{{#Wiki_filter:AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York,¹Y.10004 (212)440-9000 February 25, 1983 AEP:NRC:0631B Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555  
{{#Wiki_filter:AMER1CAN -ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.       1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NUREG-0737, ITEM   II.F.1.6   TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Dear Mr. Denton:==
 
In our letter No. AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 Our 3.etter included a statement to the
                            ~
effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737. However, by way of his February 3, 1983, letter to Mr.
John E. Dolan, Mr. William O. Miller requested the remittance of $ 4,400 to cover the NRC review expenses.
We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal. Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S .required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6. Mr.
Eisenhut.'s letter again requests that the T/S changes be submittal.
consolidated'nto one The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public. By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment. Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by  NUREG-0737.


==Dear Mr.Denton:==
In our letter No.AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S)changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS)into service to satisfy the requirements of NUREG-0737, Item II.F.1.6~Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
However, by way of his February 3, 1983, letter to Mr.John E.Dolan, Mr.William O.Miller requested the remittance of$4,400 to cover the NRC review expenses.We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Furthermore, a draft Generic Letter transmitted by Mr.Darrell G.Eisenhut to Mr.Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S.required"for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.Mr.Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of.Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P.exich Assistant Vice President Nuclear Engineering MPA/md cc: John E.Dolan-Columbus R.S.Hunter R.W.Jurgensen W.G.Smith, Jr.-Bridgman R.C.Callen G.Charnoff W.0.?Q.lier-NRC NRC Resident Inspector at Cook Plant-Bridgman A~"l'I (}}
Very truly yours, Nil n P. exich Assistant Vice President Nuclear Engineering MPA/md cc: John E. Dolan   - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman
 
A ~
    "l
  'I
(}}

Revision as of 11:53, 22 October 2019

Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
ML17334A462
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323
Download: ML17334A462 (3)


Text

AMER1CAN -ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

In our letter No. AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 Our 3.etter included a statement to the

~

effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737. However, by way of his February 3, 1983, letter to Mr.

John E. Dolan, Mr. William O. Miller requested the remittance of $ 4,400 to cover the NRC review expenses.

We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal. Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.

Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S .required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6. Mr.

Eisenhut.'s letter again requests that the T/S changes be submittal.

consolidated'nto one The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public. By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment. Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.

This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, Nil n P. exich Assistant Vice President Nuclear Engineering MPA/md cc: John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman