{{#Wiki_filter:y'PR10RXTY 1y (ACCELERATED RZDS PROCESSING)
{{#Wiki_filter:y'PR10RXTY                     1y (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9511150003 DOC.DATE: 95/10/31 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
ACCESSION NBR:9511150003         DOC.DATE: 95/10/31 NOTARIZED: NO               DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M               05000315 AUTH. NAME         AUTHOR AFFILIATION JANISSE,J.D.       Indiana Michigan Power       Co.   (formerly Indiana   6 Michigan Ele BLIND,A.A.         Indiana Michigan Power       Co.   (formerly Indiana   6 Michigan Ele RECIP.NAME         RECIPIENT AFFILIATION
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele BLIND,A.A.
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Oct 1995 for DC Cook Nuclear-Plant Unit 1.W/951106 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL 2 SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: h RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL:,LITCO BRYCE,J H NRC PDR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 HICKMAN,J 1 1 CENTER 0-1 1 RGN 1 1 NOAC 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RZDS" RECIPIENTS:
Monthly operating rept       for Oct 1995   for   DC Cook Nuclear-Plant Unit 1.W/951106     ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083)
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 0'I November 6, 1995 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
I ENCL    2  SIZE:
Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1995 is submitted.
NOTES:
Respectfully, A.A.Blind Plant Manager Attachment c NRC Region III D.RE Hahn R.C.Callen S.Hamming INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.LE Leichner B.L.Bartlett D.G.Turner Visitor Center Manager M.E.Russo"t.")0 A'.~9511150003 951031 PDR.ADOCK 05000315 R''DR N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period Oct 1995 notes 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
h RECIPIENT           COPIES            RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL      ID   CODE/NAME       LTTR ENCL PD3-1 PD                 1    1      HICKMAN,J              1      1 INTERNAL: AEOD/SPD/RRAB             1    1            CENTER    0-    1      1 NRR/DRPM/PECB           1    1      RGN                    1      1 EXTERNAL:,LITCO BRYCE,J   H       1     1     NOAC                   1     1 NRC PDR                  1     1 NOTE TO ALL "RZDS" RECIPIENTS:
If Any (Net MWe)10.Reasons For Restrictions.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18'et Elect.Energy Gen.(MWH)19.Unit Service Factor 20'nit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.to Date 744.0 7296.0 103.2 4785.2 0.0 0.0 42.6 4702.0 0.0 0.0 32089 14311097 6680 4651710 5231 4482218 5.7 64.4 5.7 64'0.7 61.4 0.7 60.2 72.7 14.4 Months (Type, Date,and Cumm.182616.0 136696.1 463.0 134525.6 321.0 396431674 128657150 123763533 74.5 74.5 67.5 65.8 6.1 Duration):
TOTAL NUMBER OF COPIES REQUIRED: LTTR             9   ENCL     9
25.If Shut Down At End of Report Period, Estimated Date of Startup: November 6 1995 26.Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION AVERAGE DAILY POWER LEVEL (MWe-Net)MONTH DOCKET NO.50-315 UNIT ONE DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 Oct 1995 DAY 95/10/01 95/10/02 95/10/03 95/10/04 95/10/05 95/10/06 95/10/07 95/10/08 95/10/09 95/10/10 95/10/11 95/10/12 95/10/13 95/10/14 95/10/15 95/10/16 AVERAGE DAILY POWER LEVEL DAY 95/10/17 95/10/18 95/10/19 95/10/20 95/10/21 95/10/22 95/10/23 95/10/24 95/10/25 95/10/26 95/10/27 95/10/28 95/10/29 95/10/30 95/10/31 AVERAGE DAILY POWER LEVEL 0 0 0 0 0 0 0 0 53 5 150 11 0 0 0


