{{#Wiki_filter:~J REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)~'CCESSION NBR: 8801260051 DOC.DATE: 88/01/20 NOTARIZED:
{{#Wiki_filter:~ J                     REGULA     Y INFORMATION       DISTRIBUTIO         YSTEM (RIDS)
NO DOCKET FACIL: 50-250 Turkey Point Planti Unit Si Florida Power and Light C 05000250 50-251 Tur k e g P o in t P lan t I Un i t OI F 1 or i d a Power and L i g h t C 05000251 AUTH.NAME AUTHOR AFFILIATION NOODYI C.O.Florida PoweY 5 Light Co.REC IP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
      ~
        'CCESSION NBR: 8801260051         DOC. DATE:   88/01/20       NOTARIZED: NO           DOCKET FACIL: 50-250 Turkey Point             Planti Unit     Si Florida     Power and Light     C 05000250 50-251 Tur k e g P o in t   P lan t I Un it  OI F 1 or i                   i t d a Power and L g h     C 05000251 AUTH. NAME                 AUTHOR   AFFILIATION NOODYI C. O.               Florida     PoweY 5 Light Co.
REC IP. NAME               RECIPIENT AFFILIATION Document Control Branch           (Document   Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards"Select Sg,s Assessment Progress Summargi" for Dec 1987.DISTRIBUTION CODE: AOOID COPIES RECEIVED: LTR i ENCL g SIZE: TITLE: OR Submittal:
Forwards "Select     Sg,s Assessment     Progress     Summargi
General Distribution NOTES: RECIPIENT ID CODE/NAME PD2-2 LA McDONALDI D COPIES LTTR ENCL 0 1 REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5 5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB NRFgPW RB~ILE 01 EXTERNAL: LPDR NSIC 0 1 1 1 NRR/DEST/ADS NRR/DEST/MTB NRR/DOE*/TSB OQC/HDS2 RES/DE/EIB NRC PDR 1 1 1 1 1 0 1 1 1, 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17 il  
                                                                                      "   for Dec 1987.
~~
DISTRIBUTION CODE: AOOID               COPIES RECEIVED: LTR           i ENCL g   SIZE:
P.O.14000, JUNO BEACH, FL 33408 0420 JANUARY.2 0 1988 L-88-31 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE:       OR   Submittal: General Distribution NOTES:
Re: Turkey Point Units 3 and 4 Docket.Nos.50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the December 1987 progress summary of the Select System Assessment.
RECIPIENT             COPIES              REC IP IENT            COPIES ID CODE/NAME           LTTR ENCL         ID CODE/NAME           LTTR ENCL PD2-2 LA                        0      PD2-2 PD                   5     5 McDONALDI D                      1 INTERNAL: ARM/DAF/LFMB                             0      NRR/DEST/ADS                1    1 NRR/DEST/CEB                            NRR/DEST/MTB                1    1 NRR/DEST/RSB                    1      NRR/DOE*/TSB NRFgPW      RB                          OQC/HDS2                         0
Should there be any questions regarding this information, please contact us.Very truly yours, C.O.o Execut e Vice President COW/SDF/gp Attachment cc: Dr.Z.Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Xnspector, USNRC, Turkey Point Plant 880i2b005i 880120 PDR ADOCK 05000250 R PDR'~SDF/010.SS 00 an FPL Group company
                    ~ILE          01                      RES/DE/EIB 1
1     1 EXTERNAL: LPDR                                      1       NRC PDR                    1,    1 NSIC                      1 TOTAL NUMBER OF COPIES REQUIRED: LTTR                       20   ENCL     17 il


SELECT SYSTEM REVIEW DECEMBER 1987 PROGRESS Desi Basis Reconstitution Work continues on a risk based assessment of historic Plant Changes/Modifications.
~ ~
Scope finalization is expected in January for the total effort.Reconstituted design basis documents have been issued for trial use to appropriate groups within the Company.Reconstitution of design basis for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Coolers is expected to start on schedule in January.Design basis verification activities are proceeding in accordance with the Integrated Schedule.Safet En ineerin Grou SEG Review System Engineer review of the applicable sections of the Unit 3 closeout report is complete with corrective actions having been initiated where necessary.
P. O. 14000, JUNO BEACH, FL 33408 0420 JANUARY. 2 0 1988 L-88-31 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Confi ration Mana ement Revisions to the affected drawings resulting from implementation of Select Systems modifications during the Unit 3 Refueling Outage were completed on schedule by January 11, 1988.Other Si ificant Pro ress o Completed Auxiliary Feedwater (AFW)System steam trap/drain mods.o Completed AFW pump performance testing/evaluation for modified rotors.o Completed implementation of PC/M 87-365 for Component Cooling Water (CCW)sample system piping addition.o Completed CCW vendor technical manual review for storage requirements.
Re:  Turkey Point Units  3 and 4 Docket. Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the December 1987 progress            summary      of the Select System Assessment.
o Revised CCW T&E Drawing to show heat exchanger valve positions.
Should there    be any questions  regarding this information, please contact us.
o Completed modifications to Instrument Air (IA)regulator drain valves.SDF/010.SS  
Very  truly  yours, C. O. o Execut  e Vice President COW/SDF/gp Attachment cc:  Dr. Z. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Xnspector, USNRC, Turkey Point Plant 880i2b005i 880120 05000250 PDR  ADOCK      PDR'~
R SDF/010.SS                                                               00 an FPL Group company


Select System Review December 1987 Progress Page 2 of 2 o Developed T&E Drawing for IA inside containment.
SELECT SYSTEM REVIEW DECEMBER 1987 PROGRESS Desi    Basis Reconstitution Work continues    on a  risk based assessment of historic Plant Changes/Modifications.        Scope finalization is expected in January for the total      effort.
0 Dispositioned IA NCR on CV-2803 actuator (details available on request).0 Incorporated Reactor Protection System (RPS)shunt trip requirements into various documents (details available on request).0'odified indicators to show when inverters are fed by Constant Voltage Transformer.
Reconstituted    design    basis documents have been issued for trial  use  to appropriate groups within the Company.
SDF/010.SS}}
Reconstitution of design basis for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Coolers is expected to start on schedule in January.
Design basis verification activities are proceeding in accordance with the Integrated Schedule.
Safet En ineerin Grou SEG Review System Engineer review of the applicable sections of the Unit 3 closeout report is complete with corrective actions having been  initiated  where necessary.
Confi ration    Mana ement Revisions to the affected drawings resulting from implementation of Select Systems modifications during the Unit 3 Refueling Outage were completed on schedule by January 11, 1988.
Other Si    ificant Pro ress o    Completed Auxiliary          Feedwater    (AFW)  System    steam trap/drain  mods.
o    Completed    AFW  pump  performance  testing/evaluation    for modified rotors.
o    Completed implementation of PC/M 87-365 for Component Cooling Water (CCW) sample system piping addition.
o    Completed  CCW  vendor technical manual review    for storage requirements.
o    Revised  CCW  T&E  Drawing  to show  heat exchanger  valve positions.
o    Completed modifications to Instrument Air (IA) regulator drain valves.
SDF/010.SS
 
Select System Review December 1987 Progress Page 2 of 2 o   Developed T&E Drawing for IA inside containment.
0   Dispositioned IA NCR on CV-2803 actuator (details available on request).
0   Incorporated Reactor Protection System (RPS) shunt trip requirements into various documents (details available on request).
0'odified Constant indicators to   show when Voltage Transformer.
inverters are fed by SDF/010.SS}}

Revision as of 10:14, 22 October 2019

Forwards Dec 1987 Progress Summary of Select Sys Assessment
ML17342B086
Person / Time
Site: Turkey Point  
Issue date: 01/20/1988
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-31, NUDOCS 8801260051
Download: ML17342B086 (8)


Text

~ J REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

~

'CCESSION NBR: 8801260051 DOC. DATE: 88/01/20 NOTARIZED: NO DOCKET FACIL: 50-250 Turkey Point Planti Unit Si Florida Power and Light C 05000250 50-251 Tur k e g P o in t P lan t I Un it OI F 1 or i i t d a Power and L g h C 05000251 AUTH. NAME AUTHOR AFFILIATION NOODYI C. O. Florida PoweY 5 Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Select Sg,s Assessment Progress Summargi

" for Dec 1987.

DISTRIBUTION CODE: AOOID COPIES RECEIVED: LTR i ENCL g SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 0 PD2-2 PD 5 5 McDONALDI D 1 INTERNAL: ARM/DAF/LFMB 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB NRR/DEST/MTB 1 1 NRR/DEST/RSB 1 NRR/DOE*/TSB NRFgPW RB OQC/HDS2 0

~ILE 01 RES/DE/EIB 1

1 1 EXTERNAL: LPDR 1 NRC PDR 1, 1 NSIC 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17 il

~ ~

P. O. 14000, JUNO BEACH, FL 33408 0420 JANUARY. 2 0 1988 L-88-31 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket. Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the December 1987 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, C. O. o Execut e Vice President COW/SDF/gp Attachment cc: Dr. Z. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Xnspector, USNRC, Turkey Point Plant 880i2b005i 880120 05000250 PDR ADOCK PDR'~

R SDF/010.SS 00 an FPL Group company

SELECT SYSTEM REVIEW DECEMBER 1987 PROGRESS Desi Basis Reconstitution Work continues on a risk based assessment of historic Plant Changes/Modifications. Scope finalization is expected in January for the total effort.

Reconstituted design basis documents have been issued for trial use to appropriate groups within the Company.

Reconstitution of design basis for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Coolers is expected to start on schedule in January.

Design basis verification activities are proceeding in accordance with the Integrated Schedule.

Safet En ineerin Grou SEG Review System Engineer review of the applicable sections of the Unit 3 closeout report is complete with corrective actions having been initiated where necessary.

Confi ration Mana ement Revisions to the affected drawings resulting from implementation of Select Systems modifications during the Unit 3 Refueling Outage were completed on schedule by January 11, 1988.

Other Si ificant Pro ress o Completed Auxiliary Feedwater (AFW) System steam trap/drain mods.

o Completed AFW pump performance testing/evaluation for modified rotors.

o Completed implementation of PC/M 87-365 for Component Cooling Water (CCW) sample system piping addition.

o Completed CCW vendor technical manual review for storage requirements.

o Revised CCW T&E Drawing to show heat exchanger valve positions.

o Completed modifications to Instrument Air (IA) regulator drain valves.

SDF/010.SS

Select System Review December 1987 Progress Page 2 of 2 o Developed T&E Drawing for IA inside containment.

0 Dispositioned IA NCR on CV-2803 actuator (details available on request).

0 Incorporated Reactor Protection System (RPS) shunt trip requirements into various documents (details available on request).

0'odified Constant indicators to show when Voltage Transformer.

inverters are fed by SDF/010.SS