;8 22.8 22.8
- 17. UNIT CAPACI " FACTOR (Using Design MWc) .. ~ 13.8 22.8 22.8
- 15. (ft(IT FORCEO OUTAGE RATE,........ ~ ~ ~ ~ ~ ~ ~ ~ ~7 ~
~((.9 19 ~ SHUTDOWNS SCHEDULED OVER NET 6 MOANTHS {TYPEF DATEF AND DURATION OF EACH):
N/A( ) 20 'F SHUTD(XIlN AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP: 219 UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION): FORECAST A HIEVE INITIAL CRITICALITY 1 ~AYI 2, 1976 INITIAL ELECTRICITY M~976
~ COMA(ERCZAL OPERATION NOTE: (1) Unit in test status
APPENDIX D DOCKET NO. 50 - 335 ',1) REASON l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit No. 1 Af EQUIPMENT FAILURE {EXPLAIN) ~ By MAINT. OR TEST ~ DATE August 5, 1976 Cy PXPUELING Dz PZGULATORY RESTRICTION COMPLETED. BY V T Chilson E: OPEPATOR TRAINING AND LICE:hSE EXAMINATION TELEPHONE (305) 552 3830 Ff ADMINISTRATIVE REPORT MONTH JulY 1976 G: OPERATIONAL ERROR (EXPLAIN) H: OTHER (EXPLAIN) {2) METHOD METHOD OF 1: MM{UAL TYPE SHUTTING DOWN 2 s MANUAL SCRAM FI FORCED DURATION THE REACTOR OR 3: AUTOMATIC SCRAM, NO. DATE Sf SCHEDULED (HOURS) REASON (1) REDUCING POWER{2) CORRECTIVE ACTIONS COMMENTS 4: OTHER {EXPLAIN) Unit was removed from service to repair leak in the 12 76-07-0 29.2 generator hydrogen system. (Non-nuclear System) 13 76-07-0 3.8 3 Reactor was tripped by steam generator level trip during 9': return of unit to power operation after outage. (Non-nuclear System) 14 76-07-0 5.0 Unit was removed from service to investigate and correct problem with turbine control system. (Non-nuclear System) 15 76-07<6 B N/A Load reduction to clean condensate pump suction strainer. (Non-nuclear System) 16 76-07-1 516. 3 F Unit was.removed .from servic~ for reactor tests and inspection. (Nuclear System) sullllhnrhi Ut Lucia Unit No. 1 power Ascension Test program continued until July 10,. 1996 when the ~ft was removed from service for reactor tests and inspection.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 50 335 DNIT St. Lucie Unit No. 1 DATE Au . 5 1976 COHPLETED BY VS T. Chilson TELEPH0NE 305 552 - 3830 Noma June 1976 (Corrected) DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWo-Not) (MWo-Not) 327 17 18 32 19
. 330 20 21 462 22 458 149 23 330 316 318 25 10 319 26 526 322 '27 322 12 22 28 410 13 29 541 14 30 546 15 16 NOTE Corrected - Unit No. '1 was previously reported to be in commercial operation, in error. The unit remained in test status.