DOCKET NO: UNIT NAME: COMPLETED BY: TELEPHONE:
0
DATE: PAGE: 50-315 D.C.Cook Unit 1 M.E.Russo 616-465-5901 November 6, 1995 Page 1 of 3 The unit entered this reporting period in Mode 6 at 0~RTP for the Cycle 14 to 15 maintenance/refueling outage.Core alterations halted at the end of last period due to a damaged fuel assembly, resumed this period.The Reactor was taken critical October 23, 1995 at 0742 for the first time in fuel cycle 15.The Reactor was manually tripped October 24, 1995 at 0349 to perform a balance of Reactor Coolant Pump 512.Criticality was achieved October 24, 1995 at 1557 and entry into Mode 1 occurred October 25, 1995 at 0115.The Turbine Generator was paralleled to the grid October 25, 1995 at 1014 where power escalation to 29%RTP began.Reactor power was decreased.
'I
October 26, 1995 at 0010 to perform Main Turbine Overspeed Testing.Power ascension to 29.RTP commenced October 27, 1995 at 0623 following grid parallel.Unit shutdown was commenced due to increased concentrations of sodium in each Steam Generator on October 28, 1995 at 0030.Leak source identification remained under investigation for the balance of this period.Power descent continued to Mode 5 to perform scheduled forced outage maintenance.
 
The unit exited this reporting period in Mode 5 at 0.RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of October was 6680 MWH.10-05-95 0358 Recommenced Core reload.10-07-95 1022 Core reload complete DOCKET NO: UNIT NAME: COMPLETED BY: TELEPHONE:
November 6, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
DATE: PAGE: 50-315 D.C.Cook Unit 1 M.E.Russo 616-465-5901 November 6, 1995 Page 2 of 3 DEL'~*(cont'd)10-10-95 12S2 Entered Reactor Mode 5.10-16-95 2314 Entered Reactor Mode 4.10-18-95 0017 Entered Reactor Mode 3.10-23-95 0434 Entered Reactor Mode 2.0742 Reactor.critical for the first time in Fuel Cycle 15.10-24-95 0349 Reactor Trip Breakers opened.Entered Reactor Mode 3 to balance RCP g12.0820 1204 Completed RCP g12 balance.Entered Reactor Mode 2.1557 Reactor critical.10-25-95 0115 Entered Reactor Mode 1.1014 2033 Main Generator paralleled to the grid.Reactor power at 29%RTP.10-26-95 0010 Commenced Reactor power decrease to perform Main Turbine Overspeed Testing.0852 0855 0910 Opened Main Generator output breakers.Commenced Main Turbine Overspeed Testing.Completed Main Turbine Overspeed Testing.
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1995 is submitted.
0 DOCKET NO: UNIT NAME: COMPLETED BY: TELEPHONE:
Respectfully, A.A. Blind Plant Manager Attachment c    NRC  Region    III D.RE Hahn R.C. Callen S. Hamming INPO Records      Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.
DATE: PAGE: 50-315 D.C.Cook Unit 1 M.E.Russo 616-465-5901 November 6, 1995 Page 3 of 3 D~~~*(cont')10-26-95 0925 Manually tripped Main Turbine to perform placement of balancing weight.1030 Entered Reactor Mode 2.10-27-95 0135 Reset Main Turbine.0242 Entered Reactor Mode 1~0623 Main Generator paralleled to the grid.0811 Reactor power at 29~RTP.10-28-95 0030 Commenced.
S.J. Brewer D.W. Paul S.H. Steinhart J.LE Leichner B.L. Bartlett D.G. Turner Visitor Center      Manager M.E. Russo "t .")
unit shutdown due to increased concentrations of sodium in each Steam Generator.
0A '. ~
0215 Manually tripped the Main Turbine.Entered Reactor Mode 2.0706 Manually tripped the Reactor.Entered Reactor Mode 3.10-29-95 1525 0938 Entered Reactor Mode 4.Entered Reactor Mode 5.*All times referenced to Eastern Standard.
9511150003 951031 PDR    ADOCK 05000315 R
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1995 UNIT NAME: DATE: COMPLETED BY TELEPHONE:
    '
PAGE: D.C.COOK UNIT 1 November 6, 1995 M.E.Russo 616-465-5901 Page 1 of 2 DURATION NO.DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM REASON REACTOR REPORT NO.CODE COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE 318 950716 S 586.2 B,C N/A N/A N/A The unit was removed from service 950716 at 1053 EST for Main Transformer replacement followed by cycle 14 to 15 refueling/maintenance outage.All refueling/maintenance activities were completed and the turbine generator was paralleled to the grid 951025 at 1014 EST.Total length of the outage was 2421.7 hrs.319 951026 S 21.5 N/A N/A N/A The turbine generator was removed from parallel 951026 at 0852 EST to perform turbine overspeed testing.Following a Main Turbine balance weight placement, testing was successfully completed and the unit was paralleled to the grid 951027 at 0623 EST.F S Forced Scheduled 2 Reason: A: Ecuipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 Exhibit I: Same Source UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH'i OCTOBER 1995 UNZT NAME: DATE: COMPLETED BY: TELEPHONE:
      .
PAGE: D.C.COOK UNIT 1 November 6, 1995 M.E.Russo 616-465-5901 Page 2 of 2 DURATION NO.DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.CODE CODE TO PREVENT RECURRENCE 320 951028 F 93.7 N/A N/A N/A The turbine generator was removed fr~service 951028 at 0215 EST and the reactor shutdown 951028 at 0706 EST due to increased concentrations of sodium in each Steam Generator.
                  'DR
Leak source identification remained under investigation for the balance of this period.F S: Forced Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 Exhibit I: Same Source
 
'e+l~~A 4 r+}}
N.R.C. OPERATING DATA  REPORT DOCKET NO. 50-315 DATE 06/Nov/95 COMPLETED BY  Janisse JD TELEPHONE  616-465-5901 OPERATING STATUS
: 1. Unit  Name                  D. C. Cook Unit 1
: 2. Reporting Period                          Oct 1995 notes
: 3. Licensed Thermal Power (MWt)                  3250
: 4. Name Plate Rating (Gross MWe)                 1152
: 5. Design Electrical Rating (Net MWe)            1020
: 6. Maximum Dependable Capacity (GROSS MWe) 1056
: 7. Maximum Dependable Capacity (Net MWe)        1000
: 8. If Changes Occur    in Capacity Ratings (Items no. 3 through    7)  Since Last Report Give Reasons
: 9. Power Level To Which Restricted.      If Any  (Net MWe)
: 10. Reasons For Restrictions.      If Any:
This Mo. Yr. to Date      Cumm.
: 11. Hours  in Reporting Period                  744.0      7296.0    182616.0
: 12. No. of Hrs. Reactor   Was  Critical        103.2      4785.2     136696.1
: 13. Reactor Reserve Shutdown Hours                0.0          0.0        463.0
: 14. Hours Generator on Line                      42.6      4702.0    134525.6
: 15. Unit Reserve Shutdown Hours                  0.0          0.0        321.0
: 16. Gross Therm. Energy Gen. (MWH)              32089    14311097    396431674 Gross Elect. Energy Gen. (MWH) 17.
18 'et    Elect. Energy Gen. (MWH) 6680 5231 4651710 4482218 128657150 123763533 19.
20 'nit Unit Service Factor Availability Factor
: 21. Unit Capacity Factor    (MDC Net) 5.7 5.7 0.7 64.4 64 '
61.4 74.5 74.5 67.5
: 22. Unit Capacity Factor (DER Net)                0.7        60.2         65.8
: 23. Unit Forced Outage Rate                      72.7        14.4          6.1
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
None
: 25. If  Shut Down November At End  of Report Period, Estimated Date of Startup:
1995
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
AVERAGE DAILY POWER LEVEL  (MWe-Net)
DOCKET NO.        50-315 UNIT                  ONE DATE        06/Nov/95 COMPLETED BY Janisse JD TELEPHONE   616-465-5901 MONTH        Oct 1995 AVERAGE DAILY                        AVERAGE DAILY DAY      POWER LEVEL            DAY          POWER LEVEL 95/10/01                        95/10/17                0 95/10/02                        95/10/18                0 95/10/03                        95/10/19                0 95/10/04                        95/10/20                0 95/10/05                        95/10/21                0 95/10/06                        95/10/22                0 95/10/07                        95/10/23                0 95/10/08                        95/10/24                0 95/10/09                        95/10/25              53 95/10/10                        95/10/26                5 95/10/11                        95/10/27              150 95/10/12                        95/10/28              11 95/10/13                        95/10/29                0 95/10/14                        95/10/30                0 95/10/15                        95/10/31                0 95/10/16
 
DOCKET NO:       50-315 UNIT NAME:        D.C. Cook Unit 1 COMPLETED BY:    M.E. Russo TELEPHONE:       616-465-5901 DATE:             November 6, 1995 PAGE:             Page 1    of  3 The unit entered this reporting period in        Mode 6  at  0 ~  RTP  for the Cycle 14 to 15 maintenance/refueling outage. Core          alterations halted at the end of last period due to a damaged fuel assembly, resumed this period. The Reactor was taken critical October 23, 1995 at 0742 for the first time in fuel cycle 15.
The Reactor was manually tripped October 24, 1995 at 0349 to perform a balance of Reactor Coolant Pump 512.       Criticality    was achieved October 24, 1995 at 1557 and entry into Mode 1 occurred October 25, 1995 at 0115. The Turbine Generator was paralleled to the grid October 25, 1995 at 1014 where power escalation to 29% RTP began.
Reactor power was decreased. October 26, 1995 at 0010 to perform Main Turbine Overspeed Testing. Power ascension to 29. RTP commenced October 27, 1995 at 0623 following grid parallel.
Unit shutdown   was commenced due   to increased concentrations of sodium in each Steam Generator on October 28, 1995 at 0030. Leak source identification remained under investigation for the balance of this period. Power descent continued to Mode 5 to perform scheduled forced outage maintenance.
The unit exited this reporting period in      Mode 5  at 0. RTP.
There were no challenges    to the pressurizer safety valves or power operated  relief  valves.
Gross  electrical generation for the    month  of October    was 6680 MWH.
10-05-95      0358      Recommenced  Core  reload.
10-07-95      1022      Core  reload complete
 
DOCKET NO:        50-315 UNIT NAME:        D.C. Cook Unit 1 COMPLETED BY:    M.E. Russo TELEPHONE:        616-465-5901 DATE:            November 6, 1995 PAGE:            Page 2  of 3 DEL'~* (cont'd) 10-10-95  12S2 Entered Reactor  Mode 5.
10-16-95  2314 Entered Reactor  Mode  4.
10-18-95  0017 Entered Reactor  Mode 3.
10-23-95  0434 Entered Reactor  Mode  2.
0742 Reactor. critical  for the  first  time in Fuel Cycle 15.
10-24-95  0349 Reactor Trip Breakers opened.      Entered Reactor Mode 3 to balance RCP g12.
0820 Completed  RCP g12  balance.
1204 Entered Reactor  Mode  2.
1557 Reactor  critical.
10-25-95  0115 Entered Reactor  Mode 1.
1014 Main Generator  paralleled to the grid.
2033 Reactor power at  29% RTP.
10-26-95  0010 Commenced Reactor power decrease      to perform Main Turbine Overspeed Testing.
0852 Opened Main Generator    output breakers.
0855 Commenced Main  Turbine Overspeed Testing.
0910 Completed Main Turbine Overspeed Testing.
 