APPFNDZX C OPERATING DATA REPORT DOCKET NO. 50 - 335
=UNIT St. Lucie Unit No. 1 DATE Aug. 5, 1976 REPORT MONTH June 1976 . Corrected) COMPLETED BY V. T. Chilson 4
TELEPHONE 305 552-4 ~ OPERATING STATUS'-'e REPORTZNG PERIOD: 000 GROSS HOURS 20 REPORTZH PEIIZOD: 720.0 THROUGH 2400 76 0 2, CURRENTLY AUTHORIZED POWER LEVEL (MWt) t 2560 MAX. DEPEND. CAPAC TY (MWe-Net): stimated) DEszcN EI 0 REUAL RATANG IIUle Nee-
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
- 4. REASONS FOR RESTRICTION (ZF ANY) a restriction pending reactor coolant flow analysis"
'4 "Temporary 90X THIS MONTH )EAR TO DATE CUMULATYV (
5, N(L2(BER OF HOURS REACTOR WAS CRITICAL .. 524.1 1.006.5 1 006.5 6 IIEACTOR IIESERUE SHNZDDAN HOllltS.....,...., ~NA 7, HOURS GENEIIATOR ON LZHE.. ~ ~ ~ ~ ~ ~ ~ ~ "~ . ~26.6
~ ~02.4 8~ UNIT RESERVE SHUTDOWN HOURS. .. ~ ~ ~ ~ ~ ~ ~ N/A(3) N/A(3). N/A (3) 9~ GROSS" THER(AL ENERGY GENERATED (Ã&).. ~.... 750 137 4 1 187 069' 187 069 100 GROSS ELECTRICAL ENERGY GEANERAT-D (M'8H) ~ ~ 211 690 328 840 328 840 lie NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~ .'89 436 291 784 291 784 12 REACTOR SERVICE FACTOR.
13 'EACTOR AVAILABILZTYFACAOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'2 72.8 71.8 8
76-2 76.2 71.8
~6 71.8 14 ~ UNIT SERVICF FACTOR 15 'NIT AVAILABILITYFACTOR. ~ .. ~ ~ ~ ~ ~ . .~ 71.8 71.8 7+8
- 16. UNZT CAPACITY FACTOR (Using MDC)......... 32:8 28.0 28.0
- 17. UNIT CAPACITY FACTOR (Using Design MWe) .. ~ 32.8 28.0 28.0 18 'NIT FORCED OUTAGE RATE.P .. ~ ....... ~ ~ 4.2 . 14.6 4
14.6 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E)2CH): N/A 20 ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD ESTZNli,ZED DATE OP 'STARTUP: 21 UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION): FORECAST A HI VE INITZAL CRITICALITY April 22, 1976 IiVITZALELECTRICITY
~ COME(ERCIAL OPERATION NOTE: (1) Corrected St. Lucie Unit No. 1 was previously reported to be in .commercial operation, in error. The unit remained in test- status.
(2) Revised values, beginning with initial power generation-to-date. (3) Unit'n test status.
AP1'L'ND1X u DOCKLT HO. 50 335 s (1) REASON UNIT SHUTDOWNS AND POWER REDUCAIONS "'NIT NAME St. Lucie Unit No. 1 A: EQUIPMENT FAILURE (EXPLAIN) l Bg MAINT. OR TEST ~ DATE August 5, 1976 Cs MFUELING DT REGULATORY ASTRICTION coMPLETED. BY V. T. Chilson Et OPERATOR TRAINING AND LICENSE EXAMINATION TELEPHONE (305) - 552 - 3830 F: ADMINISTRATIVE REPORT MONTH June 1976 (Corrected) Gg OPERATIONAL ERROR (EXPLAIN) Hs OTHER (EXPLAIN) (2) METHOD METHOD OF 11 MAHUAL TYPE SHUTTING DOWN 21 MANUAL SCRAM l Ft FORCED DURATION THE REACTOR OR 3 s AUTOMATIC SCRAM NO. DATE ST SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COMENTS 4g OTHER (EXPLAIN) ) 08 76-06-07 10.1 Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System) 09 76-06-1 S, 180.5 B 3 Performing test, generator trip with shutdown outside control room. (Nuclear System) Outage continued for maintenance. (Nuclear and Non-nuclear Systems) 10 76-06-2 12.8 Reactor was,tripped during transient condition caused by closure- of a HSIV when power supply to a vi'tal instrument bus was lost. (Nuclear System) 11 76-06-2 B N/A Load reduction to clean condensate pump suction strainer. (Hon-nuclear System) smemsrc R: St. Annie Unit No. 1 Power Ascension Test Program continued.. NOTE: Corrected -. St. Lucie Unit No. 1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status. e~
~ ~
Z ,4 ~, ~}}