0                DOCKET NO:    50-315 UNIT NAME:    D.C. Cook Unit 1 COMPLETED BY:  M.E. Russo TELEPHONE:    616-465-5901 DATE:          November 6, 1995 PAGE:          Page  3 of 3 D~~~*    (cont ')
10-26-95      0925    Manually tripped Main Turbine to perform placement of balancing weight.
1030    Entered Reactor  Mode 2.
10-27-95      0135    Reset Main Turbine.
0242    Entered Reactor  Mode 1  ~
0623    Main Generator  paralleled to the grid.
0811    Reactor power at 29~    RTP.
10-28-95      0030    Commenced. unit  shutdown due to increased concentrations  of sodium in each Steam Generator.
0215    Manually tripped the Main Turbine. Entered Reactor Mode 2.
0706    Manually tripped the Reactor. Entered Reactor Mode  3.
1525    Entered Reactor  Mode  4.
10-29-95      0938    Entered Reactor  Mode 5.
* All times  referenced to Eastern Standard.
 
UNIT    SHUTDOWNS AND POWER REDUCTIONS                                UNIT NAME:        D.C. COOK UNIT 1 DATE:            November 6, 1995 REPORT MONTH: OCTOBER 1995                                      COMPLETED BY      M.E. Russo TELEPHONE:        616-465-5901 PAGE:            Page 1 of  2 METHOD OF SHUTTING    LICENSEE DURATION                DOWN        EVENT        SYSTEM  COMPONENT      CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE      HOURS          REASON  REACTOR    REPORT NO. CODE    CODE          TO PREVENT RECURRENCE 318 950716    S      586. 2        B,C                    N/A        N/A      N/A        The unit was removed from service 950716 at 1053 EST for Main Transformer replacement followed by cycle 14 to 15 refueling/maintenance outage. All refueling/maintenance activities were completed and the turbine generator was paralleled to the grid 951025 at 1014 EST. Total length of the outage was 2421.7 hrs.
319 951026    S        21. 5                              N/A        N/A      N/A        The  turbine generator was removed from parallel  951026 at 0852 EST to perform turbine overspeed testing. Following a Main Turbine balance weight placement, testing was successfully completed and the unit  was paralleled  to the grid 951027  at  0623 EST.
2                                                                                            5 F  Forced        Reason:                                Method:              Exhibit  G -  Instructions      Exhibit  I:  Same S  Scheduled    A: Ecuipment Failure (Explain)        1: Manual            for preparation of data                        Source B: Maintenance or Test                2: Manual Scram      entry sheets for Licensee C:  Refueling                        3: Automatic Scram  Event Report (LER) File D:  Regulatory Restriction            4:  Other (Explain) (NUREG  0161)
E:  Operator Training and License Examination F:  Administrative G:  Operational Error (Explain)
H:  Other (Explain)
 
UNIT    SHUTDOWNS AND POWER REDUCTIONS                                    UNZT NAME:      D.C. COOK UNIT 1 DATE:            November 6, 1995 REPORT MONTH'i OCTOBER 1995                                        COMPLETED BY:    M.E. Russo TELEPHONE:      616-465-5901 PAGE:            Page 2  of 2 METHOD OF SHUTTING      LICENSEE DURATION                DOWN          EVENT      SYSTEM    COMPONENT      CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE      HOURS        REASON    REACTOR      REPORT NO. CODE      CODE          TO PREVENT RECURRENCE 320 951028    F        93. 7                                  N/A      N/A        N/A        The  turbine generator was removed service 951028 at 0215 EST and the fr~
reactor shutdown 951028 at 0706 EST due to increased concentrations of sodium  in each Steam Generator. Leak source  identification remained under investigation for the balance of this period.
2                                        3                    4                              5 F  Forced        Reason:                                  Method:              Exhibit  G - Instructions      Exhibit  I:  Same S: Scheduled    A: Equipment Failure (Explain)          1: Manual            for preparation of data                      Source B: Maintenance or Test                  2: Manual Scram      entry sheets for Licensee C:  Refueling                            3: Automatic Scram    Event Report (LER) File D:  Regulatory Restriction              4:  Other (Explain)  (NUREG  0161)
E:  Operator Training and License Examination F:  Administrative G:  Operational Error (Explain)
H:  Other (Explain)
 
'e
    +  l
    ~  ~  A 4
r+}}

Revision as of 12:29, 22 October 2019

Monthly Operating Rept for Oct 1995 for DC Cook Nuclear Plant Unit 1.W/951106 Ltr
ML17332B009
Person / Time
Site: Cook 
Issue date: 10/31/1995
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511150003
Download: ML17332B009 (12)


Text

y'PR10RXTY 1y (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9511150003 DOC.DATE: 95/10/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION JANISSE,J.D. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele BLIND,A.A. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1995 for DC Cook Nuclear-Plant Unit 1.W/951106 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL 2 SIZE:

NOTES:

h RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENTER 0- 1 1 NRR/DRPM/PECB 1 1 RGN 1 1 EXTERNAL:,LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

0

'I

November 6, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1995 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c NRC Region III D.RE Hahn R.C. Callen S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J. Brewer D.W. Paul S.H. Steinhart J.LE Leichner B.L. Bartlett D.G. Turner Visitor Center Manager M.E. Russo "t .")

0A '. ~

9511150003 951031 PDR ADOCK 05000315 R

'

.

'DR

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Oct 1995 notes
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 7296.0 182616.0
12. No. of Hrs. Reactor Was Critical 103.2 4785.2 136696.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 42.6 4702.0 134525.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 32089 14311097 396431674 Gross Elect. Energy Gen. (MWH) 17.

18 'et Elect. Energy Gen. (MWH) 6680 5231 4651710 4482218 128657150 123763533 19.

20 'nit Unit Service Factor Availability Factor

21. Unit Capacity Factor (MDC Net) 5.7 5.7 0.7 64.4 64 '

61.4 74.5 74.5 67.5

22. Unit Capacity Factor (DER Net) 0.7 60.2 65.8
23. Unit Forced Outage Rate 72.7 14.4 6.1
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

None

25. If Shut Down November At End of Report Period, Estimated Date of Startup:

6 1995

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 06/Nov/95 COMPLETED BY Janisse JD TELEPHONE 616-465-5901 MONTH Oct 1995 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 95/10/01 95/10/17 0 95/10/02 95/10/18 0 95/10/03 95/10/19 0 95/10/04 95/10/20 0 95/10/05 95/10/21 0 95/10/06 95/10/22 0 95/10/07 95/10/23 0 95/10/08 95/10/24 0 95/10/09 95/10/25 53 95/10/10 95/10/26 5 95/10/11 95/10/27 150 95/10/12 95/10/28 11 95/10/13 95/10/29 0 95/10/14 95/10/30 0 95/10/15 95/10/31 0 95/10/16

DOCKET NO: 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: M.E. Russo TELEPHONE: 616-465-5901 DATE: November 6, 1995 PAGE: Page 1 of 3 The unit entered this reporting period in Mode 6 at 0 ~ RTP for the Cycle 14 to 15 maintenance/refueling outage. Core alterations halted at the end of last period due to a damaged fuel assembly, resumed this period. The Reactor was taken critical October 23, 1995 at 0742 for the first time in fuel cycle 15.

The Reactor was manually tripped October 24, 1995 at 0349 to perform a balance of Reactor Coolant Pump 512. Criticality was achieved October 24, 1995 at 1557 and entry into Mode 1 occurred October 25, 1995 at 0115. The Turbine Generator was paralleled to the grid October 25, 1995 at 1014 where power escalation to 29% RTP began.

Reactor power was decreased. October 26, 1995 at 0010 to perform Main Turbine Overspeed Testing. Power ascension to 29. RTP commenced October 27, 1995 at 0623 following grid parallel.

Unit shutdown was commenced due to increased concentrations of sodium in each Steam Generator on October 28, 1995 at 0030. Leak source identification remained under investigation for the balance of this period. Power descent continued to Mode 5 to perform scheduled forced outage maintenance.

The unit exited this reporting period in Mode 5 at 0. RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of October was 6680 MWH.

10-05-95 0358 Recommenced Core reload.

10-07-95 1022 Core reload complete

DOCKET NO: 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: M.E. Russo TELEPHONE: 616-465-5901 DATE: November 6, 1995 PAGE: Page 2 of 3 DEL'~* (cont'd) 10-10-95 12S2 Entered Reactor Mode 5.

10-16-95 2314 Entered Reactor Mode 4.

10-18-95 0017 Entered Reactor Mode 3.

10-23-95 0434 Entered Reactor Mode 2.

0742 Reactor. critical for the first time in Fuel Cycle 15.

10-24-95 0349 Reactor Trip Breakers opened. Entered Reactor Mode 3 to balance RCP g12.

0820 Completed RCP g12 balance.

1204 Entered Reactor Mode 2.

1557 Reactor critical.

10-25-95 0115 Entered Reactor Mode 1.

1014 Main Generator paralleled to the grid.

2033 Reactor power at 29% RTP.

10-26-95 0010 Commenced Reactor power decrease to perform Main Turbine Overspeed Testing.

0852 Opened Main Generator output breakers.

0855 Commenced Main Turbine Overspeed Testing.

0910 Completed Main Turbine Overspeed Testing.

0 DOCKET NO: 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: M.E. Russo TELEPHONE: 616-465-5901 DATE: November 6, 1995 PAGE: Page 3 of 3 D~~~* (cont ')

10-26-95 0925 Manually tripped Main Turbine to perform placement of balancing weight.

1030 Entered Reactor Mode 2.

10-27-95 0135 Reset Main Turbine.

0242 Entered Reactor Mode 1 ~

0623 Main Generator paralleled to the grid.

0811 Reactor power at 29~ RTP.

10-28-95 0030 Commenced. unit shutdown due to increased concentrations of sodium in each Steam Generator.

0215 Manually tripped the Main Turbine. Entered Reactor Mode 2.

0706 Manually tripped the Reactor. Entered Reactor Mode 3.

1525 Entered Reactor Mode 4.

10-29-95 0938 Entered Reactor Mode 5.

  • All times referenced to Eastern Standard.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D.C. COOK UNIT 1 DATE: November 6, 1995 REPORT MONTH: OCTOBER 1995 COMPLETED BY M.E. Russo TELEPHONE: 616-465-5901 PAGE: Page 1 of 2 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 318 950716 S 586. 2 B,C N/A N/A N/A The unit was removed from service 950716 at 1053 EST for Main Transformer replacement followed by cycle 14 to 15 refueling/maintenance outage. All refueling/maintenance activities were completed and the turbine generator was paralleled to the grid 951025 at 1014 EST. Total length of the outage was 2421.7 hrs.

319 951026 S 21. 5 N/A N/A N/A The turbine generator was removed from parallel 951026 at 0852 EST to perform turbine overspeed testing. Following a Main Turbine balance weight placement, testing was successfully completed and the unit was paralleled to the grid 951027 at 0623 EST.

2 5 F Forced Reason: Method: Exhibit G - Instructions Exhibit I: Same S Scheduled A: Ecuipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS UNZT NAME: D.C. COOK UNIT 1 DATE: November 6, 1995 REPORT MONTH'i OCTOBER 1995 COMPLETED BY: M.E. Russo TELEPHONE: 616-465-5901 PAGE: Page 2 of 2 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 320 951028 F 93. 7 N/A N/A N/A The turbine generator was removed service 951028 at 0215 EST and the fr~

reactor shutdown 951028 at 0706 EST due to increased concentrations of sodium in each Steam Generator. Leak source identification remained under investigation for the balance of this period.

2 3 4 5 F Forced Reason: Method: Exhibit G - Instructions Exhibit I: Same S: Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 0161)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

'e

+ l

~ ~ A 4

r+